Description:

Anechoic Chamber Testing. Equipment Under Test (EUT) Distance (Dtest) Receive ... but anechoic chamber prediction said worst-case emissions exceed ITU-R line ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 24
Provided by: cbea2
Learn more at: http://www.gb.nrao.edu
Category:

less

Transcript and Presenter's Notes

Title: RFI Management for Single Dish Radio Astronomy at NRAO Green Bank


1
RFI Management for Single Dish Radio Astronomy
at NRAO Green Bank
2
Some Considerations
  • Single dish RA is more vulnerable to RFI than
    array configurations.
  • Protection and source-mitigation are the
    preferred options but not always possible.
  • Weak, narrowband, or intermittent RFI lends
    itself to excision strong, constant, or wideband
    noise-like RFI does not.

3
Protection and Mitigation
  • National/International (Protected Bands)
  • Regional (NRQZ)
  • State (WVRAZ)
  • Site (Site Policy)

4
NTIA Radio Astronomy Allocated Bands
5
NTIA Radio Astronomy Allocated Bands
6
NTIA Radio Astronomy Allocated Bands
7
NTIA Radio Astronomy Allocated Bands
8
The National Radio Quiet Zone
  • Established by an act of congress in 1958
  • Approx. 13,000 sq. mile area
  • Requires coordination for all permanent, fixed,
    licensed transmitters
  • Administered through NRAO Green Bank for the
    mutual benefit of NRAO and the Sugar Grove
    Facility

9
WV Radio Astronomy Zone
  • Established through 37A-1-2 of the West
    Virginia Code The Radio Astronomy Zoning Act
  • Applies to any electrical equipment that causes
    harmful interference to Radio Astronomical
    Observations
  • Increasingly difficult and complex problem due to
    the proliferation of wireless technologies
  • Our Strategy
  • Problem-driven component we will seek
    enforcement only as a last resort, if friendly
    requests repeatedly fail.
  • Proactive component We solicit voluntary
    cooperation PR campaign is in progress to raise
    awareness

10
Zones 1 2 On-Site RFI Policy
  • IPG Develops Policy Site Director has final
    authority
  • ITU-R RA.769 Limit applies

11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
Assessing Equipment For RFI ComplianceAnechoic
Chamber Testing
Amplifier
Receive (Rx) Antenna
Equipment Under Test (EUT)
Cable 1
Cable 2
Distance (Dtest)
Spectrum Analyzer
Cable 3
PowerTx(dBm) Pmeasured(dBm) Lspace(dB)
Gantenna(dB) Gamplifier(dB) Lcables(dB)
20
(No Transcript)
21
(No Transcript)
22
The Show Me Project
150m
23
The Show Me Project
31 or 5dB SN Ratio but anechoic chamber
prediction said worst-case emissions exceed ITU-R
line limit by 22dB....17dB discrepancy???? 60s
integration time of test vs. ITU-R line limit
assumed 2000s integration 10Log(60/2000) -15dB
(close enough)