Description:

Lost Time Work Injury - contractor employee fractured right femur ... Health Center (Ft. McMurray); airlifted to Royal Alexandra Hospital (Edmonton) ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 5
Provided by: NC79
Category:

less

Transcript and Presenter's Notes

Title: Syncrude Emissions Reduction SER Project


1

Syncrude Emissions Reduction (SER) Project TIC
Canada Ltd. Aerial Work Platform
Incident March 28, 2008
Oz MachadoManager, Syncrude Joint InterestMay
13, 2008
2
  • General
  • Lost Time Work Injury - contractor employee
    fractured right femur
  • Prime Contractor - Syncrude Canada Ltd.
    Contractor - TIC Canada 2002 ULC
  • Description
  • Incident occurred on March 28, 2008 at 835 AM
    Mildred Lake Plant Site
  • Ironworker, along with spotter, repositioned
    aerial work platform (AWP) in congested area
    adjacent to structural steel AWP basket jams
    against concrete pillar
  • Ironworker unhooks fall protection lanyard to
    exit AWP basket suddenly releases from jammed
    position person thrown out of basket, strikes
    overhead steel beam, falls to grade
  • Treatment
  • Emergency Response provided on-site medical
    attention
  • Transported to Northern Lights Regional Health
    Center (Ft. McMurray) airlifted to Royal
    Alexandra Hospital (Edmonton) due to injury
    severity
  • Underwent surgery to install pins to repair
    uneven femur break
  • Direct Causes
  • Operator / spotter failed to perform area hazard
    assessment
  • Operator failed to conduct equipment walk-around
    (standard procedure)
  • Operator not able to see that the boom was stuck
    due to a blind spot
  • Spotter was at opposite end of AWP and did not
    see how tight the area was
  • Management process breakdown on job hazard
    assessment (JHA) quality and oversight of safety
    processes
  • Immediate Corrective Actions
  • Updated requirements for operating AWPs in
    congested areas two spotters required when
    operating in areas with clearance lt 10 ft.
  • Reviewed contractors SHE requirements for AWPs
    and JHA expectations
  • Increased monthly senior management site tours /
    audits to focus on AWP work to ensure procedures
    are being followed
  • Systemic Causes
  • Quality of contractors JHA process and hazard
    recognition
  • Operators competency to operate equipment
  • Systematic Corrective Actions
  • Implement audit process of JHA development
  • Verify operators competency prior to operating
    equipment and use of JHA tools


3
Concrete Residue on AWP Knuckle
Work Area
Damaged Concrete Pillar (southwest side)
Location of AWP with Concrete
4
Location of the JLG at the time of the incident.
The Stairs were placed at the basket later.
Highlighted is the column.
Write a Comment