Fast BPM DAQ System Using Windows Oscilloscope-based EPICS IOC M. Satoh, T. Suwada, K. Furukawa Accelerator Laboratory, KEK, Oho 1-1, Tsukuba, Ibaraki, 305-0801 Japan Jian Wang Department of Modern Physics, Univ. Sci. - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

Fast BPM DAQ System Using Windows Oscilloscope-based EPICS IOC M. Satoh, T. Suwada, K. Furukawa Accelerator Laboratory, KEK, Oho 1-1, Tsukuba, Ibaraki, 305-0801 Japan Jian Wang Department of Modern Physics, Univ. Sci.

Description:

Accelerator Laboratory, KEK, Oho 1-1, Tsukuba, Ibaraki, 305-0801 Japan. Jian Wang ... DAQ System has been developed by a fast digital oscilloscope (Tektronix DPO7104) ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 2
Provided by: ms1111
Category:

less

Transcript and Presenter's Notes

Title: Fast BPM DAQ System Using Windows Oscilloscope-based EPICS IOC M. Satoh, T. Suwada, K. Furukawa Accelerator Laboratory, KEK, Oho 1-1, Tsukuba, Ibaraki, 305-0801 Japan Jian Wang Department of Modern Physics, Univ. Sci.


1
Fast BPM DAQ System Using Windows
Oscilloscope-based EPICS IOCM. Satoh, T. Suwada,
K. FurukawaAccelerator Laboratory, KEK, Oho 1-1,
Tsukuba, Ibaraki, 305-0801 JapanJian Wang
Department of Modern Physics, Univ. Sci. Tech.
ChinaHefei 230026, ChinaT. Kudou, S.
KusanoMitsubishi Electric System Service Co.,
Ltd, Tsukuba, Japan
Result of Performance Test
Introduction
  • Waveform acquisition speed of a fast digital
    oscilloscope was tested.
  • (Remote/ Local test Software is running on host
    computer/ oscilloscope)
  • Both test results is enough for our purpose
    (50-Hz measurement).
  • DAQ Rate by EPICS-IOC is also enough fast.
  • KEK Linac is a injector
  • KEKB HER 8 Gev e-/ 3.5 Gev e
  • (Continuous injection Mode CIM)
  • (2) KEKB LER 3.5 GeV e (CIM)
  • (3) PF 2.5 Gev e- (once/day) gt Top-up
  • (4) PF-AR 3 GeV e- (twice/day)
  • For long-term stable beam operation
  • Needs Beam Orbit and Energy Control
  • We use about 100 of non-destructive BPMs for the
    orbit and energy feedback.
  • Fast Beam-Mode Switch
  • for KEKB CIM and PF Top-up
  • gt Needs Beam Position Measurement up to 50-Hz

Previous BPM DAQ System (1-Hz)
New BPM DAQ System (gt 50-Hz)
Replaced!
DAQ Performance by EPICS-IOC
Write a Comment
User Comments (0)
About PowerShow.com