Darrin D. Dillah, PhD, PE. S C S E N G I N E E R S. Outline. Introduction ... Technologies for utilizing LFG. Conventional: boiler, electricity generation, ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 17
Provided by: darrin5
Category:

less

Transcript and Presenter's Notes

Title: Heating Landfill Facilities Using Infrared Heaters Part 2 and Project 2


1
Heating Landfill Facilities Using Infrared
Heaters Part 2 and Project 2
  • Darrin D. Dillah, PhD, PE

S C S E N G I N E E R S
2
Outline
  • Introduction
  • Frederick and Fairfax case studies
  • Feasibility study
  • Design
  • Construction and operation
  • Summary

3
Introduction
  • Technologies for utilizing LFG
  • Conventional boiler, electricity generation,
    pipeline upgrades
  • Emerging technologies
  • Vehicle fuel, micro turbine, fuel cells,
    greenhouses...
  • Infrared radiant tube heaters - 1st in US

4
Principle of Operation
  • Infrared radiant tube heaters
  • Same principle as the sun
  • Heats the floor and objects

5
Frederick Profile
  • Permit 529 opened 1993, closure 2030
  • 170-acre facility 90 acres for landfilling
  • 1.5 million tons of waste
  • 550 tpd
  • 6-acre portion capped in 1999
  • 500 cfm

6
Frederick County Landfill, VA
SCALE HOUSE
N
MAINTENANCE SHOPS
0
1000
2000
APPROXIMATE SCALE
7
I-95 Profile
  • Closed
  • 260 acres landfilled
  • 22 million tons of waste
  • 130-acre portion capped
  • 300 collection devices

8
I-95 Landfill
SCALE HOUSE
Waste Footprint
MAINTENANCE SHOP
I-95
Occoquan
MAINTENANCE SHOPS
9
Feasibility Study
  • Analyzed various alternatives
  • 12K-15K/yr. propane cost
  • Recommended
  • New infrared heaters
  • Parallel with existing system
  • Payback between 5 and 10 years

10
LFG Service Line - Frederick
11
Maintenance Building - Frederick
12
Storage Building - Frederick
13
Maintenance Building I-95
14
Design/Construction/Operation
  • Frederick, lt 30 cfm
  • I-95, lt 15 cfm
  • Stainless steel above-grade, HDPE below grade
  • Standards heaters - modified for LFG
  • Simple controls
  • Ordinary mechanical contractor
  • Construction time - 3 months, 2/01 to 5/01
  • Simple to operate
  • Minimal maintenance expected

15
Startup/Operation
  • Frederick Startup in late 2001
  • Operated for a few weeks
  • Problem with sensor fouling
  • Fixed by filtering out siloxane
  • Carbon-filled drums
  • Operational since December 2002

16
Summary
  • First LFG infrared heater projects in the US
  • Reasonable payback
  • Less than 30 cfm LFG needed to heat about 6,500
    sf
  • Minimal gas treatment
  • Low sophistication - simple to operate