BUILDING 500
  • Renovation Project
  • 2004

2
All Rooms and Hallways
  • Replace all ceiling tiles-OR replace all stain
    and/or broken tiles in all rooms and hallways
  • All rooms and hallways painted
  • All vinyl wall coverings removed and/or replaced
  • Clean and/or replace all air duct grills
  • All room should have keyless card system for
    entry
  • Replace or refinish all wood doors in building
  • Replace all trash containers in all rooms and
    offices
  • All wooden cabinets in building should be keyed
    the same.
  • In all room with sound tiles on upper part of the
    wallremove and paint502, 503, 504, 505
  • Computers replaced in all classrooms, labs, and
    offices
  • Replace borders on walls in all rooms
  • Replace the two current water fountains with
    stainless steel refrigerated water fountainsmake
    sure the water feeder lines coming and going are
    clean and clear.

3
All Rooms and Hallways
  • All classroom instructor workstations have two
    monitors19 (except 506)
  • All classroom instructor workstations have
    connected VCR/DVD units that will connect to the
    projector
  • All classroom instructor workstations should be
    electriceasily adjusted up and down/higher
    chair/stool for instructor workstations for the
    adjustable tables
  • Directed lighting in computer classrooms
  • Addition of more poster/pictures in classrooms
  • Replace all hallway flooring
  • Signage for entire buildingsimilar to Bldg. 600
  • Ceiling auxiliary speaker system classrooms
  • Coordinate the heating/cooling systems so all
    room heat and cool properlycentrally control
  • Framed pictures/posters for all classrooms
  • Outside patio areaRoom 520 w/electrical and
    fencepossible soda machine placement

4
Building 500
5
Room 501
  • Computer Classroom

6
Room 501
  • Clean or replace carpet
  • Replace bulletin board by door
  • Replace vinyl wall coverings north, south, and
    east walls
  • Extend white board on north side to NW
    cornerremoving or covering current bulletin
    board
  • Replace white board on east side of room w/plain
    wall

7
Room 501
  • Refinish cabinetsre-key so they match all
    cabinets in Bldg. 500
  • Replace computers32instructor station requires
    2 monitors
  • Replace chairs3430 stations plus round table
    seating.
  • Repair or replace counter top in back of room
  • New instructor workstation moved from center to
    northwest side of roomapproximately 5 ft in
    front of whiteboard w/adjustable electric table
  • Power switch for lights by instructor workstation

8
Room 502
  • Computer Classroom / Lab

9
Room 502
  • Replace door between 502 and 503 with door w/out
    window and the ability to lock from both sides
  • New instructor workstation (electrically
    adjustable) w/ power for on off switching for
    lightslight bank assignment using current light
    switch by exit door on west side.
  • Replace all upper-portions of the walls that have
    acoustic tiles with plain painted walls.
  • Replace existing bulletin boards (2) on east
    wallone 4X8 ft and one 4X4 ft
  • Install new bulletin board on north wall by the
    entrance4X8 ft

10
Room 502
  • Replace counter top over cabinets on north wall
  • Replace tape cabinets
  • Refinish or replace wooden cabinets on north wall
  • New sink and new faucets
  • Remove vinyl wall paper
  • Two new clocksone centered on wall of north wall
    and one centered on wall of east wallremove old
    clock on north wall.

11
Room 502
  • Screens located on east wall removedtotal of 2
  • Remove wires on north and east wallscoming from
    ceiling.
  • Remove current file cabinets and replace
  • Replace computers41attendance, instructor w/2
    monitors, staff, and 38 student
  • Replace copier

12
Room 502
  • Replace small desk by entrance door with table
    (size 36 X 18 inches)
  • Remove wall phone plate located by exit doorwest
    wall
  • Replace shades on windows and outside door with
    vertical blinds/matching blinds for windows
    between classrooms.
  • Change light bank assignment using current light
    switch by exit door on west side.

13
Room 503
  • Computer Classroom

14
Room 503
  • Replace counter top over wooden cabinets on south
    sideconsistent with other rooms/labsNO orange
  • Refinish cabinets on south side
  • Remove front corner cabinetsnorth side
  • Second monitor for instructor workstation

15
Room 503
  • Re-carpet the entire room including entrance way.
  • All new chairs32
  • New (not replacement) 8-ft. bulletin board in
    front (north) on the east wall.
  • New bulletin board to replace hallway entrance
    board south wall
  • Instructor workstation should be electrically
    adjustable table

16
Room 504
  • Computer Classroom / Lab

17
Room 504
  • Install lab tech workstation similar to 509 or
    502 in north-west corner
  • Add bulletin board to north-west corner on west
    wall 4X6
  • Remove old file cabinet/book shelves
  • New counter top for wooden cupboardsnorth wall.
  • Refinish wooden cupboardsnorth wall
  • New chairs30

18
Room 504
  • Retain and refinish tall wooden cupboardsnorth
    wall
  • Remove vinyl wall coverings and paint
  • Replace log in (attendance) computer desk/cart
    w/cabinet
  • Replace computers3128 student, staff,
    instructor w/2 monitors, and attendance

19
Room 504
  • Replace door in the southwest corner with no
    window door
  • New podium area for instructor
  • Replace current blind on window on north wall
    with vertical blinds, also, match vertical blind
    on window on west wall facing Room 503
  • Replace all current bulletin boards

20
Room 505
  • Lecture Classroom

21
Room 505
  • Replace bulletin boards
  • The 8-ft. cabinet in the north-east corner
    remains but the cabinets on the east wall all
    should be removed including the counter top and
    cabinets below.
  • Install carpet
  • Seal and/or remove second door that currently
    opens into 507 hallway
  • Move electrical box into hallway

22
Room 505
  • New workstations
  • Trenching needed for electricity to instructor
    lecture area at front of room
  • Instructor workstation (electrically adjustable)
    w/ power for on off switching of room lights at
    east side of room
  • Lecture area at front of room w/electrically
    adjustable table
  • Electricity/power source network drop is needed
    for computers at each student workstation
  • New computers 47 46 student, instructor w/2
    monitors
  • Electric disable table

23
Room 506
  • Lecture Classroom

24
Room 506
  • Remove all wooden cabinets and counter space in
    back of roomnorth wall
  • Replace bulletin boards
  • Remove current instructor wooden workstation
    (work space) in front of room
  • Install instructor podium/lecture area in front
    middle of room

25
Room 506
  • Permanently block off doors to Room 516, 517 or
    replace doors with a wall.
  • Room 518 519 entrance remain
  • Extend whiteboard to the south east corner
  • Change/remove stairway to display windowentrance
    from hallway with new door

26
Room 506
  • Install instructor workstation in south east
    corner of the room w/ electric table, new
    computer, power, light switches to new instructor
    workstation
  • Trenching for electricity for instructor lecture
    adjustable table in middle of room and disable
    student workstation
  • Replace all student workstations

27
Room 507
  • Computer Lab

28
Room 507
  • Replace bulletin boards2 on west wall and 1 on
    north wall near door
  • Refinish and re-key wooden cabinets
  • Install bulletin board on north wall above techs
    workstation

29
Room 507
  • Replace log in (attendance) computer desk/cart
    w/cabinetclose to entrance on west wall
  • New chairs30
  • Replace computers3129 student, 1 eachstaff
    attendance

30
Room 508
  • Faculty Office

31
Room 508
  • Signage change to be Room 508
  • Workstation, file cabinet, bookcase for adjunct
    faculty on north side of room
  • Conference area/break roomcounter space,
    cabinets, refrigerator, microwave, table chairs
  • Relocate drops and electrical as necessary

32
Room 509
  • Administrative Assistant Office

33
Room 509
  • New computer
  • Carpet cleaned or replaced

34
Room 510
  • Division Dean Office

35
Room 510
  • New workstation
  • New computer
  • Carpet cleaned or replaced
  • Install window

36
Room 513
  • Faculty Office

37
Room 513
  • Windows replaced with wallssimilar to other
    instructor offices
  • Upgrade as other instructor officessee next
    section

38
Rooms 514-524
  • Faculty Offices

39
Faculty Offices
  • New ergonomic workstation
  • New chair
  • New bookshelf
  • New filing cabinet
  • New computer

40
Room 530
  • Server Room

41
Room 530
  • Redesign organize rack space
  • Organize cables neatly
  • Replace 4 servers w/new rackmount servers with
    back-up tape unit and UPS backup

42
Room 530
  • South wall shelves removed
  • Separate heat/cool climate control to keep room
    temperature cooler
  • Replace water sprinkler with Halon / non-water
    system

43
Public Restrooms
  • Modernize replace all fixtures

44
Room 528
  • Mens Restroom (Staff)
  • Modernize Replace all fixtures
  • Place shelf/cabinet to store supplies

45
Room 529
  • Womens Restroom (Staff)
  • Modernize Replace all fixtures
  • Place shelf/cabinet to store supplies

46
507 Hallway
47
507 Hallway
  • Replace mailboxes with enclosed, locking
    mailboxes
  • Install cabinets below mailboxes and cabinets
    that match on both sides of mailboxes. The
    cabinets on the west side should be similar to
    ones that exist currently and on the east side
    the same but only 2.5 feet long.
  • Electrical current box located in Room 505 put on
    the other side of wall in the hallway across from
    507

48
Faculty Office Hallway
49
Faculty Office Hallway
  • Replace brown bulletin board w/ blue bulletin
    boardidentical to the blue one already in
    hallway.
  • Do not replace paper holders by office doorsthey
    should be taken down

50
Main Hallway
51
Main Hallway
  • Move Coke/Pepsi machines to outside quad area
  • On west wall next to Room 504 place two blue
    bulletin boards (4 X 8 ft.) centered on each side
    of the electrical outlet Also, raise the
    electrical outlet
  • The desk area on the west wall by 504 will be 4
    60 X 24 in. tables w/ chairs and distribute the
    electrical outlets across the desk area

52
Main Hallway
  • The desk area on the west wall by 501 will b 460
    X 24 in. table w/ chairs with electricity
    distributed across the desk area
  • As mentioned in Room 506door and stairway from
    east wall near north entrance.
  • East wall across from Room 504 add another 4 X 8
    ft bulletin board (total of 2 as one already
    exists)centered between Room 506 and handicapped
    door opener
  • Where current schedule is stapled to the wall
    next to Room 505 a large display case to be
    mounted

53
502/503 Hallway
54
502/503 Hallway
  • New display case on wall between Rooms 528 and
    529 (staff restrooms)same size as the one on
    opposite wall
  • Replace current bulletin board on wall around the
    corner from 504
Write a Comment
User Comments (0)
About PowerShow.com