Pool Construction Process PowerPoint PPT Presentation

presentation player overlay
About This Presentation
Transcript and Presenter's Notes

Title: Pool Construction Process


1
POOL CONSTRUCTION PROCESS
2
DESIGN AND PLANNING
This initial stage involves working with a pool
designer or architect to determine the pool's
size, shape, style, and features based on your
preferences and the available space.
3
OBTAINING PERMITS
Before construction can begin, you will typically
need to obtain the necessary permits and
approvals from the local authorities.
4
EXCAVATION
Once the necessary permits are obtained, the
construction process begins with excavation.
5
FORMING AND FRAMING
After excavation, the pool's shape and structure
are formed using various materials such as steel
rebar and wooden or metal forms.
6
PLUMBING AND ELECTRICAL
This initial stage involves working with a pool
designer or architect to determine the pool's
size, shape, style, and features based on your
preferences and the available space.
7
TILE AND COPING
Once the pool shell has cured, tile or other
finishing materials are applied to the interior
surface of the pool.
8
FILTRATION AND EQUIPMENT INSTALLATION
The necessary pool equipment, such as the
filtration system, pump, heater, and any
additional features like waterfalls or fountains,
are installed and connected to the plumbing and
electrical systems.
9
FILLING AND TESTING
After all the construction work is completed, the
pool is filled with water and the systems are
tested to ensure they are functioning properly.
10
SAFETY MEASURES
Lastly, it is important to address safety
measures to prevent accidents and ensure
compliance with local regulations.
11
THANK YOU!
Write a Comment
User Comments (0)
About PowerShow.com