Title: Construction Engineering 221


1
Construction Engineering 221
  • Contracts Contractor Procurement

2
Changes
  • Standard practice (expect it its a part of the
    process)
  • Owner has the right (within original scope)
  • Change clauses regulate how a change is suppose
    to take place
  • Equitable adjustment of price and time
  • If not claims and disputes procedures
  • Be careful changes need to be changes
  • Whos asking and are they in line w/ the scope of
    work
  • Has the change clause been followed?

3
Constructive Change
  • What is it?

4
Constructive Change
  • A constructive change to the contract is the
    result of an action, or lack of action, of the
    owner or its agent that can be construed as a
    change to the contract even though the owner did
    not issue a formal, written change order. When
    the contractor is orally directed to do work
    different from, in addition to, or in a different
    manner from the mandated by the contract, a
    constructive change has taken place and the owner
    is responsible for additional cost or time.

5
EXAMPLES of CONSTRUCTIVE CHANGES
  • Owner gives verbal direction to change the design
    of the project
  • Use wallpaper in lieu of paint on walls
  • Contractor usually is required to confirm owners
    direction in writing with a request for a formal
    contract change order for additional costs

6
Acceleration
  • What happens when the owner creates expectations
    that the contractor must complete the project at
    an earlier date?
  • Possible overtime costs to speed up work
  • OR
  • Add more work WITHOUT extending the completion
    date (resulting overtime, etc)

7
Differing Site Conditions
  • Also known as changed conditions or concealed
    conditions
  • No implied contractual right exists for the
    contractor to collect for unforeseen conditions
    -- it needs to be in the contract
  • Its called a changed-condition clause

8
Changed Condition Clause
  • Why is a change-condition clause so important?
  • the purpose of a change-conditions clause is to
    reduce the contractors liability for the
    unexpected and to mitigate the need for including
    a large contingency

9
Contingency
  • What is contingency and what is its purpose in
    life?

10
Contingency Definition
  • Contingency something whose occurrence depends
    on chance or uncertain conditions a possible,
    unforeseen, or accidental occurrence.
  • In construction circles the contingency is the
    sum of money that the contractor adds to their
    bid that will cover any uncertainty they forsee
    in the project.

11
Owner-Caused Delays
  • Why are owner-caused delays a concern to the
    contractor?

12
Owner-Caused Delays
  • Three Reasons
  • Over all completion date not usually a problem
    (contractor gets extension)
  • Ripple effect consequential damages or impact
    cost from unchanged work that resulted from
    project delays. (Can anyone give an example?)
  • Work is deferred to another time period where
    costs are higher. (wages materials)

13
Change Orders
  • Changes scope of work
  • Changes per what drawings specifications
  • Itemized cost breakdown per trade
  • Contract time extensions (IF any)
  • Valid only when signed by BOTH owner contractor
  • Technically a new contract
  • Practically a revision to the original contract

14
Value Engineering
  • What is Value Engineering?

15
Value Engineering
  • Finding a better way to accomplish a construction
    project at less cost
  • Can happen before and after the bid letting
  • Before owner, designer and contractor work
    together
  • After value engineering incentive clause
  • Structures performance, safety, appearance or
    maintenance
  • Contractor is able to share in cost savings
  • Planning, design and constructability

16
What if..
  • The contractor in his original estimate of the
    project had planned to transport concrete on site
    for a small pour with motorized wheelbarrows. On
    the day of the pour the contractors concrete
    pump is now available and is able to switch
    projects and pump the concrete rather than use
    wheelbarrows.
  • Is this value engineering?

17
Is This Value Engineering?
  • NO
  • Any cost savings belongs to the contractor
  • This is not a design change
  • This is the contractor performing the work more
    efficiently

18
Examples of Value Engineering
  • Your turn

19
Indemnification
  • Indemnification (hold-harmless clause)
  • Limited-Form
  • Intermediate-Form
  • Broad-Form

20
Termination of the Contract
  • Material breach of contract
  • By owner failure to make payments or causes
    delays or owner is financially insolvent
  • By contractor nonperformance, faulty
    performance, not on schedule (not showing
    reasonable progress)
  • Mutual agreement both agree to end project

21
Notice to Proceed
  • Formal notification by owner to contractor to
    begin work
  • Establishes the first day DAY 1 of the schedule
    (within 10 days of N.T.P.)
  • A signed CONTRACT to build the project is NOT a
    NOTICE TO PROCEED

22
Subcontract Agreements
  • No contractual relationship between subcontractor
    and owner
  • Retainage is usually the same as in the prime
    contract 10
  • Approval by the owner disapproval not common

23
Word to the Wise
  • immediately in writing (page 153)
  • authorized in writing (page 154)
  • To proceed without written authorization may
    make it impossible (page 154)
  • promptly notify the owner in writing" (page 157)
  • Keep detailed and separate cost records of the
    additional work involved. (page 157)
  • contractor must keep careful and detailed
    records (page 158)

24
Student Chapter AGC
  • First meeting
  • Wednesday
  • Sept. 11
  • 700 PM
  • Special membership deal
  • at first meeting only!
Write a Comment
User Comments (0)
About PowerShow.com