Capability Bubbles The Vocabulary of the Architecture - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Capability Bubbles The Vocabulary of the Architecture

Description:

Project. Segment. PROGRAMMATIC. TECHNICAL. PEOPLE. Description ... STARS. Improved. CDM for. Maintenance. Activities. aFAST with. Wake Vortex. Low Altitude ... – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 17
Provided by: TRW6
Category:

less

Transcript and Presenter's Notes

Title: Capability Bubbles The Vocabulary of the Architecture


1
Capability Bubbles - The Vocabulary of the
Architecture
  • Steve Bradford
  • Manager, Concept Development
  • Architecture and System Engineering
  • Federal Aviation Administration
  • May 11, 1999

2
Evolution of Capability Implementation
Traffic Synchronization -- En Route
Conflict Resolution with Multi-Center Metering
Conflict Probe (National)
Conflict Probe (FFP1)
Controller
Future
Today
3
Programs Buy Mechanisms
Programs
...that are Reported to Congress, are composed
of...
Projects
...that are managed by FAA organizations, that
are composed of...
Segments
that buy specific...
People
Systems
Support Activities
that are implemented into the...
4
Typical FAA System Delivery Schedule
R,ED
JRC 2
JRC 1
FE
Development
Ops
Test
Deploy
5
Potential Misconceptions
  • System delivery provides
  • Desired Service(s)
  • Desired Benefit(s)
  • FE Programs fund all activities necessary for
  • Desired Service(s)
  • Desired Benefit(s)
  • FAA Program schedules imply
  • All interdependencies will be satisfied to
    deliver
  • Desired Service(s)
  • Desired Benefit(s)
  • Desired Service Desired Benefit

Result is... No clear understanding of the Risk
associated with the actual delivery of Services
or Benefits
6
Delivering Services
The NAS...
is composed of interactive...
...that deliver...
Capabilities
that are combined into...
Services
that are requested by the Aviation Community
7
NAS Services
NAS
NAS Services
Service Groups
Air Traffic Services
Airport Mgmt Services
Security Services
Safety Services
Certification Services
  • Flight Planning
  • ATC-Separation Assurance
  • ATC-Advisory
  • TM-Synchronization
  • TM-Strategic Flow
  • Emergency and Alerting
  • Navigation
  • Airspace Management
  • Infrastructure / Information Management
  • Aircraft Ground Ops
  • Aircraft Support
  • Airport Ops
  • Passenger Support
  • Operations
  • Facilities
  • Aircraft Certification
  • Flight Standards
  • Rulemaking
  • Accident Investigation
  • Aviation Medicine
  • Facilities
  • Communications
  • Passengers

Services
Enterprise Management Services
  • System Acquisition
  • Regional Administration
  • Depot
  • Training

8
Air Traffic Services
Air Traffic Services 1
Service Group
Services
Flight Planning
ATC-Separation Assurance
TM-Strategic Flow
Airspace Management
ATC-Advisory
TM-Synchronization
Navigation
Infrastructure /Information Management
101
102
103
104
105
107
108
109
  • Flight Plan Support
  • Flight Plan Processing
  • Aircraft - Aircraft
  • Aircraft - Terrain / Obstacles
  • Aircraft - Airspace
  • Surface Separation
  • Long-Term Planning
  • Flight Day Management
  • Performance Assessment
  • Airborne
  • Surface
  • Weather Advisories
  • Traffic Advisories
  • NAS Status Advisories
  • Monitoring Maintenance
  • Spectrum Management
  • Government / Agency Support
  • Airspace Design
  • Airspace for Special Use
  • Airborne Guidance
  • Surface Guidance

Emergency Alerting
106
  • Emergency Assistance
  • Alerting Support

Capabilities
9
CONOPs to Architecture
Time
Step 1
Step 2
Step n
Capability Template
10
Capability Template - Shared Separation
Responsibility Example
Shared Separation Responsibility
  • Narrative
  • Assumptions
  • Type of Airspace
  • Phase of Flight
  • RTSP
  • Benefits
  • Mechanisms
  • Capatilities would be described by
  • Facing Page that describes the concept element
  • Element Diagram that identifies the mechanisms
    and their interfaces

Shared Separation Responsibility Diagram
C
P
F
T
11
Capability Diagram Mechanism Summary
People
  • Controller
  • Traffic Manager
  • Flight Specialist
  • Dispatcher
  • Pilot
  • Airport Ops
  • Weather Specialist
  • Technician

Support Activities Systems
Systems
Facility / Node
  • Air Traffic Control
  • Aircraft
  • Surface Vehicle
  • Airport
  • Commercial Service Provider
  • Operations Center
  • Commercial
  • Military
  • International
  • Infrastructure Management
  • National Weather Service
  • Government

Key Node
12
Interdependencies are captured by drawing
Capability Diagrams
Conflict Probe (FFP1)
(1087108)
(1084064)
09131
13
Segment - Mechanism Data
PROGRAMMATIC
TECHNICAL
Service
Program
Capability
Project
Mechanism
Segment
Segment Data
Mechanism Data
  • SYSTEMS
  • Description
  • Schedule
  • Start Mission Analysis
  • JRC (1 and 2)
  • Initial Operational Capability(1st site IOC)
  • Final Operational Capability(Last site IOC)
  • Begin
  • Decommissioning
  • End Of Service Life
  • Quantity
  • Location (not there yet)
  • Description
  • Dollar Type(s) by organization
  • R,ED
  • FE
  • Ops
  • Schedule by Dollar Type
  • Start
  • Finish
  • Responsible Organization
  • Basis of Estimate
  • PEOPLE
  • Description
  • Schedule(if required)
  • Quantity
  • SUPPORT ACTIVITY
  • Airspace Design
  • Adaptation
  • Certification
  • Procedure
  • Development
  • Training
  • Flight Check
  • Support Services
  • Description
  • Schedule
  • Start
  • Finish
  • Location
  • (not there yet)

The building blocks of the NAS Architecture Data
Base are UNIQUE Segment-Mechanism pairs
14
An Implementation with Support Activity Schedule
Assumptions
2 months
MOPS, SARPS, Intl Coord
Pilot Training
36 months
First Use
Initial Avionics Development
18 months
12 months
Avionics Certification
18-24 months
1-3 months
Airspace Design
1-3 months
36-60 months
Last Site /Full Use is typically 12 months after
last site IOC
Flight Check
Rule Making
36-60 months
6 months
ATC Procedure Development
2 months
12-24 months
12 months
First Site /First Use
6 months
1 month
ATC Training
Typical Key Date -- Can vary along the System
Deployment Line OR the Procedure Development
Line -- all dates referenced from Key date
Start Deployment
System
First Site IOC
Last Site IOC
15
NAS Architecture Capability Implementation
Transitions by Service Areas
98
99
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
Existing
Expanded
TDLS
TDLS
Automatic
Simultaneous
Hazardous
Weather
Enhanced
Notification
MDCRS
MDCRS
Initial FIS
ADS-B Gap-
Air-Air ADS-B
Filler
Initial WAAS
Cruise
Improved En
Integrated
TIS via Mode-S
Route
En Route
Surveillance
Surveillance
(Asterix/SI)
with ADS-B
Initial WAAS
Improved
Precision
Terminal
Approach
Surveillance
Existing
Integrated
(Asterix/SI)
Airports
Terminal
Surveillance
with ADS-B
Enhanced En
Route Radar
Coverage
Low Altitude
Initial WAAS
Terrain
Direct Routes
GPS Oceanic
Precision
Avoidance
- Expanded
Approach
Surveillance
New
Coverage
Qualifying
Airports
CPDLC Build
Low Altitude
3 via VDL-
Direct Routes
Mode 3
- Using WAAS
Low Altitude
Direct Routes
Interactive
Expanded
Weather on
Airborne
Radar
DSR
Refile
Coverage
CPDLC Build
CPDLC Build
CPDLC Build
CPDLC Build 1
2 via VDL-
2 via VDL-
1A
Enhanced
Mode 2
Mode 3
SMS
Initial SMA
Atlanta SMA
SMA
SMS
(FFP1)
Improved
Increased
CDM for
NAS-Wide
CDM for
RMM
Maintenance
ELT for SAR
Information
Maintenance
Activity
Sharing
Activities
Flight Plan
Evaluation
Initial CDM
AOC Net
(FFP1)
LAAS Cat I
ASDE with
ASDE
AMASS
LAAS Cat II/III
Full CDM
Expanded
Initial TWIP
TWIP
Integrated
Tower Area
Runway
Surveillance
Incursion
Reduction
pFAST (FFP1)
Multi-Center
aFAST with
Metering with
Descent
Wake Vortex
Advisor
Single Center
Metering
(FFP1)
ITWS Stand-
Conflict
alone
Resolution
URET CCLD
Conflict
with Multi-
(FFP1)
Probe
Center
Metering
Terminal
Improved
Weather
Weather on
Flight Planning
Emergency Alerting
Exchange
STARS
Separation
Navigation
RVSM/50
50/50
Lateral
Advisories
Airspace Management
Traffic Synchronization
Infrastructure
Oceanic
Multi-Sector
Oceanic Data
Strategic Flow Management
Airport Management
Oceanic Data
Surveillance
Link
Link
via ADS-A
16
En Route Transition
CY
03
04
05
06
07
08
09
10
11
12
13
14
15
02
01
00
99
98
Phase 2
Phase 3
Phase 1
Step 1
Step 2
Step 3
Step 4
Workstations
DSR
DSR, DSR Tech Refresh,
ARTCC WS
DCCR,
Upgrades
Mods
to Support FFP1
CDC, PVD
En Route Backup
DARC
(DARC-R)
Host (HOCSR) (Initial
Processors
Enhanced
Host
Reengineering
En Route/Oceanic System
Technical Refresh)
(includes full-service redundancy
Re-engineer
En Route
and ATC DSS)
En Route
PAMRI
Communications
Gateway
URET
URET
CP
Prototype
FFP1
(FSD)
Applications
CTAS/TMA
TMA MC
Prototype
TMA SC
(FSD)
FFP1
Network
Common En Route Infrastructure
HID/NAS LAN
Local
Standards
External
Standards and Protocol Definition
Info
NAS Queries
Interfaces
Services
Legend ARTCC - Air Route Traffic Control
Center ATC - Air Traffic Control CP - Conflict
Probe CDC - Center Display Console CTAS/TMA -
Center TRACON Automation System/Traffic
Management Advisor DARC- Direct Access Radar
Channel DCCR - Display Channel Complex Replacement
DSS - Decision Support System FFP1 - Free flight
Phase 1 FSD - Full Scale Development HID/NAS LAN
- Host Interface Device NAS Local Area
Network PAMRI - Peripheral Adapter Module
Replacement Item PVD - Plan View Display URET -
User Request Evaluation Tool W/S - Work Station
Write a Comment
User Comments (0)
About PowerShow.com