News - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

News

Description:

Clean and Dirty Gas systems are finished (JK) and approved by HH, TD, KK. ... COMICS download of Front-Ends updated. D0 Muon Group. November 2000 ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 8
Provided by: die82
Learn more at: http://www-d0.fnal.gov
Category:
Tags: comics | dirty | news

less

Transcript and Presenter's Notes

Title: News


1
News
  • Collision Hall Access
  • A special access list D0 Hazard Awareness
    Gert for now
  • Changes to MCH3 Power Distribution pending
  • Muon Commissioning Leaders
  • Post-Docs and senior graduate students with a big
    role in commissioning. Role is
  • to assist in commissioning organization
    especially integration
  • to assist in shift training
  • Steve Doulas, Rob McCroskey, Dennis Shpakov

2
PDT Commissioning
  • Gas System
  • At Present
  • Ar(80)-CH4(10)-CF4 (10) Gas in 1st 6 PDTs
  • Most PDTs are leak-checked.
  • Design
  • Clean and Dirty Gas systems are finished (JK)
    and approved by HH, TD, KK.
  • Design for Gas Recycler/Cryogenic Cleaning has
    started (JK)
  • Running at full speed (4 liters per minute per
    pdt) in one pass mode is too expensive
  • Late Developing Problem has come up
  • 80-10-10 is flammable (barely) in air.
  • Considering mixtures of Ar-CO2-CF4 and mixtures
    with less methane e.g. Ar(82)-CH4(8)-CF4(10)
  • For now - pdt hv is off until Monday (slow gas)
    at which time we will have 6 PDTs on Argon-C02
    which has a 1.2 microsec max drift time.

3
Gas System Design
4
PDT Infrastructure
  • 58/94ths PDTs have finished cables - remaining
    underway (no update) though I know Herman, Tom
    M., Carl Lundberg and Victor Bogyagin have made
    progress
  • Electronics (no update)
  • 90/94ths LVPSs installed tested
  • 84/94ths FEBs installed
  • 18/94ths Control Cards installed
  • Monitoring, Control, Readout
  • Hardware database increased to 94 PDTs.
  • Plague of problems suppressed (SH, FB, TD)
  • COMICS download of Front-Ends updated

5
Data Taking w/ 6 PDTs
  • All files copied to domino directory
    /prj_root/808/mtst_1/group_datafiles
  • Module ID problem in data
  • Some anecdotal evidence regarding crashes
  • Get more events before crash if less PDTs have
    data
  • Get fewer events before crash if L1 rate is
    higher
  • Lately, PDT 121 seems to be the culprit (I didnt
    always check which had died).
  • 104870, 104901, 104903 sent to reco farm.
    Probably a D0 daq milestone!
  • Short Term Plan for this week
  • study crashes in the first 6 PDTs
  • commission L3 filter on events with PDT data
  • Reposition the adc and time gates a little later
    Tested positions.
  • add A-layer top east PDTs continues

6
Aphi and Cosmic Cap
  • First (East side) of two central muon readout
    crates is stable and has been readout many times.
  • West Side has all connections and cards (borrowed
    FMUs MFC) including VBD. I believe the PC needs
    a little setup.
  • Steve, Dennis, Vladimir working on electronics
    pulsing and LED pulsing in local data-taking
    mode.
  • Plan for this week
  • Change trigger from or-of-ors to or-of-ands
    for Cosmic Cap cosmic runs. Done.
  • Readout west scint crate Close.
  • Readout east west scint crates together.
  • Continue to develop local data-taking and pulsing.

7
Data Taking w/ 6 PDTs
  • 6 PDT Cosmics Runs
  • HV nominal, xad pipelines
  • 104809 -1467 events, FEB crashed
  • 104815 -1367 events, FEB crashed
  • CFG.dat confusion
  • 6 PDT Cosmics Special Runs
  • 104869 -543 events, HV for 111, 211 off FEB
    crashed
  • 104870 -4561 events, HV for 111,211,121,221 was
    off, ended normally.
  • 104871 -1051 events, HV for B-layer off
  • CFG.dat file 211, 111, 221, 121, 231, 131
  • 6 PDT Cosmics Runs
  • HV nominal, xad pipelines
  • 104901 -839 events, FEB crashed
  • 104903 - 340 events, FEB crashed
Write a Comment
User Comments (0)
About PowerShow.com