MC production plans : 1/08/2000 - 31/03/2001 - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

MC production plans : 1/08/2000 - 31/03/2001

Description:

new version SICBMC and SICBDST - August 2000. detailed geometry, x-talk, timing, ... Test Data 50k - 100k events RAWH and DST1 (mostly mbias and B X) ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 6
Provided by: ericv156
Category:

less

Transcript and Presenter's Notes

Title: MC production plans : 1/08/2000 - 31/03/2001


1
MC production plans 1/08/2000 - 31/03/2001
  • Agnieszka Jacholkowska

2
TDRs (1)
  • End July 2000
  • CALOs
  • 280k events on RAWH, DST1
  • RICH
  • 230k events on RAWH, DST1
  • Muons (TDR end 2000)
  • new version SICBMC and SICBDST - August 2000
  • detailed geometry, x-talk, timing, ...
  • ? Test Data 50k - 100k events RAWH and DST1
  • (mostly mbias and B ? ? X)
  • final production - October 2000
  • 50k - 100k events RAWH and DST2
  • (mbias, B ? ? X, B ? J/?(? ? ) K0s )

3
TDRs (2)
  • Trigger (TDR 2002)
  • L0
  • CALOs
  • no production foreseen with present software (no
    noise,)
  • Muons
  • comprised in the Muon TDR sample
  • L1 - Autumn 2000
  • request from F. Fiedler (April 2000), for CERN
    and Lyon,
  • 500k events with DST2 output - channels and mbias
  • Comments on latest calculations on trigger
    samples
  • (O. Schneider)
  • obviously for later period
  • calculations driven by 0.1 bandwidth for
    photons (?)
  • before we have to clarify running conditions
    for
  • luminosity and trigger thresholds
  • ? discussion needed - Milano meeting ?

4
TDRs (3)
  • Tracking (TDR outer tracker - March 2001)
  • new SICBMC (tracking part)
  • will need 60k events in RAWH and DST format
  • reconstructed by BRUNEL,
  • (see BRUNEL meeting)
  • n x specialized samples of 1000 events
  • before end 2000
  • Vertex Detector (TDR - April 2001)

5
Physics
  • Channels
  • all channels in TP and SM Workshop will be
  • provided on request from analysers ,
  • many already exist in RICH TDR sample
  • b inclusive background
  • 500k events (RAWH format) from RAL, reconstructed
  • at CERN ?
  • production of 1 - 2 M events after L0/L1 triggers
  • in MiniDST format at Liverpool farm
  • is under discussion
Write a Comment
User Comments (0)
About PowerShow.com