Value Now: Off-the-Shelf Operational Visibility in ProcessBook and RtPortal - PowerPoint PPT Presentation

1 / 26
About This Presentation
Title:

Value Now: Off-the-Shelf Operational Visibility in ProcessBook and RtPortal

Description:

GrITS for ProcessBook Enhanced Operational Visibility. Graphics Import Tool Set. ... GrITS for ProcessBook. To this... Data South Systems. Questions? ... – PowerPoint PPT presentation

Number of Views:63
Avg rating:3.0/5.0
Slides: 27
Provided by: Aar768
Category:

less

Transcript and Presenter's Notes

Title: Value Now: Off-the-Shelf Operational Visibility in ProcessBook and RtPortal


1
Value Now Off-the-Shelf Operational Visibility
in ProcessBook and RtPortal Data South Systems
and Dominion Power
2
ProcessBook The Portal to Data
  • ProcessBook can deliver the out of the box data
    ability to monitor the plant.
  • Quickly build ad hoc trends to view real time or
    historical data.
  • Supercharged graphics to mimic DCS.
  • Monitor plant outside control room.
  • Builds collaboration among users when viewing
    data.
  • Easy to use.

3
ProcessBook - More Eyes On the Data
  • Easy integration with MSOffice applications.
  • Build process displays with navigation links to
    other displays.
  • Completely web parts enabled.
  • PI drives all data access.

4
Dominion Power
5
Dominion - OSIsoft Footprint
  • 23 PI installations in FH
  • OSIsoft PI in use since 1997
  • Thick client tools - ProcessBook Datalink
  • Original graphics created by a third party
    integrator.
  • Recent centralized installation of 4 locations

6
Key Decision Drivers
  • NERC Cyber Security
  • Industry effort
  • CIP 005 Electronic Security Perimeter
  • CIP 006 Physical Security Perimeter
  • Operational visibility
  • Graphics are one key to operational visibility
  • Copy graphics from similar units not
    necessarily cookie cutter.

7
Evaluation Steps forward
  • Evaluation of several options for ProcessBook
    graphics.
  • Draw by hand.
  • Automated tool
  • Proof of Concept and Pilot
  • Easy conversion of control system graphics
  • Potential to require additional tags
  • OPC compatibility
  • RtPortal and Future plans - compatibility

8
Value Now
  • Remove NERC Cyber Security critical assets from
    the list.
  • One less DCS connected system, One less system to
    remediate, maintain, report on.
  • Remove potential for fines or negative publicity.
  • Place DCS graphics in front of your operations
    support team.
  • Return on investment from fast deployment to end
    user.
  • Exact version of DCS graphics in PI.

9
TECO Polk Power Station
  • Located near Tampa Florida, the Polk power
    station is a state-of-the-art integrated coal
    gasification combined-cycle power plant (clean
    coal technology)
  • Produces enough electricity to serve 75,000
    homes.
  • Long time PI user (state how long)

10
TECO Polk Power Station
  • Site demanded greater operational visibility.
  • Faced with opportunity to leverage existing PI
    investment, or purchase additional DCS equipment.
    (expensive)
  • The purchase of DCS equipment is a costly
    investment, and limits use and scalability.
  • DCS equipment equals more problems and increased
    risk (CIP)
  • Quicker ROI and flexibility led customer to PI.
  • Faster deployment.
  • Greater visibility of plant.

11
DTE Energy Fleet Optimization
12
DTE Energy Fleet Optimization
  • Michigans largest electric utility with 2.2
    million customers
  • Over 11,080 MW of power generation, primarily
    coal fired
  • 54,000 GWh in electric sales
  • 4.7 billion in revenue

13
DTE Energy Fleet Optimization
  • Central location to monitor operation of power
    generation fleet (remote)
  • Staffed 24 X 7 by highly experienced operators
  • Maintain Constant communication with control
    rooms
  • Troubleshoot, analyze, diagnose, and operational
    advice
  • Operator display mimics in ProcessBook using PI
    data (Bailey OIS, PMAX)
  • Other software apps (alarm management, equipment
    monitoring, etc.)

14
DTE Energy DCS Operator Displays
  • 6000 real time dynamic actively linked WEB DCS
    graphics
  • Replay events using historical PI data

15
DTE Energy PI Enabled Dashboards
  • 2000 real time dynamic actively linked WEB System
    graphics

16
NASA Glenn Research Center
17
NASA Uses for PI
  • All 12,000 Pts archived (console database)
  • 3 Yr. of Data Available on Line
  • Diagnostics, Operator Process Screen Playback
  • Analysis
  • Defense of Control System
  • Machine Run Time/Start Log
  • Predictive Maintenance

18
NASA Uses for PI - Diagnostics
  • Business model requires engineers to completely
    retool plant, screens, etc frequently.
  • End users frequently need to review archived DCS
    screens.
  • Site utilizes PI Archive Playback of Process
    Graphic.
  • Originally used a bit map image of the operator
    console graphic.
  • Dynamic symbols had to be built and updated by
    hand.
  • Tags were mapped by hand.
  • Time consuming.
  • Graphics were frequently out of synch with DCS.

19
NASA Operational Visibility
  • Constantly changing DCS graphics.
  • Large number of users.
  • Graphics must be accurate and up to date.
  • Site needed an automated solution to enhance the
    value of PI.

20
MeadWestvaco Mahrt Mill
  • PI data is used for site monitoring, research,
    and troubleshooting.
  • Site has 7 DCSs, therefore creating a large tag
    database.
  • Users rely heavily on PI for decision making.
  • Many users do not know tag names, (50,000 PI
    tags) making searching for tags difficult.
  • Customer identified a need for finding data
    quicker in PI.

21
MeadWestvaco Mahrt Mill
  • ProcessBook graphics screens give users familiar
    look and feel of the DCS, therefore encouraging
    more PI usage.
  • Building graphics screens in ProcessBook bridged
    the gap between DCS and PI systems.
  • Users can view trends based on display images,
    not tag names.
  • Graphics create a standard way to look at plant
    information.

22
ProcessBook Graphics building
  • The common theme is graphics enhance operational
    visibility.
  • Installing additional DCS equipment is an
    expensive option.
  • Using ProcessBook to view graphics offers more
    flexibility and leverages your PI investment.
  • Drawing graphics by hand is time consuming
    (approximately 8 hours per screen)
  • Tags in DCS are frequently named different than
    PI tags.

23
GrITS for ProcessBook Enhanced Operational
Visibility
  • Graphics Import Tool Set.
  • Converts DCS Graphics into ProcessBook and
    RTPortal Displays.
  • Creates a window into the control room without
    leaving your desk.
  • Matches DCS tags to PI Tags.
  • Providing More Eyes on the Data.

24
GrITS for ProcessBook
In just a few seconds, go from this
25
GrITS for ProcessBook
To this
26
Data South Systems
  • Questions??
Write a Comment
User Comments (0)
About PowerShow.com