TucsonWomens Transportation Seminar
  • DOWNTOWN
  • Current Future Transportation

Andrew T. Singelakis Deputy Director, Tucson
Department of Transportation and Michael Barton,
P.E. HDR, Inc.
June 14, 2007
2
Oracle/Drachman/Main Intersection
Existing
  • June December 2007
  • Eliminate traffic circle install signal
  • Allows redevelopment of northeast corner
  • One of several improvements along Oracle Stone
  • 2.2 Million

Proposed
3
Speedway/Main Intersection
  • July 2008 January 2009
  • Dual southbound left turn lanes
  • Northbound right turn lane
  • Northbound bus pullout

4
Granada Re-stripe to 3 Lanes
  • July - August 2007
  • Two travel lanes, one center turn lane
    St. Marys to Alameda
  • Bicycle Lanes

5
5 Points Intersection
  • July - November 2007
  • Re-establish two-way traffic on Stone and 6th
    Avenues Broadway to 18th
  • Bicycle lanes
  • Remove and replace existing pavement with
    rubberized asphalt
  • Reconstruct signal system
  • 3.2 Million

6
El Paso Southwestern Greenway
  • Distance 4.7 miles
  • From Speedway/Main
  • to Kino Sports Complex
  • Est. Cost 6-10 million
  • Funding
  • RTA 3.267 M
  • TE Grant 470,000
  • 2008 Pima Co. Bonds 2 M
  • Challenges Retrofitting Greenway through
    established urban core

7
Fourth Avenue Underpass
  • July 2007 Fall 2008
  • One lane each direction
  • Lighted pedestrian walkways
  • Bicycle lanes
  • Rail for Old Pueblo Trolley Modern Streetcar
  • 26 Million

8
Modern Streetcar
  • Construction 2009 2010
  • COT, RTA FTA project
  • Fixed guideway electric rail system
  • Operates in mixed traffic
  • 100110 Million Capital

9
Modern Streetcar
  • Shares transit
  • stops with buses
  • Enhances
  • Mobility
  • Land use
  • Connection between major activity centers

10
Clark Street Bridge
  • 2008 2009
  • New bridge crossing over Santa Cruz River
  • Accommodate streetcar
  • Río Nuevo project
  • 10 Million

11
Grande Traffic Circle
  • July November 2007
  • New gateway to Convention Center
  • 385,000 Rio Nuevo

12
Downtown Links
  • 2011 2014
  • 4-lane roadway connecting Broadway/ Barraza-
    Aviation Pkwy to I-10
  • In planning/design
  • Bicycle pedestrian access
  • New RR underpass at 6th St.
  • Tucson Arroyo
  • 75 Million

13
Broadway Boulevard Euclid to Country Club
  • Construction after 2011
  • Alignment not yet determined
  • RTA County Bond Funds
  • Beginning planning process
  • High capacity transit
  • Widen to 8 lanes
  • 71 Million

14
22nd Street to 6 LanesI-10 to Tucson Blvd
  • After 2011
  • Beginning planning process
  • Alignment not yet determined
  • Bridge over RR Tracks
  • RTA project
  • 104 Million

15
Euclid Ave./Park Ave. Bicycle-Pedestrian Bridge
  • Underway October 2007
  • 240 ft. Basket Bridge
  • Bicycle/Pedestrian
  • Connect existing Park Avenue/14th St. cul-de-sac
    bike path to Snake Bridge
  • 3.5 Million
  • TE Enhancement
  • FHWA

16
TucsonWomens Transportation Seminar
  • DOWNTOWN
  • Current Future Transportation

Andrew T. Singelakis Deputy Director, Tucson
Department of Transportation and Michael Barton,
P.E. HDR, Inc.
June 14, 2007
Write a Comment
User Comments (0)
About PowerShow.com