Title: GASU/PDU MRR Part 2


1
GASU/PDU MRR Part 2
GLAST Large Area Telescope B. Estey,
Production SLAC esteyb_at_slac.stanford.edu (650)
926-8531
2
Parts, Materials, and Processes
  • EEE Parts
  • All EEE parts have been approved for use by the
    Program Parts Board
  • Status of PDU Box Level Parts Qualification, Rev.
    C1 (highlighted yellow itemspart approved, not
    in use)
  • Some columns have been hidden to assist in
    presentation reading

3
Parts, Materials, and Processes
  • EEE Parts, contd
  • Status of PDU CCA Parts Qualification, Rev. Q
    (highlighted yellow part approved, item not in
    use)
  • Some columns have been hidden to assist in
    presentation reading

4
Parts, Materials, and Processes
  • EEE Parts, contd
  • Status of PDU CCA Parts Qualification, Rev. Q,
    contd (highlighted yellow part approved, item
    not in use)
  • Some columns have been hidden to assist in
    presentation reading

5
Parts, Materials, and Processes
  • EEE Parts
  • Status of GASU Box Level Parts Qualification,
    Rev. C (highlighted yellow itemspart approved,
    not in use)
  • Some columns have been hidden to assist in
    presentation reading

6
Parts, Materials, and Processes
  • EEE Parts, contd
  • Status of GASU CCA Parts Qualification, Rev. Q
    (highlighted yellow itemspart approved, not in
    use)
  • Some columns have been hidden to assist in
    presentation reading

7
Parts, Materials, and Processes
  • EEE Parts, contd
  • Status of GASU CCA Parts Qualification, Rev. Q,
    contd (highlighted yellow itemspart approved,
    not in use)
  • Some columns have been hidden to assist in
    presentation reading

8
Parts, Materials, and Processes
  • EEE Parts, contd
  • Status of GASU PS CCA Parts Qualification, Rev. H
    (highlighted yellow itemspart approved, not in
    use)
  • Some columns have been hidden to assist in
    presentation reading

9
Parts, Materials, and Processes
  • Materials
  • All Materials have been approved by the Program
    MPRB in accordance with LAT-SS-00107, LAT
    Mechanical Parts Plan
  • GLAST/LAT Material Usage Agreement 002 (MAR DID
    No. 313 LAT Document LAT-TD-04756-01)-
    Approved 9/13/04
  • Processes
  • All processes have been reviewed and approved by
    the Program MPRB in accordance with LAT-SS-00107,
    LAT Mechanical Parts Plan

10
Procurement Status
  • Assembly Subcontractor
  • Aeroflex, Inc., Colorado Springs, Colorado was
    awarded the contract to provide the assembly
    service and CCA level thermal cycling for the PDU
    and GASU (Reference LAT-PS-04171, SOW LAT PDU and
    LAT-PS-03081, SOW LAT GASU)
  • EEE Parts
  • All EEE parts are SLAC furnished and have been
    procured for the PDU and GASU
  • Outstanding receipt of Omnirel Regulator expected
    2/25/05
  • Part no. OMR9604SCK
  • Miscellaneous Subassemblies
  • Internal harness and cable assemblies due
    3/14/05
  • Metal Fab Parts and Fasteners
  • All Metal Fab parts and Fasteners are SLAC
    furnished and have been procured and received for
    the PDU and GASU
  • PWBs
  • The PWBs for PDU and GASU are SLAC furnished and
    have been procured and received. Coupons for
    boards being used for flight have all
    successfully passed testing.

11
Procurement Status
  • FPGA Programming
  • Programming of the FPGAs has been contracted to
    ACTEL and is complete for 1 box each PDU and
    GASU. Remaining parts will be programmed after
    some level of confidence testing of the first
    article CCAs.
  • Materials
  • Assembly shop floor materials are furnished by
    Aeroflex in accordance with drawing and SOW
    requirements (adhesives, conformal coating, wire,
    primer, etc.)

12
Manufacturing Facilites
  • Assembly contract has been awarded to Aeroflex,
    Inc., located in Colorado Springs, Colorado
  • Aeroflex specializes in the Manufacturing of
    Micro Electronic and Circuit Card assemblies.
    Aeroflex fabricates assemblies for aerospace,
    defense and commercial applications. They are an
    ISO 9001 (DSCC) certified company, founded in
    1990 which merged with UTMC in 1996
  • A Quality Survey and Process Review was was
    conducted by SLAC and NASA Product Assurance on
    January 26, 2005
  • Certifications / Qualifications
  • - ASQ Rocky Mountain Quality award
  • - ISO 90012000 certified by the Defense Supply
    Center, Columbia
  • Aeroflex performs to the intent of the following
    documents, assuring Quality and Workmanship
    Acceptability
  • MIL-STD-2000A
  • IPC-A-610 CLASS 3
  • MIL-PRF-38535
  • IPC/EIA J-STD-001C
  • NASA 8739 series
  • NHB 5300
  • MIL-STD-1686
  • MIL-HDBK-263
  • EIA-625
  • ANSI/ESD S20.20-1999

13
Manufacturing Facilites
14
Manufacturing Facilites
15
Manufacturing Facilites
16
Manufacturing Facilites
17
Manufacturing Process Flow-Aeroflex
18
Manufacturing Process Flow-Aeroflex
19
Manufacturing Process Flow-Aeroflex
20
Manufacturing Process Flow-Aeroflex
  • A flow similar to PDU for GASU is under
    construction
  • All routers will be reviewed and approved by SLAC
    prior to production start

21
Configuration Management
  • Required changes to documentation during the
    manufacturing phase at Aeroflex will be
    immediately documented on an NCMR and forwarded
    to SLAC for disposition
  • All outstanding changes to documents will be
    incorporated and a new revision released into LAT
    DOCs prior to final inspection at each
    manufacturing level (CCA, Module)

22
Configuration Management
  • All change notices will include full disposition
    of hardware

Disposition of Hardware
23
Thermal Cycle Requirements at CCA Level
Figure 1. Vibration Levels, Duration, and Spectra
24
PDU/GASU Qualification and Acceptance Test Matrix
25
Production Schedule
26
Production Schedule
27
Production Schedule
28
Production Schedule