Title: Jane Briggs and Karen Mitchell


1
The New LEED Building at Shady Grove
Presented by Jane Briggs and Karen
Mitchell October 11, 2007
2
(No Transcript)
3
Start from the beginning.
Light Air - Views
4
  • Sustainable Sites
  • Erosion Sediment Control- minimize site
    disturbance
  • Site Selection- avoid sensitive areas (farmland
    wetlands)
  • Development Footprint- minimize footprint by
    stacking building program

5
  • Sustainable Sites Alternate Transportation
  • Access to Public Transportation
  • Bicycle Storage on-site showers
  • Alternate Fuel Station (electric vehicle)
  • Carpooling (17 spaces provided)

6
  • Sustainable Sites
  • Reduce Heat Island Effect
  • Non-Roof
  • Tree shade, reflective sidewalks
  • Roof
  • highly reflective roof coating
  • vegetated green roof

7
  • Water Efficiency
  • Water efficient (drought resistant) landscaping
  • Native Plant Species
  • High Efficiency Irrigation (soil sensors)

8
  • Water Efficiency
  • Projected to be 41 below baseline
  • Water efficient plumbing fixtures
  • Ultra low-flow urinals
  • Dual flush water closets
  • Electric Sensors and Aerators on sinks

9
  • Energy Atmosphere
  • Fundamental and Additional Building
    Commissioning Performed
  • No ozone depleting CFC-based refrigerants
  • HCFC-free and Halon free refrigeration
  • Measurement Verification Plan Developed

10
  • Energy Atmosphere
  • Projected to be 30 below baseline
  • High efficient boiler chillers
  • Premium efficiency motors
  • Variable Speed Drives on chilled and
    hot water pumps
  • Day Lighting Controls
  • Exterior Shading
  • Additional wall and roof insulation

11
  • Materials Resource
  • Building designed to accommodate storage
    collection of recyclables
  • Construction Waste Management 83 of all
    collected waste was recycled
  • Site Demolition Existing trees relocated,
    asphalt and concrete curbs recycled

12
  • Materials Resource
  • 25 of materials used were of recycled content
  • 48 of materials were manufactured regionally
  • 82 of wood-based materials certified by Forest
    Stewardship Council (FSC)
  • Interior finishes selections
  • Flooring- linoleum, bamboo, terrazzo, carpets
  • Wall finishes- wheat board, wall paper
  • Ceilings- acoustic ceiling tiles, drywall and
    metal panels
  • FSC certified wood paneled soffits and doors

13
  • Indoor Environmental Quality
  • Carbon Dioxide (CO2) Monitoring
  • Construction Indoor Air Quality Plan- During
    construction before occupancy
  • Low-emitting materials- glues, paints, carpets,
    woods
  • Thermal Comfort- temperature controls operable
    windows

14
Indoor Environmental Quality
  • Daylight and Views-
  • 75 of all the occupied spaces have daylight
  • Window size variations to create a balance
    between need for day light and energy efficiency

15
Green OM Plan
16
Green Education
17
Furniture
18