1Review
2The contract administrator should provide
________ at formal closure of the project
- Formal notice of project completion to the
contractor - Formal notice to Sr Management
- Letters of recommendation
- Formal notice of acceptance to the contractor
3Project Quality Management
- Is the responsibility of the Quality Assurance
department. - Must address both the management of the project
and the product of the project. - Is only a concern for large complex projects.
- Requires significant dedicated resources.
4Analogous Estimating is most accurate when
- Previous projects are similar in fact not just
appearance - There is a relationship between cost and known
parameters - Work Items are small
- When used with parametric modelling
5The main output of Plan Purchases and
Acquisitions in Procurement Management is
- RFP
- WBS
- Scope Statement
- Procurement Management Plan
6A control chart for the process of filling
laundry soap boxes indicates that all of the data
points fall within the three sigma upper and
lower control limits of plus 50 and minus 50
grams. However, several points are outside the
product specification of a fill to 500 grams plus
or minus 5. What action, if any, does this
indicate?
- No action is required
- The customer should be requested to change the
specification to plus or minus 10. - More data points should be assessed.
- An alternative process with less variability may
be required.
7Companies may outsource products due to
- Lack of resources
- Time
- Expertise
- All of the above
8There are 3 tools and techniques for Plan
Purchases and Acquisitions. Which is not one of
them -
- Expert Judgment
- Make or Buy Analysis
- Contract Types
- Cost Analysis
9Analogous estimates are considered to be
- Most accurate of the types
- Inappropriate for most projects
- Least accurate
- Bottom Up estimates
10Which of the following charts is based on the
80/20 rule
- The 50/50 rule
- A fishbone chart
- A control chart
- A Pareto chart
11Incentive Fee Contracts are measured
- Subjectively
- Objectively
- Too broad criteria
- All of the above
12A control chart for a majpr project process
shows that 7 consecutive data points of the 9
sample averages are trending downwards within
the control limits. What is indicated?
- The process average is moving to the lower values
and needs to be corrected - The process is showing an abnormal trend and
should be investigated - No action is required, points are within range
- It is out of control
13Two milestones must precede the delivery date
and should be listed in the schedule
- Sellers lead-time and award date
- Contract delivery and negative float
- Schedule backward calculations and award
- None of the above
14Which is not a tool and technique of Quality
Planning?
- Cost Benefit Analysis
- Pareto Charts
- Design of Experiments
- Cost of Quality
15Poor contract selection is the ______ responsibili
ty
- Sellers
- Buyers
- Customers
- None of the above
16FFP Contracts should be used when
- Changes are anticipated but requirements are well
defined - Minimal scope detail is available
- Item is well defined and minimal change is
anticipated - Buyer and Seller can share in savings based on
predetermined
17A run occurs when
- Successive points line up on one side of the
process average - Data points run past the UCL or LCL limits
- Continued rise or fall exists
- There is a controlled start and stop
18Crosby is known for what
- PDCA
- Quality is free
- Fitness for use
- Fitness for Purpose
19What contract type contains both aspects of Cost
Reimbursable and Fixed Price Types
- FPIF
- CPPC
- CPFF CPF
- Time Materials
20Causes of variance that are sporadic are defined
as
- Random Causes
- Common Causes
- Special Causes
- Maintenance Causes
21What is not a true statement about benchmarking?
- It is used for process improvement
- Can be done within or external to the
organization - Can disrupt a project temporarily
- It is a useful tool for identifying effects that
different elements can have on a project
22Pareto diagrams, cause and effect diagrams,
flowcharts and trend analysis are all part of
- Control
- Assurance
- Planning
- Verification
23Which of the following is an example of the cost
of conformance to quality
- Support Calls
- Training
- Scrap
- Warranty Costs
24What is not a estimating method discussed?
- Analogous Estimating
- Bottom Up
- Parametric
- Para modeling
25Disadvantage to Bottom Up Estimating
- Can be vague
- Can be time consuming
- Considered to be the least accurate
- Difficult to assign resources to work packages
26The following is not a tool and technique for
Plan Purchases and Acquisitions as defined by
PMBOK
- Standard Forms
- Make or Buy Analysis
- Expert Judgment
- Contract Types
27EV is
- Actual Costs
- Accomplished Work
- Evident Variables
- BCWS
28Changes are managed by
- Adhoc requests analyzed by the PM
- Formal Change Control Processes
- Champion/Sponsor guidelines
- Team input on feasibility at weekly intervals
29Claims are settled in many ways, the following is
not one of them
- Negotiation
- Mediation
- Blackmail
- Litigation
30In cases of breach, the seller
- Is not responsible
- Will be reimbursed for expenses incurred to date
- May be unable to recover costs incurred
- May still be entitled to a profit
31How many Quality Management Processes are there?
32Perform Quality Assurance is executed within the
______process
- Initiate
- Closing
- Controlling
- Executing
332 key words of quality
- Satisfy, Deliver
- Customer, Satisfy
- Satisfy, Needs
- Needs, Satisfaction
34Design of Experiments is a tool and technique
within
- Quality Planning
- Quality Control
- Plan Purchases and Acquisitions
- None of the above
35What is not true statement about bench marking
- It is used for process improvement and product
improvement - Can be done within or external to the
organization - Can disrupt a project temporarily
- Is a useful tool for identifying effects that
different elements can have on a project
36Which is not one of the ilities?
- Producibility
- Measureability
- Reliability
- Operability
37Precisely what the customer wanted is a goal of
what term
- Customer Satisfaction
- Fitness for use
- Fitness for purpose
- Conformance to the requirements
38There are 4 general areas of focus within the
Deming Institute
- Network Support, Development and Outreach,
Education and Research - Development and Outreach, Research, Testing, ISO
Certification, and Educational Materials - Research, Support of Educational Materials,
Continuous Improvement and Testing - PDCA
39The purpose of a procurement audit is to
- Evaluate suppliers performance and the
procurement process - To evaluate the effectiveness of the procurement
process - To evaluate suppliers performance only
- To determine successes and failures
40Deming originally went to Japan to lecture
quality concepts in
41The estimating method that sets parameters Based
on historical performance by industry is
- Parametric Modeling
- Analogy
- Firm Proposals from sellers
- Bottom up estimating
42Juran has
- 10 Steps to Quality Improvement
- 14 points of Management
- 10 Steps to Management
- 14 points to Quality Improvement
43Which is not an activity during the conceptual
phase of quality planning
- Project Objectives
- Project Scope
- Schedule Realism
- Grade of Materials
44If the mean or expected value is 55 days and
standard deviation is 5 days, you can be
- 68 confident that the work will be completed
anywhere from 45 to 50 days. - 95 confident that the work will be completed
anywhere from 50 to 60 days. - 99 confident that the work will be completed
anywhere from 45 to 65 days. - 68 confident that the work will be completed
anywhere from 50 to 60 days.
45Weaknesses found result from a combination of
what in the procurement process
- Price vs grade
- Follow up and delays
- Order and Lead time
- All of the above
46Within your textbook they refer to the actual
cost of planning towards Prevention being 10
today they state it should be
47Appraisal costs are the costs associated with
- The evaluation of products or processes
- The failure of processes to make an acceptable
product - Determination by the customer that requirements
have not been met - Up front costs toward the satisfaction of
customer requirements
48Make or Buy decisions outline what work will be
completed outside the company under legal
relationships called
- Contracts
- SOWs
- Partnerships
- Organizational Process Assets
49Quality Control systems
- Select what to control
- Compare actuals to quality standards
- Planned for quality will be met
- AB
50Poorly defined projects will result in projects
taking on additional work. This is known as
- Scope Deviation
- Scope Creep
- Crashing Scope
- Scope Increase
51A graphic display of results over time is a
- Statistical Sampling
- Flowchart
- Cause and effect diagram
- Control Chart
52Fishbone diagrams are also known as
- Flowcharts
- Cause and effect Diagrams
- Pareto Charts
- Skeleton Diagrams
53Within Plan Purchases and Acquisitions, you
determine
- Organizational Assets, Effects on Project Cost,
and When to Purchase - What to purchase, when to purchase and how much
- Advertising necessary, Qualified sellers,
Schedule forward and negative float - How to obtain viable proposals from perspective
sellers
54According to the Normal Curve, you can be
- 99.75 sure your process will be 3/-3 of the
mean - 99.73 sure your process will be 3/-3 of the
mean - 68.26 sure your process will be 3/-3 of the
mean - 95.46 sure your process will be 3/-3 of the
mean
55Across the organization, who is responsible for
Quality
- PM
- Functional Manager
- Upper Management
- Individuals on task
56Fixed Price/Lump Sum contracts include
- FFP FPIF Contracts
- FFP FPPC contracts
- FFP CPFF Contracts
- FPIF Time and Materials Contracts
57A control chart for a major project process shows
that seven consecutive data points of the nine
sample averages are trending downward within the
control limits. What is indicated by this
phenomenon?
- The process average is moving to the lower values
and needs to be corrected.Functional Manager - The process is showing an abnormal trend and
should be investigated. - No action is required because the points are
still within the control limits. - The process is out of control and should be
investigated.
58Diagrams that are used to determine the
relationship between two or more pieces of
corresponding data are called
- Cause-an-effect diagrams.
- Scatter diagrams.
- Pareto diagrams.
- Statistical sampling.
59A structured means to analyze the inputs to a
process for identification of the causes of
errors is called
- A cause-an-effect diagram.
- Pareto diagram.
- Design of experiments.
- Statistical process control.
60The objective of your project is to deliver a
basic software product. The programmer on the
team is more interested in adding features than
eliminating any bugs. This team member has lost
sight of the
- Project objectives.
- Project budget for programming.
- Project schedule requirements.
- Difference between grade and quality.
61The principal use of a Pareto diagram is to
- Focus attention on the vital few problems/issues.
- Improve quality control.
- Help predict future problems.
- Display 80 of all causes are attributable to 20
of all errors.
62The straight line running from the left to right
in the middle of a control chart is called the
- Mean.
- Specification limit.
- Data point.
- Upper and lower control limit.
63Quality is
- Inspected in not planned in
- Planned in not inspected in
- the responsibility of the Sponsor
- Planned and Inspected in
64A control chart shows that the last eight frames
produced were all slightly more than the average
weight you have been monitoring for the last 6
months. You know you need to action this because
the control chart violates the
- Rule of seven.
- Consecutive rule.
- Standard deviation rule.
- 3-sigma rule.
65Which of the following is considered a cost of
quality prevention?
- Evaluation of customer complaints.
- Rework costs.
- Collecting data for use in process improvement
efforts. - Mass inspection.
66Submitting issues to an impartial 3d part for
resolution is
- Alternative dispute resolution
- Problem processing
- Steering resolution
- Mediation litigation
67You have been informed your vendor has changed,
what is the first thing you should do
- Have the core team on site so you can introduce
the new vendor to them - Establish yourself as the authority in charge
- Arrange for a tour of the site
- Review the contract details with the vendor to
ensure common understanding
68Which of the following is a definition of
Liquidated damages
- Damages intended to compensate the injured party
- Damages intended to punish the wrong doer
- Damages where the amount is specified in the
contract - Damages which are a consequence of your actions
69Key element of a contract
- Offer
- Acceptance
- Performance
- Exchange
70Which is not an input to Perform Quality
Assurance?
- Quality Management Plan
- Approved Change Requests
- Quality Control Measurements
- Recommended Corrective Actions
71Which is not an output from Perform Quality
Control?
- Validated Defect Repair
- Quality Baseline updates
- Recommended corrective actions
- Quality Management Plan