Title: CHAPTER 7 POST FLOOD RESPONSIBILITIES


1
CHAPTER 7POST FLOOD RESPONSIBILITIES
2
Substantial Damage and Post-Flood Requirements
(The 50 rule)
3
Substantial Damage and Post-Flood Requirements
(The 50 rule)
  • Substantial Damage
  • Damage of any origin whereby the cost of
    restoring the structure to its pre-damage
    condition would equal or exceed 50 of the market
    value of the structure before the damage occurred.

4
Substantial Damage and Post-Flood Requirements
(The 50 rule)
  • If a Pre-FIRM building is substantially damaged
    and the lowest floor is below the BFE, what is
    required?

The existing building must be elevated so that
the lowest floor (including basement) is elevated
to or above the BFE.
5
Substantial Damage and Post-Flood Requirements
(The 50 rule)
Determining Building Value
  • Building value is the market value of the
    building prior to the damage or improvement.
  • You can require a professional appraisal.
  • Tax assessor records can be used as a screening
    tool only.
  • Apply your approach consistently!

6
Substantial Damage and Post-Flood Requirements
(The 50 rule)
  • The formula
  • Cost of damage gt 50
    Market value of the building
  • _____________
  • 140,000 house

75,000 project 54
7
Substantial Damage and Post-Flood Requirements
(The 50 rule)
Cumulative Substantial damage tracking (one
example) 20,000 / 100,000 20 damage in
1990 10,000 / 120,000 8 damage in
1991 28,600 / 130,000 22 damage in 1999 50
cumulative damage Building must be brought up to
flood code!
8
(No Transcript)
9
Substantial Damage and Post-Flood Requirements
(The 50 rule)
  • Contact the State or FEMA for assistance and
    guidance
  • Identify and document flooded structures
  • Complete damage Assessments
  • Post information for the public on permit
    requirements.
  • Implement a permit application procedure
  • Provide technical information
  • Mitigate where possible

10
State and FEMAAssistance Substantial Damage
Workshops and training on the RSDE
Substantial Damage and Post-Flood Requirements
(The 50 rule)
11
Substantial Damage and Post-Flood Requirements
(The 50 rule)
Inspections During FloodCrest
12
Substantial Damage and Post-Flood Requirements
(The 50 rule)
  • Document high water marks
  • Digital photos
  • Mark locations on map
  • Post notices on properties
  • Follow up letters

13
Permit notices placed on all flooded buildings
Substantial Damage and Post-Flood Requirements
(The 50 rule)
14
Class One 100 damaged
(Substantial Damage and Post-Flood Requirements
(The 50 rule)
15
Class Two40 60 Damaged
Substantial Damage and Post-Flood Requirements
(The 50 rule)
16
RED TAG!
Substantial Damage and Post-Flood Requirements
(The 50 rule)
17
Substantial Damage and Post-Flood Requirements
(The 50 rule)
  • Perfect time to reconstruct the RIGHT WAY!
  • Available mitigation funds???
  • Flood Insurance help???
  • Obtain state or cooperative assistance
  • Legal help
  • ALL RED TAGGED (substantially damaged) buildings
    must be brought into compliance regardless of
    insurance or mitigation availability.