Title: Bioreactor Landfill Project Update


1
Bioreactor Landfill Project Update
  • FCSHWM Advisory Board Meeting
  • December 10, 1999
  • Debra ReinhartTim Townsend

2
Progress Since Last Advisory Board Meeting
  • Permit Application Progress
  • Operations Plan
  • Baseline Monitoring
  • Installation of Leach Field
  • Sensor Fabrication and Testing
  • Additional Bioreactor Site Investigation

3
Permit Application Progress
  • DEP has issued a second RAI.
  • Project team members met with the NE District DEP
    permit engineers to discuss issues.
  • Responses to second RAI scheduled to be submitted
    on December 10, 1999.

4
Operations Plan
  • Submittal of a detailed operations plan was a
    part of RAI 2.
  • Operations plan designed to be an evolving
    document, but a basic game plan was established.

5
Operations Plan
  • Define project participant roles and
    responsibilities.
  • Define method of communication and decision
    making.
  • Define reporting requirements to DEP district.
  • Define basic health and safety criteria.

6
Operations Plan
  • Define contingencies and responsive actions.
  • Outline site inspection and maintenance
    requirements.
  • Define monitoring controls for the issues of
    landfill fires, explosive conditions, and
    leachate flow.

7
Control Diagram
8
Operations Plan
  • Outlines a series of research phases.
  • Construction monitoring.
  • Baseline monitoring.
  • Startup monitoring.
  • Construction monitoring.

9
Cap Issues Paper
  • A number of parties have raised concerns about
    the cap. An issues paper was prepared to
    address why the cap system was desired and to
    describe how the researchers believe the concerns
    are addressed.

10
Issue 1
  • Ballooning of the Cap

11
Issue 2
  • Internal Landfill Temperatures

12
Issue 3 - Explosive Conditions
13
Update on Monitoring
  • Leachate
  • Gas
  • Waste
  • Settlement
  • Head on the Liner Measurements

14
Leachate
  • Almost a years worth of background leachate data
    has been collected.
  • Conventional water quality parameters
  • Organic trace compounds
  • Heavy metals

15
Gas
  • Instrumentation has been set up for
  • Fixed gases (CH4, CO2, N2, O2)
  • Trace organic compounds
  • Sulfur gases
  • N2O

16
Waste
  • The bioprocess lab is nearing completion.
  • Processing waste.
  • BMP analysis.
  • Cellulose, lignin analysis.

17
Settlement
  • The GPS system is in. Students have undergone
    training.
  • Training near completion.

18
Head on the Liner Measurements
LCS Surface
Drainage Layer
Geomembrane
Geofabric
Pressure Transducer
19
Transducer Layout
Pressure Transducers
Geomembrane
LCS
20
(No Transcript)
21
(No Transcript)
22
(No Transcript)
23
Installation of Leach Field
  • A leachate field has been installed in the
    Southern corner of Cell 2 to supply known
    quantities of liquid to the area over the
    pressure transducers.

24
Cross Section of Leach Field
25
Aerial View of Leach Field
26
Future Instrumentation
  • Temperature Sensors
  • Moisture Sensors

27
Site Visit to Volusia County
28
(No Transcript)
29
Questions?