CPDLC in Air Europa - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

CPDLC in Air Europa

Description:

Processed by: Helicon Filter;NIKON CORPORATIONNIKON D70 ... rdf:li xml:lang='x-default' Processed by: Helicon Filter; /rdf:li /rdf:Alt /dc:description ... – PowerPoint PPT presentation

Number of Views:424
Avg rating:3.0/5.0
Slides: 20
Provided by: euroco
Category:
Tags: cpdlc | air | europa | helicon

less

Transcript and Presenter's Notes

Title: CPDLC in Air Europa


1
CPDLC in Air Europa
  • Link 2000 Workshop
  • Brussels
  • 15-16 February 2005

2
Agenda
  • Brief overview of our company.
  • Reasons to become a Link2000 Pioneer Airline.
  • Our commitment with Link2000.
  • Initial steps. Activities carried out. Equipment
    Planning.
  • Certification First CPDLC trials.
  • Next steps.
  • Data link messages.

3
Brief overview of our Company...
  • Founded in 1986
  • Headquarters in Palma de Mallorca
  • Current fleet 32 aircraft
  • Type of Operation 80 scheduled 20 charter
    (approx.)
  • Routes Domestic, European and Transoceanic
    destinations
  • Code-share agreements with Aeropostal, Air
    France, Air Luxor, Alitalia, Continental, KLM,
    Malev, Southern Winds, Tunisair and Cubana.
  • Direct Staff 2.580 employees
  • Flight Hours 124.363
  • Total Pax 7.654.238
  • Nº Flights 58.253 (Year 2004)

4
Current Fleet of Air Europa
B737-400 2 units B737-800 25 units
B767-300 5 units
Total 32 aircraft
5
Reasons to become a Pioneer Airline
Cost Benefit Analysis
Jan04 Air Europa becomes Link2000 Pioneer
Airline
6
Our commitment with Link2000 Programme
  • Equipment for 19 aircraft
  • At least 10 A/C by the end of 2005 and
  • Another 9 A/C by the end of 2006.
  • Certification and start of operations at
    Maastricht UAC on or before Mar05.

7
Initial Steps
  • Internal working group to handle all data link
    activities.
  • Preparation of a potential calendar for aircraft
    equipment.
  • Contacts with Communications Service Providers.
  • Contacts with Avionics Manufacturers.
  • Informative meetings with the Spanish DGAC and
    AENA.
  • Change of Common Display System for all
    B737-800s.

8
Common Display System PFD/ND configuration
9
HMI requirement dot ATC
10
Activities carried out
  • Deliveries of 4 new B737-800 from Boeing
    (Oct-Nov04).
  • Certification of the first aircraft (22-Sep-04)
  • Decisions taken
  • Communications Service Provider SITA
  • Avionics Provider Rockwell Collins to forward
    fit new B737-800 and retrofit of existing
    aircraft.
  • Preparation of ground systems to accommodate new
    Data Link system. Interfaces with existing
    systems.
  • Training Course for flight crews due to the new
    PFD/ND configuration, including flight simulator
    and familiarisation flights.

11
VDL2/ATN equipment planning
  • 2004 4 new B737-800 (forward fit). In service ?
  • 2005 4 new B737-800 (forward fit)
  • 6 existing B737-800 (retrofit)
  • 2006 5 new B737-800 (forward fit)
  • 2007-2009 4 new B737-800 (forward fit)
  • 2010 delivery of 10 new Airbus 350 (with
    FANS-B)

12
Certification EC-JAP first Boeing aircraft VDL
M2 forward fitted Date of Certification 21
September 2004
13
First CPDLC Trials
  • Delivery Flights
  • EC-JAP 5 October
  • EC-JBJ 4 November
  • Route Seattle Boeing Field - Gander/Goose Bay -
    Palma
  • EC-JBK 18 November
  • EC-JBL 24 November

14
Next steps
  • Carry out more CPDLC trials with Eurocontrol.
  • Achieve the operational approval from the Spanish
    DGAC
  • Revision of Ops Manual introducing CPDLC
    procedures
  • Training programme for flight crews about CPDLC.
  • Start CPDLC operations with Maastricht (March05).

15
AOC messages
  • AOC messages add new capabilities.
  • Change of company procedures.
  • Operational improvements with the use of AOC
    messages.

16
CPDLC messages examples (I)
Video 1
17
CPDLC messages examples (II)
Video 2
18
Comments from Flight Crews ... ... after CPDLC
experiences
  • Very good response after the CPDLC trials.
  • Increased use of the data link system for AOC
    applications.
  • In general, good attitude towards the system.
  • Wishing to fly over MUAC as soon as possible to
    carry out CPDLC.

19
Thank you Air Europa Centro Empresarial
Gobalia. Llucmajor 07620. Balearic Islands.
Spain T 34 971 178133 F 34 971 178097 E
jrossello_at_air-europa.com
Write a Comment
User Comments (0)
About PowerShow.com