Title: Advanced Technology Solar Telescope ENCLOSURE


1
Advanced TechnologySolar Telescope ENCLOSURE
Performance
LeEllen Phelps
January 2006
2
Enclosure Systems Design ReviewTopics of
Discussion
  • Overview Charge to Committee (Mark Warner)
  • 6 Major Parts of SDR
  • SRD Flow Down Error Budgets (Rob Hubbard)
  • Specifications (LeEllen Phelps)
  • Reference Designs (LeEllen)
  • Lunch
  • Performance Analyses (LeEllen)
  • Contracting Approach (Mark)
  • Risk Areas (LeEllen)
  • Plans for Future Work (LeEllen)
  • AOB
  • Executive Session (closed session for committee
    members)
  • Feedback from Committee (All Hands)
  • --------------------------------------------------
    --------------------------------------------------
    ----
  • Dinner

Overview Charge to Committee
2
January 18, 2006
3
Enclosure PerformanceEnclosure Thermal Control
Overview
  • Function Suppress seeing

Air Scavenging System
Carousel Cooling System Lower Enclosure Cooling
Seeing is caused by temperature differences
If a surface is the same temperature as the
surrounding air, that surface introduces no seeing
4
Enclosure Performance Enclosure Thermal Control
Overview
  • Interior Seeing
  • Fluent
  • Shell Seeing
  • MuSES
  • M3
  • Site data
  • Energy Conservation
  • AMEL

Enclosure Performance
4
January 18, 2006
5
Enclosure PerformancePassive Ventilation
  • Overview
  • Requirements and Goals
  • Configuration for analyses
  • CFD Results
  • Phases 2, 3 at Fluent Inc. (Phase 1 was an old
    design)
  • Validation via CosmosFloWorks

Enclosure Performance
5
January 18, 2006
6
Requirements and Goals
Enclosure PerformancePassive Ventilation
  • Minimum of 20 enclosure volumes per hour
    passive air flushing
  • For wind speeds greater than 2 m/s from any
    azimuth direction
  • No stagnant dead zones inside enclosure
  • Ability to throttle down interior air flow as
    outside wind speed increases (max interior air
    velocity 5 m/s)
  • No direct sunlight to enter enclosure
  • System should fully seal out weather during
    non-operational periods (e.g., overnight, rainy
    periods)
  • Low-risk, high-reliability system
  • COTS-type equipment
  • Equipment easily serviced, replaced

Enclosure Performance
6
January 18, 2006
7
Enclosure PerformancePassive Ventilation
  • 3 sunshades on each side of enclosure
  • Keep sunlight from entering enclosure
  • Keep ice, snow, rain from reaching vent gates
  • Help catch and direct wind into enclosure
  • 3 vent gate sizes
  • 6m x 2m
  • 5m x 2m
  • 3m x 2m

Enclosure Performance
7
January 18, 2006
8
CFD Results Fluent, Phase 2
Enclosure PerformancePassive Ventilation
  • Three wind directions East, South, and South
    East
  • One wind speed 5 m/s (11.2 MPH)
  • Shutter angle 45-degrees elevation
  • Results meet requirements and goals
  • 36-240 enclosure volumes/hour (requirement 20)
  • Minimal flow up side of enclosure
  • Minimal recirculation inside enclosure
  • Mostly single-pass recirculation
  • Good air flow through dome centerline (i.e.,
    telescope location)
  • 30-40 of outside wind speed from floor to ceiling

Enclosure Performance
8
January 18, 2006
9
Velocity Vectors
Enclosure PerformancePassive Ventilation
Enclosure Performance
9
January 18, 2006
10
CFD Results Fluent, Phase 3
Enclosure PerformancePassive Ventilation
  • Additional Runs
  • North flow cases (with rear vent/access door)
  • Shutter angle effects (15 deg from horizon,
    zenith)
  • E, S, N, SE flow cases
  • Telescope obstruction effect
  • One wind speed 5 m/s (11.2 MPH)
  • Results consistent with Phase 2 results
  • 35-220 enclosure volumes/hour (requirement 20)
  • Flow mostly thru flow, with some single-pass
    recirculation
  • TMA causes a minor flow disruption
  • Primarily at base of TMA, below mirror
  • Some slowing of flow downstream of TMA
  • Minor reduction (3-5) of total throughput
    through enclosure
  • Good flow/flushing across optical path of TMA

Enclosure Performance
10
January 18, 2006
11
Enclosure PerformancePassive Ventilation
Flow path lines through Enclosure with Telescope
Mount Assembly (TMA) as flow obstruction
Enclosure Performance
11
January 18, 2006
12
Velocity Contours with TMA
Enclosure PerformancePassive Ventilation
Enclosure Performance
12
January 18, 2006
13
Enclosure PerformancePassive Ventilation
Enclosure Performance
13
January 18, 2006
14
Enclosure PerformancePassive Ventilation
Enclosure Performance
14
January 18, 2006
15
Enclosure PerformancePassive Ventilation
Enclosure Performance
15
January 18, 2006
16
CFD Results Validation
Enclosure PerformancePassive Ventilation
  • Water, air tunnel testing too expensive for
    current DD phase budget
  • CosmosFloWorks CFD package used to check
    Fluents results
  • Different solver, analytical method
  • Good agreement for results
  • Total throughput within 5 for all flow
    direction cases
  • Individual vent gate throughput 3-8
  • Interior velocities _at_ specific points 7
  • Also used to check Site performance

Enclosure Performance
16
January 18, 2006
17
Enclosure PerformanceShell Seeing Overview
  • Overview
  • MuSES
  • for performance analyses
  • for design development
  • Other tools
  • for Lower Enclosure
  • for optimization
  • Results
  • M3 designs
  • Value Engineering

Enclosure Performance
17
January 18, 2006
18
MuSES Modeling Validation at Gemini North
Enclosure Performance Skin Thermal Control
Development
Validation
Enclosure Performance
18
January 18, 2006
19
MuSES Analyses forSkin Thermal Control
Development
Oblique skin panels air cooled, h 5 W/m2-K
Shutter air cooled, optional water cooling on
lower end hair 8 W/m2-K hH2O 100 W/m2-K
Option use fins on skin underside to increase
effective area
Enclosure support wall water cooled if
presenthH2O 100 W/m2-K
Sun-facing skin panels air or water cooled hair
5 W/m2-K hH2O 100 W/m2-K
Enclosure Performance
19
January 18, 2006
20
Enclosure PerformanceShell Seeing
  • Enclosure Heat Loads
  • Heat load on the Enclosure was developed using
    MuSES analyses
  • Heat load for each part was established (W/m2)
  • These loads were the basis for the M3 designs

Enclosure Performance
20
January 18, 2006
21
Enclosure PerformanceShell Seeing
  • Lower Enclosure
  • Absorbed solar load figure was developed using
    MuSES analyses
  • Air volume for each part was established (cfm)
  • These loads were the basis for the M3 designs

Velocity provided by fans
Loads influenced by surrounding ground treatment
Enclosure Performance
21
January 18, 2006
22
Enclosure PerformanceThermal Systems Optimization
Ground Treatments
Enclosure Performance
22
January 18, 2006
23
Enclosure PerformanceThermal Systems Optimization
Enclosure Performance
23
January 18, 2006
24
Enclosure PerformanceThermal Systems Optimization
  • Look at MuSES model with no cooling
  • Minimize irradiated surface area
  • Optimize for times of excellent seeing

Enclosure Performance
24
January 18, 2006
25
Enclosure PerformanceShell Seeing
Overall, excellent seeing occurs first thing in
the morning
Excellent seeing with no wind and low wind
conditions occurs only rarely outside of morning
hours
Enclosure Performance
25
January 18, 2006
26
Enclosure PerformanceShell Seeing
  • Reduced plate coil coverage
  • Reduced Lower Enclosure Cooling System

Enclosure Performance
26
January 18, 2006
27
Enclosure PerformanceEnergy Conservation
  • EnergyolutionsSM for Business
  • Maui Electric Co., Ltd. capacity deferment
    program
  • Funds energy studies to explore energy-efficient
    options in new construction
  • Recommended Energy Conservation Measures (ECMs)
    eligible for rebate program
  • AMEL Technologies, Inc.
  • Melek Yalcintas, Ph.D., P.E., LEED-AP

Enclosure Performance
27
January 18, 2006
28
Enclosure PerformanceEnergy Conservation
  • Review the current baseline and determine the
    most energy efficient design options for
  • Enclosure and SO facilities envelope design
  • Temperature control strategies and chiller plant
    configuration
  • Lighting systems
  • Motor and motor control systems
  • Other applicable mechanical and electrical
    equipment
  • Determine the estimated construction costs,
    associated energy savings, simple payback, return
    on investment (ROI) for each recommended Energy
    Conservation Measures (ECMs).

Enclosure Performance
28
January 18, 2006
29
Enclosure PerformanceEnergy Conservation
  • Determine the estimated construction costs,
    associated energy savings, simple payback, return
    on investment (ROI) for each recommended Energy
    Conservation Measures (ECMs).

MECO Energy Solutions
Enclosure Performance
29
January 18, 2006
30
Enclosure PerformanceEnergy Conservation
Enclosure Performance
30
January 18, 2006
31
Enclosure PerformanceEnergy Conservation
  • Recommended ECMs
  • Chiller Plant Option 4 Low temperature chiller
    operation with ice storage system.
  • VFDs on upper enclosure pump and lower enclosure
    fan motors.
  • VFDs or similar technologies for upper enclosure
    and telescope system rotating equipment.
  • Thermal control system for upper enclosure
    integrated wind speed as a control variable.
  • Upper enclosure early morning thermal controls by
    active ventilation.
  • Reflective treatment of the enclosure surrounding
    with 35 meter diameter white concrete ground
    treatment with vertical shield.
  • NEMA premium efficiency motors, T8 fluorescent
    lighting and occupancy sensors where applicable.

Enclosure Performance
31
January 18, 2006