Testing 4G Ahead of the Curve - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Testing 4G Ahead of the Curve

Description:

Expanded Services New Services Less Cost = More Revenue. The Next ... Rapid bug fix releases. This makes an already challenging problem quite frustrating ... – PowerPoint PPT presentation

Number of Views:136
Avg rating:3.0/5.0
Slides: 13
Provided by: aurka
Category:

less

Transcript and Presenter's Notes

Title: Testing 4G Ahead of the Curve


1
Testing 4G Ahead of the Curve
  • Automation, is it even an option?

2
4G Technical Benefits
Source Motorola
3
4G Technical Benefits
Source Motorola
4
4G Business Benefits
  • Expanded Services New Services Less Cost
  • More Revenue
  • The Next Chapter in the
  • War for subscribers

5
Companies already in Trials
6
4G is Complex
Source Kineto Wireless
7
4G is Another Layer
Source Alcatel-Lucent, Fibresystems.org
8
4G Complexity is Daunting
9
New Technology Equals Churn
  • New Devices / Standards - Daily
  • High Feature Velocity
  • Rapid bug fix releases

This makes an already challenging problem quite
frustrating
10
Test Area
Hardware and Interfaces
Software and Interfaces
  • Application Interactions
  • With and without network interaction)
  • Application running from Memory Card
  • Flight Mode
  • Concurrency e.g.
  • Mobile TV and incoming call
  • Write SMS and incoming call
  • Receive SMS/MMS during Call
  • Receive call while any of the applications is
    running
  • Video Conference and MMS
  • Streaming service and incoming/outgoing call
  • Upload data and and incoming/outgoing call
  • ...
  • Formfactors / Design
  • FPGA
  • Processors
  • Display
  • Keypad
  • Touchscreen
  • Camera
  • Microphone
  • Battery and Charger
  • Data Cables (Video, USB)
  • Headset
  • Headset Bluetooth
  • Lamp
  • Storage
  • Data Card (removable)
  • Radio Interface (RF)
  • physics control
  • En-/Decoding
  • Throughput
  • IR
  • Bluetooth
  • WiFi
  • FM Radio
  • GPS
  • Additional keys for e.g.
  • Loudness
  • Camera
  • Switch on/off
  • Sensors (if applicable)
  • Applications without network interaction
  • Music
  • Gaming
  • Java
  • Phonebook
  • Calendar
  • Clock / Alarm / Worldclock
  • Editor
  • Document viewer
  • Caculator
  • Currency converter
  • GPS
  • Radio FM
  • Layer 2/3 Protocol Testing (Network Signaling)
  • GSM/GPRS/EDGE
  • UMTS/HSPA
  • LTE (example follows)
  • Module Testing
  • HW/SW Integration
  • System Integration
  • 2G/3G Mobility
  • IntraRAT-Handover
  • InterRAT-Handover
  • Protocol Conformance Testing ( -gtGCF)
  • Services e.g.
  • Supported Bearers
  • SIP / IMS applications (as VoIP !!)
  • MBMS (as Mobile TV)
  • Different Qos/QCI (QoS class Identifier in LTE)
  • Bearers in parallel
  • Supplementary services (CLIP/CLIR...)
  • Location Based Services
  • Throughput measurements
  • Performace Testing
  • IODT
  • IOT
  • Drive / Field tests
  • Type Approval
  • Platform Capabilities
  • Operating System (S60, Windows Mobile etc)
  • Platform SDK
  • Security
  • Audio
  • Quality
  • Codecs
  • Voice recording
  • Speech recognition (Voice dialling)
  • Video
  • Quality
  • Codecs
  • Video recording
  • Content and File Management
  • DRM
  • File Manager
  • Data transfer via BT, IR, USB
  • Graphics
  • Applications with network interaction
  • Mobile TV
  • SMS
  • MMS
  • Download, upload files, pictures, videos
  • Interactive gaming
  • Calendar synchronisation
  • Email
  • Push to talk
  • Web browsing
  • WAP
  • Call Register (in / out / missed)
  • VoIP
  • IPv6

11
Testing Ahead of 4G
  • 4G is another order magnitude on top of the
    existing infrastructure
  • Profitability and company viability on the line.
  • Unbelievable Technology Churn
  • Less ability to test manually
  • Script based testing is failing

12
Will Your 4G be on Time?
  • Can you take a feature test and get it into
    regression before you release the product or
    service?
  • Can you run a full regression suite on a new
    service, new device feature, or a device software
    update in less than a week? In two days?
  • No? Better hope your competitor cant
Write a Comment
User Comments (0)
About PowerShow.com