Visit to CERN/CMS Jan 2006 - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Visit to CERN/CMS Jan 2006

Description:

Good audio system (fixed microphones) Phone conferencing. Good network access for both... Complementary CMS services. Non-IT ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 18
Provided by: hansfalk
Learn more at: http://docdb.fnal.gov
Category:

less

Transcript and Presenter's Notes

Title: Visit to CERN/CMS Jan 2006


1
Visit to CERN/CMS Jan 2006
  • Patricia McBride
  • Fermilab
  • Slides taken from presentations by Hans Hoffmann
    and Werner Jank

2
CERN/CMS visit
  • Attended meetings as part of CMS/CPT week.
  • Tier0 planning, DQM, CCAR
  • CMS is planning to have a center of activity on
    the Meyrin site in addition to the operations
    centre at Point 5.
  • Space at Point 5 is limited and the Control Room
    is not large enough for all activities.
  • The Meyrin centre is known as CCAR though this
    name will change.
  • At this moment, there is no space at CERN
    assigned to this centre.
  • There is a proposal to use a space that is
    currently occupied by the print shop and the mail
    room. This space belongs to the IT division but
    may be made available to CMS - negotiations
    underway. However, funds are not yet secure.
  • Their space planning combines remote operations
    and other activities.
  • They would like to work together with us on
    planning for remote operations.
  • We met with Hans Hoffmann, Werner Jank and Sergio
    Cittolin to discuss our plans for LHC_at_FNAL.
  • They will try to help us with security issues if
    we need it.
  • We visited Point 5, the control room building and
    the CMS hall.
  • http//boudin.fnal.gov/CMSFeb06.mov

3
CMS Meyrin Centre
  • First years of data with CMS
  • Monitor the operation of the experiment - control
    in Cessy
  • Near-line control of Data Quality, in particular
    by the sub detectors
  • Control and operate the CMS use of the worldwide
    computing facility
  • Functions to be covered
  • Conference room for 200 persons
  • Control and Monitoring Room for near-line
    activities of CMS
  • Workplaces for combined Data Quality work
  • Offices for Persons responsible for near-line
    activities
  • CERN Visitor facilities
  • Discussion areas

4
Building 510 CCAR
Work-area
Work-area
Meeting
Technical
Visitors in/out-general
print shop
Coffee- discussion
Monitoring/ Control room
Conference
Offices
Offices
5
CCAR (possible) layout
Towards Main Building
Space breakdown Control room 1 150
m2 Conference room 1 300
m2 Meeting/VRVS room 1 70 m2 Technical
room 1 80 m2 Group work room
1 140 m2 Office space 40
400 m2 Available cooling power 110kW
Secr.
Office
Technical
Collaborative work
Meeting
Visitors
New printshop
Control room
Conference
Visitors
Office
Office
6
CCAR Basic concept
  • Allow operations team to work effectively
    together!
  • Facilitate communication of all kinds
  • Technical communications
  • Point 5
  • LHC control room
  • Tier-0
  • CAF
  • Outside facilities (Tier-1s, Tier-2s)
  • People communications
  • Between operators
  • Subdetectors
  • Calibration / alignment
  • express line(s)
  • (prompt) analysis groups
  • Physics community
  • Regular (daily/weekly) updates
  • Become Centre of Operations

7
CCAR Meeting Rooms
  • Conference room (200 people)
  • Regular discussion meeting
  • Daily to weekly, update collaborators
  • Discuss status, short term plan, physics,
  • 2 big display screens
  • CMS, LHC status
  • Videoconferencing (VRVS)
  • 2 wall projectors (VRVS, Local presentations)
  • Excellent audio system (fixed mobile
    microphones)
  • Meeting room (50 people)
  • Smaller, more dedicated discussions
  • Physics, (sub)detector related
  • Videoconferencing (VRVS)
  • 2 wall projectors (VRVS, Local presentations)
  • Good audio system (fixed microphones)
  • Phone conferencing
  • Good network access for both
  • Sufficient wall outlets for fixed DHCP
  • Good WiFi coverage

8
Conference Room - Sergios view
9
Monitoring (Remote Control) Room - 1
  • Monitoring
  • Initially used for monitoring, real CR at P5
    only!
  • Clone of Point-5 CR (to some extent)
  • Acquire experience and confidence for control
    operations
  • Understand sharing of responsibilities for
    distributed control
  • Video link to Point-5
  • Detector status
  • LHC status
  • Physics displays
  • Express line
  • Event displays
  • Histograms, data quality,
  • Webcam displays

10
Monitoring (Remote Control) Room - 2
  • (CMS Offline!) Computing operations
  • Excellent communications with Point-5, IT and
    outside experts!
  • Needed from the beginning!
  • Making full use of IT facilities and services
  • Tier-0, CAF
  • COOL, 3D, LSF, AFS, Castor2
  • General services
  • interactive service, build system, ORACLE,
    Monitoring
  • GRID services
  • RB, BDII, SE, CE, FTS, SRM, GridFTP, Myproxy
  • Complementary CMS services
  • Non-IT
  • DBS, DLS admin and operation, fast File- and CPU
    servers, graphics servers,
  • Tier-1s
  • Phedex , Frontier, data management, heartbeat

11
Monitoring Room - Sergios view
12
Monitoring (Remote Control) Room - 3
  • Infrastructure
  • 15 - 20 people
  • 2 big display screens for video link
    (VideoOverIP)
  • CMS, LHC status
  • 4 wall projectors
  • Monitoring of detector, IT services, data
    quality, physics,
  • Also for VRVS when needed
  • 4 - 6 Operators desks
  • 3 graphics desktops
  • Local VRVS
  • Printer
  • Phone
  • 3 fixed network sockets for DHCP
  • Good WiFi coverage
  • 2 - 4 webcams

13
Work Areas - 1
  • For small groups
  • 3 - 5 people each
  • Allow experts to work together in close proximity
  • Subdetector oriented
  • 10 subdetectors
  • Detailed (sub)detector monitoring
  • Calibration, alignment
  • Problems, performance, dead channels,
  • First pass data processing
  • 5 physics analysis groups
  • Hot trigger channels
  • High priority, short latency data processing and
    analysis
  • .. Flexible setup
  • Easy reconfiguration to adapt to needs
  • Standard configuration

14
(typical) Work Area
Status Displays
Physicist
Keyboards
Screens
Printer
Phone
15
Work Areas - Sergios view
16
Networking
  • Excellent network connectivity
  • Very reliable and fast
  • 1 GbEN for desktops
  • To B513 (Tier-0, CAF) and Point-5
  • 2 x 10GbEN
  • Trusted network for Control Room (CMS domain)
  • Secure interconnectivity GPN - LCG - CMS
  • Access to lxplus, Tier-0, CAF and Point-5 public
  • Wireless
  • Coverage and speed

17
Summary
  • CERN CMS Operations Centre?
  • Remote Control Room
  • Tier-0 operation
  • CAF (calibration, alignment,)
  • DQM
  • Physics Analysis
  • Tier-1 data distribution, communication
  • More (validation of concept, outreach,..)
  • Goals very similar to LHC_at_FNAL and LPC at
    Fermilab
  • We can/should work together to make these efforts
    a success.
Write a Comment
User Comments (0)
About PowerShow.com