Review OSG Integration & Certification Activity scope and process. Near term Grid3dev ... Develop processes for validation and certification of OSG deployments ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 13
Provided by: Mar5336
Category:

less

Transcript and Presenter's Notes

Title: OSG Integration and Certification Activity


1
OSG Integration and Certification Activity
Grid3dev Meeting
  • Rob Gardner
  • Leigh Grundhoefer
  • OSG Integration Grid3dev
  • Oct 21, 2004

2
Outline for Today
  • Review OSG Integration Certification Activity
    scope and process
  • Near term Grid3dev
  • Issues for next meeting (Thursday, Oct 28)

3
Purpose, 1
  • Integrate middleware services from technology
    providers targeted for the OSG
  • Develop processes for validation and
    certification of OSG deployments
  • Provide testbed for evaluation and testing of new
    services and applications
  • Test and exercise installation and distribution
    methods
  • Devise best practices for configuration management

10/8/04
4
Purpose, 2
  • Establish framework for releases
  • Provide feedback to service providers and VO
    application developers
  • Allow contributions and testing of new,
    interoperable technologies with established
    baseline services
  • Supply requirements and feedback for new tools,
    technology, and practices in all these areas

10/8/04
5
OSG deployment landscape
VOs apps
TG MonInfo
TG Policy
Arch
MIS
Policy
OSG deployment
TG Storage
TG Security
TG Support Centers
Chairs
10/8/04
6
Activity Model, 1
  • Requirements and schedule are determined with the
    OSG deployment activity
  • The specific program of work will be driven by
    the deliverables from the satellite activities
  • Effort will be drawn from affiliated OSG projects
    depending on the service
  • Architectural coherence will maintained through
    participation with the blueprint group
  • Configuration coherence is maintained with the
    deployment group

10/8/04
7
Grid3dev, 1
  • The development core of the existing Grid3 that
    we are adding services to for the spring OSG
    deployment
  • Package content
  • VDT 1.2.1
  • Grid3 schema and info providers
  • Development VOMS registration
  • Instructions
  • Same as current Grid3, but
  • pacman get iVDGLg3dev

8
Grid3dev, 2
  • Top level services
  • Dedicated server machine identified at IU
  • GridCat and Monalisa (there are some to-dos for
    each)
  • Ganglia collector (2.5.6)
  • 7 sites have installed the current version, but
    the top level services are not fully configured
  • October 28 milestone
  • site verify working on the 7 sites, reported
    correctly into GridCat

9
Grid3dev next steps and dependencies
  • Need from MIS schedule for schema definition
    GLUE schema with Grid3 extensions?
  • Need from MIS updated VO information providers
    (VO_jobs, VO_io)
  • GRISs will be activated
  • New MDS MIS group to advise
  • Need from security activity schedule for extended
    VOMS capabilities will stick with current until
    then
  • Addition of the first SE
  • Patch upgrade mechanism grid3v2.1 ? grid3dev and
    functionality tests

10
Sites so far
  • UF (CMS) DGT
  • UBuffalo-CCR-dev
  • UC (ATLAS DTG)
  • ANL (ATLAS DTG)
  • IU (ATLAS DTG)
  • OU (ATLAS DTG)
  • UTA (ATLAS DTG)
  • ISI
  • JLAB to join
  • First SE deployment milestone can use existing
    grid3dev site or bring its own
  • Not very representative of OSG.. would like more
    participation from other VOs

11
Summary Schedule
  • Achieve 7 site integration with core level
    grid3dev (Gridcat registered) Oct 28
  • Received plan for SE Oct 28
  • Schema specification with IPs from MIS ??
  • OSG-deployment with VO and OSG-blueprint
    advisement
  • Repaired VO IPs Nov 4
  • Functional ML Nov 4
  • Functional SE Nov 4??
  • Receive plan from DG (via MIS) group on MDS ??
  • Receive plan from DG (via Policy) on VOMS/X ??
  • Launch gLite development testbed on Grid3dev ??
  • Others? Accounting? Discovery service
    (what/when)?

12
Deployment timeline
Write a Comment