Title: DOWPAI12062006PHOTOSMAD III MADISONVILLE WEST WWTP HOPKINS COUNTY, KENTUCKY DECEMBER 6TH, 2006 PERFO
1DOWPAI12062006PHOTOSMAD III MADISONVILLE WEST
WWTPHOPKINS COUNTY, KENTUCKYDECEMBER 6TH, 2006
PERFORMANCE AUDIT INSPECTION AI1893 KY0098043
- by L. PEYTON ADAMS
- MADISONVILLE REGIONAL OFFICE
- KENTUCKY DIVISION OF WATER
2MADISONVILLE RAW BUILDING, MARTIN HOUSES, LIME
STORAGE, THE NEW TRACTOR STORAGE BUILDING VIEWED
FROM FINAL EFFLUENT.
3ROTARY SCREENING FOR INFLUENT
4WEST SCREEN RAW
5ARCHIMEDES SCREW TAKING SCREENINGS TO THE DUMPSTER
6RAW ENTERING ROTARY SCREEN
7CAROUSEL OXIDATION DITCH
8EIMCO CARROUSEL DITCH
9DO AND PH MONITORING AT WEIR OVERFLOW LEAVING THE
OXIDATION DITCH TO THE CLARIFIER
10CLARIFIER OVERFLOW SCREEN
11CLARIFIER OVERFLOW
12DRAINED CLARIFER SHOWING SCRAPERS, SKIMMER,
INFLUENT RING, AND CATWALK
13SKIMMER ARM WHERE THE BRUSH TENSION ON THE
AUTOMATIC CLEANING BRUSHES WERE ADJUSTED THIS
YEAR.
14SKIMMER TROUGH ON DRAINED CLARIFIER
15INFLUENT RING LOOKING DOWN IN DRAINED CLARIFIER
16SCUM PIPING LOOKING DOWN FROM INFLUENT RING TO
CLARIFIER.
17DRAINED AREA OF DRAINED CLARIFIER
18SKIMMER ARM FROM CENTER RING
19SLUDGE THICKENER OVERFLOW
20SLUDGE NOTE CLARITY OF THE SURFACE DESPITE THE
COLD
21DRAINED SLUDGE THICKENER
22DRAINED SLUDGE THICKENER
23OVERFLOW WEIR DRAINED SLUDGE THICKENER
24MAINTENANCE SHOP WITH FORKLIFT HOLDING UP UV
LIGHT PANEL
25UV LIGHT PANELS FOR CHANGE OUT OF A BANK OF LIGHTS
26RACK TO HOLD UV BULBS
27GASKETED END OF UV BULB CONNECTIONS ON UV RACK
28UVM 8-64 TROJAN MODEL UV RACK
29NEW BULBS READY FOR INSTALLATION FOR THE RACK
HANGING ON THE FORKLIFT BLADES
30MAINTENANCE STORAGE AREA AND ORGANIZED SPARE PARTS
31LABELED SUPPLY SHELVES
32AERIAL OF PLANT WHEN FIRST CONSTRUCTED LOOKING
DOWN FROM THE EFFLUENT SIDE.
33FILTER PRESS FOR SLUDGE
34FILTER PRESS FOR SLUDGE CONVEYOR TO TRUCK
35CONVEYOR TO TRUCK FOR DISPOSAL AT DONALDSON FARMS
PERMITTED DISPOSAL SITE.
36THE SMALLER PRESS
37POLYMER AND CHEMICAL ADDITION FOR SLUDGE PRESS
38POLYMER SYSTEM NO 2
39CHEMICAL FEED PUMPS
40ACTIVE FILTER PRESS LAST USED BY THE DRUMS OF
GRATING CLEANER
41FRONT OF THE LAST USED FILTER PRESS LOOKING
TOWARD THE TRUCK THAT HAULS TO DONALDSON FARMS
42POLYMER SYSTEM NO 1 WITH PIPING FIXED ON TOP TO
CATCH AND WEIGH JAR TESTING EVALUATION. STUDY
UNDERWAY ON CATONIC POLYMER TO SEE EFFECTIVENESS
UNDER WINTER CONDITIONS
43A BIG IMPROVEMENT HAS BEEN MOVING THE SEPTIC TANK
DUMP STATION TO WHERE THE OPERATORS OPEN,
OBSERVE, TRACK, AND CAN SAMPLE IF NEED BE SEPTIC
TANK HAULERS. IT REPLACED A SYSTEM AT A REMOTE
LIFT STATION WHERE A NOTE WAS LEFT FOR BILLING IN
A BIRD HOUSE HANGING ON THE MAIN 3 LIFT STATION
BY THE MANHOLE USED FOR DUMPING WHERE NO OPERATOR
OBSERVED THE DISCHARGE IN THE PAST.
44NEW LIGHTING SYSTEM ADDED AS AN IMPROVEMENT
45UV BANKS FOR DISINFECTION
46COMPRESSOR BUILDING FOR POST AERATION