Outline
  • Proposed Checkpoint Goals
  • Current Accomplishments
  • Difficulties
  • Next Steps

3
Proposed Checkpoint Goals
  • Develop a simulator using SESC with MINT
  • 4-8 weeks
  • Create various workloads for the simulated
    architecture
  • 1-2 weeks

4
Accomplishments
  • Heterogeneous Cores up and running.
  • Network latency modeling on its way.
  • Still in the process of developing a simulator
    using SESC with MINT

5
Difficulties
  • Lack of up to date simulator documentation.
  • Network communication latency modeler functional
    but disconnected in simulator.

6
Next Steps
  • Tie the network latency modeler into the
    simulator.
  • Create various workloads for the simulated
    architecture
  • 1-2 weeks
  • Analyze performance to determine how different
    resource allocations can be applied.
  • 8 weeks