Title:

MIUIV BUILDING PROJECT January 2008 August 2008

Description:

The MIUIV Board of Directors approved a 1.4 million dollar ... Lois Roach LGI 1. Kim Zippie LGI 2. GROUP 3 Relocation. July 1, 2008. Robert Barber 102 ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 23
Provided by: celya
Learn more at: http://www.miu4.k12.pa.us
Category:

less

Write a Comment
User Comments (0)
Transcript and Presenter's Notes

Title: MIUIV BUILDING PROJECT January 2008 August 2008


1
MIUIV BUILDING PROJECT January 2008August 2008
  • Cecelia H. Yauger
  • Executive Director
  • February 4, 2008
  • Building Staff Meeting

2
Approval of Project
  • The MIUIV Board of Directors approved a 1.4
    million dollar Renovation Program with the T.A.C
    Energy Solutions at the December 19, 2007
    meeting.
  • The T.A.C. Firm will begin work on site in April
    2008

3
Scope of Work Prior to Project
  • Building Modeling
  • Data Loggers Placed and Data Analyzed
  • TAC Engineer Site Visits
  • Roofing Specialist Site Visits
  • Building Envelope Specialist Site Visit
  • Mid-Term Findings Review with Admin and Board
    Members
  • Contractor Site Visits
  • Audit Finalized and Project Reviewed

4
Review Project
  • Improve Building Infrastructure
  • Update and Improve Building Systems
  • Prepare Building for Future
  • Improve Environmental Quality
  • Indoor Air Quality
  • Lighting Quality
  • Comfortable Space
  • Improve Energy and Operational Efficiency

5
Review Project
  • ECM 1 HVAC System Upgrades and Improvements
  • Current System Issues
  • Nearing end of useful life
  • Contributor of poor Indoor Air Quality (IAQ)
  • Contributor to building comfort problems
  • Inefficient system combined with no ventilation
  • Recommended Solution
  • Redesigned Variable Refrigerant Volume Heat Pump
    System
  • Result Improved building comfort and indoor air
    quality as well as reduced energy and maintenance
    costs

6
Review Project
  • ECM 2 Centralized Digital Control System
  • Current System Issues
  • No central control system
  • Contributor to high energy usage
  • Contributor to building comfort problems
  • Recommended Solution
  • Install central, automatic temperature control
    system integrated with new HVAC systems
  • Result Improved building comfort and indoor air
    quality as well as reduced energy and maintenance
    costs

7
Review Project
  • ECM 3 Lighting System and Ceiling Improvements
  • Current Lighting Issues
  • Poor lighting layout resulting in poor lighting
    quality
  • Outdated and inefficient lighting technology
  • Contributor to high energy usage
  • Does not conform to the current energy code
  • Current Ceiling Issues
  • Inconsistent and difficult to maintain ceilings
  • Occupied spaces without dropped ceiling

8
Review Project
  • ECM 4.2 Air-sealing and Weather-stripping
  • Current Issues
  • Building has numerous points of air-infiltration
  • Contributes to increased energy costs the
    building comfort issues
  • Recommended Solution
  • Air-Seal and weather strip areas such as
    overhangs, soffits, roof edges, duct and pipe
    penetrations, etc
  • Will reduce energy consumption and allow HVAC
    system to operate and maintain space temp
    properly

9
Review Project
  • ECM 4.1 Roofing System Improvements
  • Current Issues
  • Roof has leaks, primarily at the intersection of
    the west additions where there is elevation
    difference
  • Roof is out of warranty but in fair condition
  • Recommended Solution
  • Roof Refurbishment

10
Next Steps
  • Beginning April 14,2008 the work will be
    completed in 3 phases.
  • Relocation of offices will occur on or about the
    following 4 Target dates
  • April 14, 2008
  • May 1, 2008
  • June 1, 2008
  • July 1, 2008

11
General Information
  • Main Entrance for visitors and staff of the
    Building will be Campbell Drive
  • Main Entrance for workers will be Maple Street
  • Temporary Signage will be posted

12
Temporary Signage
13
Training/Meeting RelocationApril 25, 2008-August
31, 2008
  • TO MIU Management Team Staff
  • Special Education Supervisors
  • Frew Mill Administration
  • FROM Cecelia H. Yauger
  • RE Facility Options
  • DATE January 2, 2008
  • The MIU Board of Directors voted to authorize the
    TAC project at the December 19, 2008 board
    meeting.
  • As discussed at the staff meetings in October,
    November, and December, the project will
    temporarily prohibit the use of the training and
    conference rooms in the MIUIU main office
    beginning on April 25, 2008.
  • Most, if not all activities scheduled to be
    hosted at the MIU IV will need to be relocated.

14
May 2008 RelocationNeeds/Plans
  • April 28- Network Mtg- SB
  • Tac Mtg- SB
  • April 29- Sail Mtg- SB
  • April 30- PIL -KZ
  • Parent Toolbox- FC
  • May 1- PIL KZ
  • LTF- FC
  • May 5- Sped Staff- FC
  • Non Public- EN
  • May 7- SAC- CY
  • May 8- MATH 3- SB
  • LTF- FC
  • May 12- PSERS- JS
  • May 13- Math Core- SB
  • Sail Core- SB
  • May 14- Emotional Support- SB
  • Interviews HR
  • May 15- Pupil Transpiration Cord. JS
  • May 16- Sped Contact Meeting FC

15
June 2008 Relocation Needs/Plans
  • June 5- LICC- AL
  • EI Core- AL
  • June 10- PSERS- JS
  • June 11- Emotional Support- SB
  • June 17- PANA- JM
  • June 18- PIL KZ
  • June 19- PIL KZ
  • June 24- PIL- KZ
  • Arts/Humanities- VM
  • June 25- PIL- KZ
  • June 26- Staff/Board- CY

16
July 2008 Relocation Needs/Plans
  • No meetings scheduled at this time.

17
August 2008 Relocation Needs/Plans
  • August 13- Staff/Board- CY
  • August 19-
  • Best Practices/GCHS
  • August 20-23 Sped In-service-FC

18
Group 1 RelocationApril 14, 2008
  • Charles Dumbaugh-IMS
  • Brian Grossman-IMS
  • Rick Magargee -IMS
  • Josh Thompson- IMS

19
Group 1 Relocation May 1, 2008
  • Olivia Allison-Exterovich CCIS
  • Teresa Beatty CCIS
  • Jim Bennett Conference Room A/B
  • Susan Black LGI 2
  • PJ Burchfield CCIS
  • Terri Clark LGI 2
  • Sally Conley Lobby of LGI
  • Judy Dennis LGI 2
  • Fingerprint Station Alcove of LGI
  • Veronica Gardner LGI 1
  • Robert Ghering Conference Room A/B
  • Beth Glew Franklin
  • Dave Hofing Conference Room A/B
  • Linda Howard 147
  • Cheryl Karns LGI 1
  • Marilyn Kay LGI 1
  • John Kassi LGI 2
  • Jacque Kendall 172
  • Maggie Kishbaugh LGI 1

20
GROUP 2 RelocationJune 1, 2008
  • Nick Bernard - Calendar Completed
  • Nancy Breese LGI 1
  • Paula Bredl Calendar Completed
  • Judy Campagna - Calendar Completed
  • Denise Ferguson LGI 2
  • Rhett Fertig - Calendar Completed
  • Carrie Fusco LGI 1
  • Karen Gaggiano LGI 1
  • Dan Gomola LGI 2
  • Marilyn Goodrich - Calendar Completed
  • Karen Griffiths LGI 1
  • Lorinda Hess LGI 2
  • Marilyn Hillard LGI 1
  • Tina Keller- Calendar Completed
  • Liz Kingsley 119
  • Wendy Kinnear LGI 2
  • Ruth Klingensmith LGI 1
  • Pat Kriley LGI 2
  • Jane Martin LGI 2

21
GROUP 3 Relocation July 1, 2008
  • Robert Barber 102
  • Dawn Book Computer Lab
  • Frank Cloud 103
  • Ken Davis Computer Lab
  • Kathy Fox 101
  • April Kisamore Computer Lab
  • Shelly Kyko Computer Lab
  • Sandra Masson 102
  • Crystal McFeely 103
  • Kathleen Molsky Computer Lab
  • Candi Surrena Computer Lab
  • Janine Welton Computer Lab
  • Laura Urbach 100A
  • Cecelia Yauger 100A

22
Questions
  • REMEMBER.THE FUTURE IS NOW!!!!!
  • MINOR INCONVENIENCE..
  • MAJOR IMPROVEMENT!!!!
  • POWERPOINT WILL BE AVAILABLE ON THE WEBSITE AND
    ELECTRONICALY PER REQUEST
  • THANK YOUQUESTIONS???
  • HAVE A GREAT DAY!!!!
About PowerShow.com