Animal Users Meeting - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Animal Users Meeting

Description:

Relocation of the rooftop aviary. LSB DXUnit. LSB HVAC. LSB Diesel Generator ... PRF Aviary (from LSB roof top) Upgrades to Cage Wash Area. Dirty Side. Clean Side ... – PowerPoint PPT presentation

Number of Views:49
Avg rating:3.0/5.0
Slides: 26
Provided by: prov81
Category:
Tags: animal | aviary | meeting | users

less

Transcript and Presenter's Notes

Title: Animal Users Meeting


1
Animal Users Meeting
  • Animal Users Advisory Committee
  • October 14, 2009

2
Agenda
  • Restructuring of animal per diem charges
  • Establishment of the Research Incident Response
    Team (RIRT) Committee - Beth Israel
  • Support for renovation of animal space in the
    Psychology Building - James Badman
  • Overview of the LSB building renovation - James
    Badman
  • Establishment and implementation of a space
    allocation/tracking committee - Joanne

3
Agenda
  • Inspection, findings, and outcome of the last
    AAALAC inspection
  • DACT/IACUC Sharepoint site development - Deb
    Murphy/Cynthia Heimerich
  • DACT Newsletter - Joanne Tetens
  • New full time Clinical Veterinarian (Dr. Juan
    Jordan) - Joanne Tetens 
  • Questions and Answers

4
Animal Per Diem Charges
  • New rates distributed and went into effect July
    1, 2009
  • Will ramp up to a 25 OVPREA subsidized rate over
    the next several years
  • Factors in an annual 3 COLA
  • Rate calculations to be performed by DACT every 3
    years
  • Next rate calculation to be done in 2012
  • Custom rates calculated for unique
    species/special housing requirements
  • Please contact DACT when preparing grant
    submissions

5
Research Incident Response Team
  • First meeting was held on October 6, 2009
  • Membership included
  • Investigators
  • DACT
  • FacMan
  • Media Relations
  • Ethicist
  • Security

6
Psychology Building
  • C06 Grant submission - 15M
  • Not funded
  • Renovations needed
  • Emergency power support
  • Upgrade of the sanitation center
  • Restructuring of the animal holding rooms and
    testing/procedure rooms
  • Enhanced security
  • Installation of the ISAAC system
  • Elevator upgrades and eyewash installation

7
Overview of the LSB Renovation
  • Started in November 2008 and completed in June
    2009
  • Renovations included
  • HVAC GTS Humidifier
  • Diesel Generator
  • Metasys Environmental Monitoring
  • Independent temperature control to the first
    floor
  • Autoclave
  • Relocation of the rooftop aviary

8
LSB DXUnit
9
LSB HVAC
10
LSB Diesel Generator
11
Price Road Facility RPV Outbreak
  • RPV detected in sentinel and colony animals
  • Management
  • Transgenic breeders screened using serology and
    PCR
  • All other existing animals utilized or culled
  • Facility decontaminated using chlorine dioxide
    gas
  • Renovations made to enclose cage wash area
  • Changed to irradiated feed and bedding
  • Attempting to transition all rodents to
    microisolator caging

12
Renovations to PRF
13
PRF Aviary (from LSB roof top)
14
Upgrades to Cage Wash Area
  • Dirty Side
  • Clean Side

15
Eyewash Stations
  • Installed in LSB, PRF, ISTB1, Psychology

16
New Chiller
17
Space Allocation and Tracking Committee
  • Questionnaire to be distributed to all animal
    users to ascertain current and future project
    projections
  • The information will be used to determine current
    availability and future vivarium space
    requirements for ASU

18
AAALAC Site Visit
  • March 5-6, 2009
  • 4 site visitors spent 2 days evaluating the
    program, the animal facilities, and investigator
    laboratories
  • Post site visit communication
  • Item for Correction
  • Need for emergency shutoff and personnel training
    in PRF rack washer - completed
  • Suggestions for Improvement
  • Inconsistencies in signage corrections being
    implemented
  • Exceptions from The Guide system established
    with the IACUC and AV
  • Semi-annual inspection reports and completion
    dated system revised
  • Controlled drug tracking system revised
  • Annual B virus training instituted

19
AAALAC Site Visit
  • Response from AAALAC Council June 2009
  • Full AAALAC accreditation granted with NO
    suggestions for improvement

20
DACT Sharepoint Site Development
  • Currently under development
  • Fees, forms, training, links (to IACUC and EHS),
    facility info for grants, etc
  • Use by the IACCU/AUAC

21
DACT Newsletter
  • Initially sent out monthly but now sent out every
    2-3 months
  • Will be archived on the DACT Sharepoint site
  • Suggested articles/topics welcome

22
DACT Staffing Changes
  • Clinical Vet
  • Dr. Juan Jordan September 09
  • Biodesign Supervisor
  • Caroline Mead May 2009

23
DACT Staffing Changes
  • Price Road Facility Supervisor
  • Tim Corsi October 2009
  • LSB/LSD Lead Technologist
  • Susan Neill-Eastwood June 2009

24
Staffing Relocations
  • Gloria Aerni Associate Director
  • ECA 348
  • Lori Stanley Accounting Associate
  • ECA 304
  • Dr. Juan Jordan Saiz Clinical Veterinarian
  • ECA 306

25
Questions
Write a Comment
User Comments (0)
About PowerShow.com