Title: City of Delaware Public Utilities Department


1
City of Delaware Public Utilities Department
  • Executive Summary 3rd Quarter 2006

Viewable at www.delawareohio.net/departments/Publ
ic20Utilities
2
Project Update
3
Project Update Cont. 2
4
Wastewater Treatment OM
  • Wastewater Treated 5.15 MGD Influent Average
  • Violations in 3rd Quarter 0
  • Maintenance Hours in 3rd Quarter 800 hours
  • Plant Lift Station Maintenance
  • Attended CMMS workshop
  • Restoration of asphalt at the UOWRC (basecoat)
  • UOWRC solids handling meeting
  • Shut down plant for Installation of new Return
    Activated sludge line discharge option
  • Fabrication of valve turning tool adaptor
  • Weekly Lift station rounds
  • Monthly Preventative maintenance
  • Cleaned air filters on VFDs MCCs
  • Adjusted belts on New Grit pumps
  • Calibration of Secondary Odor Control sensors
  • Pulled and cleaned pumps from Sunny View Lift
    Station
  • Tested New transfer switch for Phase Failure
  • Cleaned primary skimming wet well and removed
    debris from mixing impeller
  • Repaired hydraulic pallet jack.
  • Performed all weekly and monthly preventative
    maintenance
  • Training in 3rd Quarter
  • 7/6/06             Primary Odor Control
    Training
  • 7/11/06           HMI Screen Training
  • 7/19/06           Instrumentation PLC Panel
    Training
  • 7/20/06           PLC Training    
  • 8/3/06             Lakeside septage equipment
    training
  • 8/31/06           Plant Process Training
  • 9/28/06 Belt Filter Press Operations

5
Wastewater Budget Graphs
6
Wastewater NPDES Permit
7
Collection Sys. Div. OM
  • New Sewer Permits in 3rd Quarter - 40
  • Amount of Sewer TVed in 3rd Quarter 14,774 ft.
  • Amount of Root Treatment Performed 7810 ft.
  • Lift Station Overflows in 3rd Quarter - 0
  • Sanitary Sewer Backups in 3rd Quarter 0
  • Days Since Last Main Blockage 70
  • Maintenance/Repairs
  • Installed blacktop David St., Liberty Rd.,
    Sandusky St., Liberty St., Forest Ave., E.
    Central Ave., London Rd., E. William.
  • June 2nd - Flooding issues all over.
  • 147 Lake St. Installed 36 storm sewer pipe 20
    ft.
  • Pumped Curve Road Landfill.
  • Updated storm sewer maps.
  • Hauled several loads of leachate from Curve Road
    Landfill.
  • Checked storm water outfalls.
  • Check lift stations weekly.
  • Cleaned catch basin tops city wide.
  • Cleaned backyard at WWTP.
  • 170 Somerset checked sinkhole TVed sewer
    lowered catch basin.

8
Water Plant Maintenance
  • Water Pumped 3.65 MGD Average for 3rd Quarter
  • EPA Violations in 3rd Quarter 0
  • Maintenance Hours in 3rd Quarter 560 Hrs.
  • 3rd Quarter Activities
  • Sent out backflow test notices for July, August,
    Sept.
  • CMMS Training
  • Repaired well flow display hit by lightning
  • Repaired 6 filter flow meter
  • Rebuild H.S. Pumps
  • CBI Meeting on tank paint issue
  • Reviewed draft water master plan
  • Surveyed PPG Industries Luvada Industries for
    backflow
  • Extremity flushing of hydrants
  • Two shutoffs for failure to submit backflow
    results
  • Repaired raw flow valve stuck closed due to a
    relay sticking replaced the relay
  • Comments to Director on new proposed EPA Rules
  • Electricians working at water plant on wiring for
    new tank radio signal
  • Cleaned all four flocculators
  • Repaired raw flow valve stuck closed due to a
    relay sticking replaced the relay
  • Repaired check valve on return wash sludge pump
  • Repaired slaker motor pulley
  • Drained, cleaned inspected all 4 settling basins
  • Drained, cleaned, inspected CO2 basin
  • Drained, cleaned, inspected Filter Wash-water
    basin
  • Monthly EPA MOR NPDES reports sent to EPA
  • Sent out several letters to customers about the
    need to install backflow devices
  • Switched to East lagoon as west one is full
  • Repaired faulty sludge tube
  • Surveyed County Fairgrounds for concession
    backflow issues
  • Pulled the motor out of 1 well for repair
  • Booth at fairgrounds on Jug Day
  • Gave tour of WTP to HR Dept.
  • Hauled 25 loads of stone to Penry Wellfield for
    driveway
  • Worked on Operational Budget for WTP

9
Water Treatment Plant
10
Water Treatment Plant
11
Distribution Sys. Division O M
  • New Water Permits 27
  • OUPS Locates 366 _at_ 210 reg. hrs 7 OT hrs
  • Meters Read 16,631 _at_ 405 reg. hrs 2 OT hrs
  • Accounts Serviced 2620 _at_ 837 reg. hrs. 27.5
    OT hrs.
  • New Meter Installations 88
  • Water Service Shutoffs 3743 mailed
  • Meter Pit Installations 49
  • Service Line Maintenance Events 2
  • Hydrants Repaired / Replaced 13
  • Main Valves Repaired / Replaced 25
  • Main Line Repair Events 3
  • Havens Rd. 6-inch
  • Colfret Ct. 6-inch
  • 376 Curtis St. 12-inch
  • Unaccounted for Water Running Avg. 4. 23 for
    the 3rd Quarter
  • Large Meters Tested 10
  • Midwest Acoustabfiber 1 ea 3
  • Western Kraft 1 ea 2
  • Delaware JVS -1 ea 4
  • Large Meter Change Outs 0
  • Henkel Surface Tech. 1 ea 3
  • Backflow Program
  • Luvata Industries
  • PPG Industries
  • Buckeye Valley School
  • Delaware State Park
  • JEGs
  • Powell Structural Systems
  • Henderson Trucking
  • Wal-Mart
  • Kroger Dist. Center
  • Delaware Dam USACE
  • Office City
  • Time Warner
  • Toolmatics
  • Carr Supply
  • Serve Pro
  • Harris Instruments

12
FTE Efficiency
13
City of Delaware Public Utilities Department
Executive Summary 3rd Quarter 2006