Title: Media Area
1Media Area Concrete Floor
2Media Area Concrete Floor
3Embankment Grading
4Phase 2B-R Electrical Work
5Media Area Concrete Floor
6East Admin Area Electrical work and wall framing
7Boiler Room 2nd Boiler has been dismantled
8Well Field Drilling continues
9Science Addition Glue is down to start placing
tile
10Science Addition Floor tile has been placed
11Auditorium On the scaffolding platform
Existing ceiling framing above has since been
removed
12Media area ceiling welding a joint
13Admin Area
14Exterior of West side of Administrative Area
15Geothermal Well Field Drilling Continues
16Geothermal Well Field Drilling Continues
17Media Addition
18Administrative Addition Metal Stud Wall Framing
19Media Addition
20Barricades were built where the front hallway
past the cafeteria meets the mechanical health
addition
21Phase 2B-R
22Phase 2B-R
23Canopy over the rear hallway exit at the media
courtyard
24Media addition as viewed from the courtyard
25Elevator door frame in the mechanical health
addition
26Science Addition East earth science room
27Science Addition Chemistry / Physics Room
28Embankment at roadway towards the middle school
29Glazed Tile work in Phase 2B-R