www.cities21.org advanced feeder TOD - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

www.cities21.org advanced feeder TOD

Description:

1.2 sq mi transit village (not just .25 sq mi) Remove 8,000 cars ... IKEA: ?Delivery service?, Sweden big on PRT. Office parking spaces per 1,000 feet = 2? ... – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 15
Provided by: pinnacle7
Learn more at: http://www.cities21.org
Category:
Tags: tod | advanced | cities21 | feeder | ikea | org | www

less

Transcript and Presenter's Notes

Title: www.cities21.org advanced feeder TOD


1
www.cities21.org - advanced feeder TOD
  • Steve Raney, UC Berkeley
  • Project focused.

2
EGR-PRT Benefits
  • 1.2 sq mi transit village (not just .25 sq mi)
  • Remove 8,000 cars/day
  • Serve 28,000 trips/day
  • Increase retail sales 35
  • Increase real estate value
  • Allow redevelopment, reclaim parking
  • Reduce employee turnover costs
  • Self-funding (OM capital)
  • Publicity city of the future
  • No sacrifice (a la VP Cheneys NRG policy).

3
Call to Action research
  • Cant fund an MIS
  • Form ad-hoc committee
  • Formal approval to work on this
  • Start checkerboard commute origination study
  • Assists current TDM! C21 will fund.
  • Oct. research proposal for TMA/City
  • Cities21, Emeryville, U.C. Berkeley, experts
    ridership study, route design, architectural
    renderings, economics, simulation, environmental
    impact, etc.
  • Small Emeryville/TMA MTC planning , Envt.
    Foundation , academic research , Cities21

4
PRT
  • Video
  • Capacity 4,000 hr (theoretical is 7,200 4)
  • Non-stop pt to pt service (intermediate station
    bypass)
  • No waiting
  • Light weight reduces cost
  • Right of way 22 diameter piers

5
PRT (2)
  • Energy equivalent of 1,000 office workers
  • 80, 880, 580 rolling brownout
  • Visual mitigation
  • Noise
  • 10 x 40 stop platforms, 75 accel/decel
  • Novelty (SF trolley replaced bus ridership up
    3X)

6
Feeder / capillary grid is complimentary
  • Mode share for quality, accessible transit in
    Chicago is greater than auto share
  • Faster than car for many multimodal commutes.
  • Carpool formation 40X more efficient
  • No stranding

7
Why Emeryville?
  • Stanford Research Park proposal Jeff Tumlin
    (Nelson Nygaard) Wendy
  • Emeryville retail, housing, office mix. Trip
    profile. Density. BART capacity profile. San
    Pablo bus preference.
  • EGR. Full buses. TMA funding. Wendy (people
    skills, customer focus)
  • APM 2001 SF
  • 80, 880, 580 rolling brown out

8
Implementation
  • 8,000 commuters 3K BART/Amtrack, 2K bus, 2K HOV,
    1K bike/ped.
  • 6,000 mid-day trip pairs (coming/going matched)
  • 10MM per mile, 6.5 miles. Includes 18 250K
    stops (75 accel) a) ground level (10 grade),
    b) adjacent to building w/ 40 cut out, c) 10 x
    40 platform, spiral staircase, ADA elevator
  • Upgrades to standard package funded privately.
  • 7th aquatic park corridor bike lockers at 65
    Shellmound (Bay). Attract casual bikers.

9
Implementation (2)
  • Rationalize AC Transit routes (shorten, increase
    frequency). Provide housing subsidies for
    drivers!
  • San Pablo preference bus (Camsys) stops
  • High touch proactive commute consultation
    (RIDES-like), checkerboard volunteers
  • IKEA ?Delivery service?, Sweden big on PRT
  • Office parking spaces per 1,000 feet 2?
  • Double dip parking work sleep
  • Hide utilities?

10
Finance
  • 65MM capital cost
  • tear down insurance
  • 3MM OM (lots of marketing RIDES transit
    info)
  • 0.50 fare pp. 365 14K 5.1MM/yr
  • PBID 2.5MM/yr
  • 35 retail increase assessment
  • Ads 3MM/yr
  • Fiber/broadband cable 300K/yr
  • 0.50 per day parking
  • Capital
  • 25 via Mineta, 25 via state, 25 equity

11
Benefits EGR issues solved
  • Trip time savings 25 minutes in extreme cases
  • Powell St. Plaza driving/parking experience
  • Frequency, reliability, wait time, 24x7 service
  • Congestion, construction, accidents, Amtrak
  • EGR route design optimization
  • Bus fleet aging
  • Bus driver shortage, split shift problem
  • Missed connections
  • More mid-day trips
  • free time valued more than commute time

12
Schedule
  • July approval to work on proposal
  • Oct 2001 proposal to TMA
  • 12 months of research
  • Various conference presentations
  • Oct 2002 present results, take a PRT test ride,
    fund mini investment study,
  • Q1 2003 Public outreach, evangelize fund 1MM
    PRT demonstration loop
  • Q2 2003 build PRT demo loop
  • Nov 2003 ballot measure for full EGR-PRT

13
Call to Action
  • Ad-hoc committee, OK to work
  • Explain Emeryville to C21.

14
The Commuter
  • Techsters are hardest to switch
  • To replace auto, need to match it
  • Convenience, flexibility, comfort, privacy
  • Transit transfers are problematic
  • Non-work, mid-day trips
  • Sick child, off-site business meeting
  • Communication with office
  • Psychological baggage
Write a Comment
User Comments (0)
About PowerShow.com