Transcript and Presenter's Notes

Title: In collaboration with


1
Development of integrated project and financial
management tools in conformity with the 2003
FPA
Narrative Reports The single form
In collaboration with
2
the Single Form
  • A single form to ALWAYS use for
  • Project proposals (any type)
  • Interim Narrative Report
  • Pre final Narrative Report
  • Final Narrative Report

3
the Single Form
  • Preparation of the Single Form requires knowledge
    of the ECHO PCM manual
  • The following must be enclosed
  • Logframe
  • Workflow
  • Map of the area
  • Other documents should be enclosed as required by
    the situation (e.g. ToR evaluation, audit,
    visibility plan)

4
the Single Form

Complexity of the project
Evaluability of the project
5
SF proposal
  • The SF is composed of 13 sections
  • All sections are completely filled in to
    convince of the importance of proposed
    operation
  • Less detail is required for operations of primary
    emergency and emergency

Elements of interest
6
SF proposal

The following points shall always be respected
7
SF Sections
  • 1. General information
  • SummaryThis section contains the main elements
    of the proposal. The humanitarian organisation
    must copy the contents of the sections of the
    proposal listed below 1.7.

Elements of interest
8
SF Sections
  • 2. Need Assessment
  • A precise stakeholders analysis is required
  • If an assessment exists it shall be enclosed (at
    least a summary)
  • Problem tree should be used as an instrument to
    analyze and synthesize problems

Elements of interest
9
Problem Tree
10
SF Sections
  • 3. HO Strategy
  • The presence of the HO in the country/area is
    explained specifying
  • Location, sectors, donors
  • Lessons learnt
  • Chosen strategy is discussed
  • Proposals shall always be discussed with regional
    ECHO representatives
  • NEW!The system to be applied by the partner for
    the identification of costs and charging to the
    different projects has to be outlined in 3.1.

Elements of interest
11
SF Sections
  • 4. Operational Framework
  • In general
  • Logical Framework mandatory (max
    3 pages)
  • Title of operation must not exceed 120 characters
    (NEW! should avoid inclusion of specific data
    that could change, such as the number of
    beneficiaries, sub-region of implementation,
    etc..)
  • Requirements inserted in SF must be scrupulously
    respected

Elements of interest
12
SF Sections
  • 4. Operational Framework
  • In Particular
  • Precise details are required for the
    beneficiaries (number, type, category, location)
  • Identification criteria are clearly defined
  • Activities are sub-divided into sectors (budget,
    categories)

Elements of interest
13
SF Sections
  • Continuing with sez. 4 the objectives
  • General objective (called principle objective
    here) shall be in line with the objectives
    specified by the EC decision
  • Insert only 1 specific objective (also in line
    with the EC decision)
  • Centrality of indicators (details for all
    expected results) and monitoring mechanism

Elements of interest
14
Log Frame
Refer to the EC strategic framework and ECHO
decision
Refer to the EC decision Cannot be modified
Consider costs and organization of a monitoring
plan
Refer to the budget lines
15
Narrative IOV Sources of Verification Risks and assumptions
General objectives 1. 2. 3.
Specific objective 1.
Expected results 1.1. 1.2.
Activity 1.1.1. 1.1.2. 1.2.1.
16
Narrative IOV Sources of Verification Risks and assumption
General objectives Contribute to improve health conditions of refugees and local inhabitants Improvement of the main health indicators statistic information collected by WHO
Specific objectives Level of water connected disease in 8.000 refugees and 20.000 local inhabitants reduced to pre-war levels decrease in water-connected disease by 20 within 6 months Survey Interim evaluation. Final evaluation
Expected results 1. Within 6 months 8.000 refugees will have adeguate, appropriate and safe hygienic services women may safely use hygienic service 400 latrines appropriately constructed/used minimum distance of 50 meters between household and latrines latrine monitoring record Focus Group women
Activity 1.1.1. Consultation with women to identify suitable sites for hygienic services 1.1.2. Construction of 400 gender-segregated latrines conforming to international standards 1.1.3. Training and equipping 40 people responsible for latrines 1.1.1. Consultation with women to identify suitable sites for hygienic services 1.1.2. Construction of 400 gender-segregated latrines conforming to international standards 1.1.3. Training and equipping 40 people responsible for latrines 1.1.1. Consultation with women to identify suitable sites for hygienic services 1.1.2. Construction of 400 gender-segregated latrines conforming to international standards 1.1.3. Training and equipping 40 people responsible for latrines
17
SF Sections
  • 5. Risks Assumptions
  • External factors are explained and monitored (the
    partner should explain how they would react to
    mitigate their effects on the implementation of
    the operation and what other options would be
    envisaged to achieve results)
  • The field safety situation is outlined and, if
    they exist, specific protocols for the operative
    context in question

Elements of interest
18
SF Sections
  • 6. Resources Required
  • Local and expatriate staff are divided (1 2)
  • Function is specified and estimated costs
    discussed
  • Purchasing procedures are detailed (goods,
    equipment)

Elements of interest
19
SF Sections
  • 7, 8, 9. LRRD , Mainstreaming
    Visibility/communication strategy
  • The questions substainability and
    mainstreaming are discussed
  • If there are funds for visibility the expense
    must be justified (Visibility Plan)

Elements of interest
20
SF Sections
  • 10. Field Coordination and local implementing
    Partners
  • Mechanisms of connection are explained (Field
    coordination)
  • NEW! This section provides information on
    procedures for the award of service (consultants,
    audit, training, evaluation, etc.) and work
    contracts (building of houses,). Information
    related to procurement of equipment and goods is
    given in point 6.3.
  • The partner shall indicate in this section all
    derogations requested so that ECHO can take a
    decision and if necessary include them in the
    Special conditions of the Agreement.

Elements of interest
21
SF Sections
  • 11, 12, 13. Financial administrative
    information conclusion
  • Basic information on the project is stated
  • NEW! When requesting 100 funding, the partner
    must provide the reasons on which the request is
    based in 11.2
  • NEW! In case of pre-dating of the eligibility of
    expenditures, the reasons on which the request is
    based should be presented in section 11.5.2.
  • Space for conclusions and comments

Elements of interest
22
SF Interim Report
  • The same format of the proposal is used (Single
    Form)
  • It must state in detail progress made STRICTLY
    following the original plan
  • Wherever the data of the proposal has been
    modified or complemented, modifications or
    complementary information should be easy to
    identify visually (NEW! using track changes or
    different colours and fonts).
  • Logframe representing the progress made is
    reported

Elements of interest
23
SF Interim Report
  • To change parts insert activities and changes
    made, insert the phrase Not Applicable in parts
    not modified
  • Section 4 becomes the most important section with
    special attention to

Elements of interest
24
SF Interim Report
  • Special attention must be paid to
  • Note the starting date of the operation and in
    case of inserting a date different from that
    specified in GA, give a reason
  • Request, with a justification, any eventual
    extension of the implementation period
  • Do not modify in any way the specified objective
  • Duly justify any inherent changes in budget
  • Up date relating to 15/30 days preceeding report
    depending on project type

Elements of interest
25
SF Pre-final Report
  • Mandatory only for the types of decision which
    call for it
  • Always the same format
  • Substantially similar in form and objective to
    the Interim Report
  • The preliminary final report is the last chance
    to introduce a request for amendment.

Elements of interest
26
SF Final Report
  • Use the same format (Single Form)
  • Defines the framework reached at end of operation
  • The rules of filling it in remain unvaried

Elements of interest
27
SF Final Report
  • Previously used methods for supplying information
    are still valid
  • Extreme care must be made in filling the Sections
    4 (Operational Framework), 6 (Resources), 7
    (LRRD), 8 (Mainstreaming) e 9
    (Visibility)
  • All additional comments are to be made in section
    13
  • Indicators (levels reached), modifications made
    to plan and possible impact are detailed and
    discussed
  • All details of procedures followed for the
    contract are supplied

Elements of interest
28