Title: Other Opportunities for SLAC
1 Other Opportunities for SLAC
SLAC Scenarios Study, Part B P.
Burchat, E. Colby, LD, P. Drell, J. Hewett, T.
Himel, B. Jacobsen, S. Kahn, Y. Karyotakis,
H. Neal, B. Schumm, J. Seeman, D. Su
Scenarios Town Meeting, 11/25/03
2 Process Committee surveyed the
major themes in HEP and Particle Astrophysics
Cosmology, decided which themes deserved study
days
- B day (3/20/03) 1036 (or 2 x 1035?) ee- B
factory - (Cahn, Hitlin, Seeman, Sullivan)
- Neutrino day (4/18/03) neutrino oscillations,
n-less double-b decay - (Kayser, Feldman, Wojcicki, Freedman,
Prescott) - LHC day (4/24/03) accel. detector projects for
lumi. upgrade - (Strait, DeRoeck, Green)
- Z/Higgs day (5/1/03) gg and ee- machines at E
lt 250 GeV - (Gronberg, Raubenheimer, Peskin, Woods)
- Two beam day (5/19/03) additional gg and ee-
machines - CLIC RD plasma afterburner
- (Asner, Ruth, Wuensch, Katsouleas)
- Cosmology day (6/13/03) Unveiling dark
matter/energy - (Hogan, Linder, Bernstein, Mushotzky)
3- Process (cont.)
- Discussed process future of lab with SLAC
director - and former laboratory leadership.
- 7/11/03
- Presented summaries of the days at
- SLUO town meeting, solicited additional input
- from community.
- Met to winnow down options to forward to
- phase II of study.
- Criteria
- Cutting edge science
- Serves/involves user community
- Scope commensurate with national lab, not user
group - A 500 GeV LC exists somewhere in world, hence
- dont duplicate
- be realistic about available
4- Dreams Deferred
- What we took off the table, and why
- 2 beam ZH factory ( 10K H/yr, 3B)
Duplicative of - 500 GeV LC, too expensive.
- 2 beam Z factory ( 6G Z/yr, 1.5B) Too
expensive for precision EW physics in the LC
era. - gg -gt Higgs shop ( 2K H/yr, 1B) Hgg
coupling information unique, but little other
physics. Requires very light Higgs, advances in
gradients, and significant . - gg _at_ 30 GeV (200-500M) QCD/2g physics. Pave
way for higher energy gg collider. Not enough
HEP interest. - plasma afterburner for ee- -gt ZH (1K H/yr?,
??) Technology still too immature. - Long baseline n oscillations Much recent
progress, promising future. However, SLAC role
unclear - Accelerator-based experiments require large
proton drivers. Detector also off-site in
current plans. - Many others working on these problems now -gt Stay
informed.
5- More Dreams Deferred
- reactor ns and qe3 (lt50M) Intriguing quick
dirty approach to n-mixing, prospects for future
CP studies. - Left out as below radar screen.
- megaZ (multi-bunch, mostly S-band, linac,
- ee- -gt Z, 50M Z/yr, 150M(?))
- Substantially reduce ALR, Ab uncertainties. Some
B physics too. - X-band portion could serve as LC testbed.
- But
- Incompatible with LCLS unless made much more
expensive. - Too late for realistic testbed if LC is on
track. - Demand for precision EW measurements in LHC/LC
era depends - on type of new physics.
- Should LC be delayed or cancelled, and/or should
LHC results be puzzling, revisit megaZ, but do
not include in scenarios.
6- Dreams to Pursue Flavor Physics
- A 2 x 1035 (200M) or 1036 (500M) B factory
- If there is new physics in the quark flavor
sector, such a machine should be built.
Complements LHC (e.g. in SUSY, - LHC sets the overall squark mass scale, B factory
provides phase, mass splitting information). - 1036 fully competitive with hadronic B factories
in Bd decays. - 2 x 1035 competes in several significant modes.
- In light of physical and fiscal uncertainties,
- keep 4 options open for now
- 0, 2 x 1035, or 1036 at SLAC, or 1036
at KEK - (Luminosities refer to post-PEPII upgrade plans
(3 x 1034).) - This is the major variable between scenarios.
- Neutrinoless double beta decay Sensitive to
overall mn, - Majorana vs. Dirac, lepton number violation
(leptogenesis). - If EXO RD successful, project is 50M (plus Xe
enrichment), small number of SLAC FTEs. Keep in
all scenarios.
7- Dreams to Pursue Energy Frontier Astro
- Involvement in LHC upgrades LHC is the high
energy frontier, - at least until LC turns on. It will remain
complementary to LC. - Opportunities for SLAC community to be involved
in LHC physics by participating in accelerator
detector upgrades. - Most likely first upgrade is 10 x luminosity
upgrade. - Machine opportunities in this phase include
- RF upgrades to shorten bunch lengths
- RF crab cavities to increase crossing angle
- Major detector challenge is inner tracker,
particularly - R lt 20 cm which requires new, very rad hard
technology. - Particle Astrophysics Cosmology Kavli
Institute implies significant involvement here.
Committee didnt want to identify specific
projects here, for fear of prematurely tying
hands of Kavli. But Kavli/SLAC have taken rapid
steps toward participation in two major cosmology
projects, SNAP LSST - (dark matter/energy) projects.
- -gt at least a doubling of current SLAC efforts
(GLAST).
8- Dreams to Pursue synchrotron light
- Scenarios Committee did not delve into details,
as there are - already fairly well-defined opportunities,
including - Construction of additional undulator beamlines
and - experimental stations for LCLS.
- LCLS-related accelerator RD electron gun,
lasers, undulators - Dreams to Pursue future energy frontier
- High Gradient Accelerator RD In the long term,
it is central to the continued progress of
accelerator-based HEP. - Proofs-of-principle underway for plasma laser
based methods. - Level of effort should grow, and further engage
the intellectual capital of the user community.