Title V Modifications and Construction Permits N' LaDonna Driver HODGE DWYER ZEMAN Outside Counsel, - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Title V Modifications and Construction Permits N' LaDonna Driver HODGE DWYER ZEMAN Outside Counsel,

Description:

Title V Permit Revisions. Is a revision necessary? ... Facility must comply with PSD, NNSR, NSPS and HAP requirements. 11/7/09. 8 ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 14
Provided by: lma84
Category:

less

Transcript and Presenter's Notes

Title: Title V Modifications and Construction Permits N' LaDonna Driver HODGE DWYER ZEMAN Outside Counsel,


1
Title V Modifications and Construction Permits
N. LaDonna DriverHODGE DWYER ZEMANOutside
Counsel, Illinois Environmental Regulatory Group
2
Title V Permit Revisions
  • Is a revision necessary?
  • Not necessary for off-permit change or
    operational flexibility.

3
Off-Permit Changes and Operational Flexibility
  • Clean Air Act Section 502(b)(10),
  • 40 CFR 70.4(b) and 70.6(a)(9)
  • Applicability
  • Notice

4
Insignificant Activities
  • Illinois CAAPP Permit Condition 3.3
  • Applicability
  • Notice in limited circumstances

5
  • Where Title V permit revision is not required,
    changes can be operated expeditiously.
  • Is a construction permit required?

6
Construction Permit Requirements
  • Illinois Approach
  • Indiana Approach
  • Wisconsin Approach

7
Industry Proposal to Streamline Construction
Permitting in Illinois
  • Stair-Step Approach
  • Only for existing, permitted sources
  • Facility must comply with PSD, NNSR, NSPS and HAP
    requirements

8
Construction Permit Issued Incorporating Change
into Title V Permit
9
Administrative Amendment
  • 40 CFR 70.7(d)
  • Applicability
  • Change can be made upon filing

10
Illinois Approach for Using Administrative
Amendment to Incorporate Construction Permit
Requirements
  • Halted in 2001 - 66 Fed.Reg. 62946
  • Statutory or rule change to address procedural
    concerns?

11
Michigan Approach for Construction Permits and
Administrative Amendments
12
Minor Modification
  • 40 CFR 70.7(e)(2)
  • Applicability
  • Change can be made upon filing

13
Significant Modification
  • 40 CFR 70.7(e)(4)
  • Applicability
  • Change cannot be made until modification issued
Write a Comment
User Comments (0)
About PowerShow.com