Title: Demand Aggregation Workshop and How to Bring Broadband Home


1
Demand Aggregation Workshop and How to Bring
Broadband Home
  • Its the Harry and Mark Show!!

2
(No Transcript)
3
(No Transcript)
4
This Isnt the Field of Dreams
  • You cant do a build it and they will come
    because nobody will support the build-out
    without a solid ROI
  • Broadband will EVENTUALLY come to a theatre near
    you how long are you willing to wait to see the
    movie or are you waiting for the video release?
  • You must take the initiative locally to obtain
    broadband services in your near future

5
What is Demand Aggregation?
  • What is it?
  • Aggregation of all internet usage within the
    business and commercial sector of the community

6
Partnerships Building Relationships
  • Locally within the community
  • Regionally multi-county
  • Partnerships may involve working with existing
    service providers and building new alliances
    key element

7
Issues Within the Community
  • What are your issues?
  • Lack of service
  • Lack of high speed access
  • Price to high
  • Quality of service
  • Service interruptions
  • Lack of competition

8
This is a Business Application
  • Business and commercial use such as traditional
    businesses, large educational and health sector
    users
  • This process does not benefit residential users

9
Sparkplug Needed!!
  • AC, Champion, or Autolite? Guys thing!
  • A strong locally committed individual or
    organization to champion the entire effort from
    beginning to end
  • You must have a SPARKPLUG or the process will
    fail

10
Whats Needed?
  • Committed local citizens (sweat equity)
  • Contributed local services including meeting
    space, printing costs, etc.
  • This is not a cheap undertaking you may need Big
    Bucks (and we arent talking about the four
    legged kind with antlers)

11
Reality Check (or Will the Contract for Services
ever be in the Mail!)
  • Not a short term effort
  • You may not get a marriage proposal or a solid
    business case that makes sense to a service
    provider

12
Six Case Models
13
The Findlay Ohio Model
  • Issues
  • Lack of high speed access
  • No local POP (were not talking about sodas and
    soft drinks!!)
  • Strong businesswoman became Sparkplug.
  • Three sector collaboration model business,
    health and private higher education/college

14
Findlay Model Continued
  • Process began in March 2000
  • Off-shoot of E-COM Ohio study
  • Established Telecom Infrastructure Committee
    (TIC)
  • Average core of 5-15 members
  • All members were invited
  • Formal subcommittee of Findlay Chamber of Commerce

15
Findlay Model Cont
  • Conducted two studies to determine Demand for
    services
  • First study focused on key business and major IT
    users
  • Second study went to 30-45 businesses
  • Sparkplug/chairman of TIC committee coordinated
    all communications between members

16
Findlay Model Cont
  • All expenses were absorbed by local businesses
  • TIC planning meetings were closed to the public
  • All Chamber meetings were open to the public
  • No media involvement initially
  • Chamber received routine updates from IT committee

17
Findlay Model Cont
  • Service providers initially contacted
  • No involvement once the planning process started
  • At completion of planning process, vendors were
    invited to make a presentation
  • 15 providers made presentations including telco,
    cable, ISPs and others

18
Findlay Model Cont
  • TIC concluded that service providers would not
    make investment in infrastructure because demand
    did not generate enough ROI
  • TIC decided to fund infrastructure development
    through private venture capital funds - 500 K

19
Findlay Model Cont
  • POP was installed and turned up on 9/1/01
  • Created Silicon Alley in CBD to serve major
    businesses in community
  • A for-profit company was established to run the
    new ISP
  • www.centracomm.net

20
Findlay Model Cont
  • Centracomm continues to expand
  • Service providers immediately started offering
    DSL and cable modem and other enhanced services
    once the POP was in place

21
Findlay Model Cont
  • Model was successful in bringing both high speed
    access and a POP to Findlay

22
Dalton GA Utilities Model
  • DU was looking for a means to connect its
    numerous off-site facilities in the community to
    its central HQ to improve management over-site
  • DSL and cable modem services were not available
  • DU decided to install fiber infrastructure

23
Dalton Model Cont
  • DU provides water/sewer/gas/electricity service
    to the community
  • Many large business users are in close proximity
    to DU off-site facilities
  • DU is part of a statewide wholesale electric
    service provider)

24
Dalton Model Cont
  • Planning committee established in Sept 1998
  • Small committee (CEO and 2 IT managers)
  • Initial concept was internal business application
  • When getting ready to string fiber, DU decided to
    overbuild and offer commercial service to
    schools, etc.

25
Dalton Model Cont
  • Planning phase was short based on internal
    requirements
  • ROW access was not an issue because DU owned
    existing utility poles and R-O-W
  • Initial planning to fiber placement took one year
    in duration

26
Dalton Model Cont..,.
  • DU decided to use an ATM network with six
    switches lots of horsepower mid-sixties muscle
    car!!
  • DU constructed a mesh network design with
    built-in redundancy
  • Network included wireless applications with
    antennae on existing water towers (convenient if
    you happen to own all the water towers!)

27
Dalton Model Cont
  • Entire project was internally funded by DU
  • A consultant was used for engineering design and
    fiber placement
  • DU conducted a survey of key businesses in close
    proximity to DUs facilities

28
Dalton Model Cont
  • DU held an open house for large industrial
    companies to showcase the fiber network
  • DU produced a public information video to be run
    on local community TV network
  • New ISP providers have come into the community

29
North Carolina Model
  • 23 county effort
  • Initial discussions began in 1993
  • In 1995, Appalachia NC became involved in a
    statewide strategic telecommunications planning
    effort
  • ARC underwrote the Appalachian Region

30
NC Model Cont
  • In Spring 2000, ARC began funding a Demand
    Aggregation project in the 23 county area
  • Southwestern Community College became the
    Sparkplug for the project
  • SCC invited other major partners to participate
  • Five to eight key individuals coordinated the
    whole project efforts

31
NC Model Cont
  • Purpose was to secure high speed access for
    economic development purposes
  • Steering committee was formed
  • A technology advisor and legal advisor were added
    to the steering committee Pro Bono
  • Local planning officials, economic development
    individuals and 14 Chambers of Commerce
    participated in the project

32
NC Model Cont
  • Four committees were established business,
    legal, political and technical
  • Over 100 organizations participated on the
    committees
  • Each member was required to sign a
    non-disclosure/confidentiality agreement this
    was a key element that was critical in moving the
    project along!!

33
NC Model Cont
  • Committee discussions included tiering of
    telephone services, redundancy, scalability,
    subscription rates, legal issues, quality of
    service issues, last-mile and middle-mile
    issues, cost for internet access, POP needs,
    demand aggregation issues, economic development
    needs, and many other topics

34
NC Model Cont
  • A major survey and data collection process was
    undertaken
  • 12.6M plus in demand usage was identified
    (internet/local and LD)
  • Analysis was done of existing telephone bills
  • This was an eye-opening experience and not a
    Bloody Mary in the morning!!!!!

35
NC Model Cont
  • This allowed the steering committee to share
    normally protected confidential data with
    potential service providers who were willing to
    sign non-disclosure agreements
  • A second demand aggregation survey was undertaken
    and more demand was identified
  • The project has just been completed with the
    development of a for-profit / non-profit
    partnership arrangement that will build numerous
    interconnecting sections both last mile and
    middle mile to connect to existing
    telecommunication infrastructure.

36
NC Model Cont
  • In January 2002, a 4.3M federal grant from the
    Library of Congress was approved that would
    underwrite deployment of fiber optic network to
    serve schools and libraries. In FY 2003 an
    additional 10M was approved by a Congressional
    earmark.
  • Incidental costs associated with the planning
    process were absorbed by local committee members

37
NC Model Cont
  • ARC invested 582k in the demand aggregation
    project including salary, travel, supplies,
    marketing and advertising costs, web-page
    development and other services
  • Numerous consulting and legal services were
    provided pro bono

38
NC Model Cont
  • The media was not initially involved in the
    process however steering committee members gave
    numerous presentations throughout the 23 county
    area and the media picked up on what was being
    done

39
NC Model Cont
  • From the beginning, the steering committee was
    seeking a service provider alliance partners
  • Initial contacts with telcos were not encouraging
  • Service providers indicated they would be
    interested in the project findings

40
NC Model Cont
  • Initially, service providers felt there was not
    enough demand to warrant the infrastructure
    investment
  • After 12.6M of demand was identified, two
    service providers were considered as being
    possible alliance partners
  • One of the providers decided that there simply
    was not an adequate ROI and withdrew

41
NC Model Cont
  • The second provider was contacted
  • A number of issues were identified ownership of
    equipment, the need for subsidized funding
    middle-mile connectivity concerns were paramount,
    ROI projected to far into future, sharing of
    annual revenues between service provider and
    non-profit organization
  • So, is it really possible to have a revenue
    sharing arrangement with a service provider?

42
NC Model Cont
  • Persistence pays off..
  • In late 2002 Wholesale Transport costs began to
    tumble 1,600 / 20 anywhere on net and as a
    result numerous secondary service providers
    became potential partners.
  • A new 501 organization was established in order
    to own and deploy infrastructure
  • New telecommunication competition came into the
    market place, prices continued to drop, and
    deployment is occurring!!!!!!!

43
Sonet Ring and POP
  • In partnership with DukeNet and other providers a
    214 mile 48 strand - Sonet ring is being
    established
  • A POP has been established in Asheville that is
    linked to Greenvilles POP, and the POP in the
    Research Triangle.
  • The State of NC and local partners provided
    funding for the network
  • Pricing on the ring is priced at Tier 1 level
    like Washington DC! A total Win!!!!!!!!!!!

44
The Berkshire Connect Model
  • In the mid-90s, two major companies left the
    area which resulted in 13-14,000 people losing
    their jobs
  • Several new tech firms moved into the area and
    needed high speed access
  • T1s were available from telco but there were
    service quality issues and pricing was a major
    concern for the small business sector
  • Existing local businesses had pent-up demand for
    increased telco services

45
BC Model Cont
  • Community leaders recognized the need to improve
    their economic development base
  • Increased telco services were viewed as an
    integral part of future economic / social
    development of the community
  • Initial planning group started in 1996
  • All four sectors were involved in the initial
    planning stages
  • Local Planning Commission became the coordination
    organization

46
BC Model Cont
  • Mission was twofold expand high speed access and
    lower existing LD rates within the business
    community
  • This was a business/commercial user model (did
    not include residential users)
  • In the early stages, there were community-wide
    seminars to discuss steps to be taken
  • Local press attended these initial seminars

47
BC Model Cont
  • Three committees were established cultural arts,
    education, and business/industry
  • Some members were recruited all were volunteers
  • A coordinating task force was established to
    coordinate the overall process
  • A critical user sub-committee was eventually
    formed to address technical issues

48
BC Model Cont
  • The critical user sub-committee became bogged
    down (in a quagmire of technical muck jargon and
    lost their way in the swamp!!)
  • They couldnt figure out which technology would
    work best fiber vs wireless, radio vs
    microwave, satellite vs 2- tin cans on a tight
    string!!!!

49
BC Model Cont
  • The coordinating task force met monthly and all
    other committees met as needed
  • Beginning in the Fall of 1997, a consultant was
    hired to develop a business plan and address the
    technical network issues

50
BC Model Cont
  • A survey was done of the major business users to
    gather information on their use of T1 lines, the
    cost of service, and the quality of service
  • The survey also explored additional high speed
    line needs of the business community
  • A key component for the businesses was lowering
    LD rates

51
BC Model Cont
  • The project was begun with a 500K grant from a
    State Technology Fund
  • The community also floated a 1M bond issue to
    raise additional capital for the future potential
    of the deployment of technology
  • The overall planning project took 2.5 years to
    complete

52
BC Model Cont Engineering
  • It was determined a microwave/radio solution
    appeared to be the most practical and cost
    effective solution to reach the nearest POP (an
    existing microwave tower was on a mountain nearby
  • It was determined that vendor pricing must be
    based on a flat rate model as opposed to distance
    sensitive pricing
  • It was also determined that there needed to be
    quality of service improvements over existing
    telco offerings and substantial reductions in LD

53
BC Model Cont
  • The project was put out for bidding to a variety
    of service providers both ILEC and CLEC
  • The local cable service provider was not
    considered a potential viable service alternative
  • The local telco was not considered a potential
    viable service provider based on the existing
    distance sensitive pricing

54
BC Model Cont
  • A community web-site was established to keep the
    local business community and other local
    interested citizens updated on the progress of
    the project
  • www.bconnect_at_rnetorx.com

55
BC Model Cont
  • Two competitive service providers (CLECs) were
    ultimately selected to provide the services
    requested in the RFP
  • Global Crossing and Equal Access were selected to
    provide the following services (lower cost T1
    access, improved quality of service and lower LD
    pricing)
  • Business LD pricing was anticipated to be reduced
    from 9 cents per minute to just over 2 cents per
    minute
  • One company realized a 45k monthly savings!

56
BC Model Cont
  • The Global Crossing/Equal Access solution
    required a staged build out process
  • 25 or more new customers were needed to warrant
    further construction of the network (the network
    was deployed incrementally)
  • The new BC network is currently serving in excess
    of 65 non-residential customers

57
BC Model Cont
  • After the BC network became operational, several
    ISPs came into the area and began to offer
    services
  • The BC DA model is being replicated in other New
    England communities

58
BC Model Cont
  • Global Crossing has just come out of Chapter 11
    bankruptcy protection
  • Other replicated models have been on hold pending
    the outcome of the bankruptcy petition
  • It is anticipated that these communities will now
    move ahead

59
Blacksburg Electronic Village
  • University based project in Blacksburg VA
  • Blacksburg has a population of 36,000 about 85
    of the population is affiliated with VA Tech
  • BEV was initially funded by a grant from VA Tech
  • In 1993, dial-up access was offered to the city
  • Alliances were initially forged with teleco

60
BEV Cont
  • In 1994, ISDN and Ethernet connections were
    offered in the city
  • Today, almost 87 of businesses in Blacksburg are
    internet users with 75 advertising on-line
  • 60 of Blacksburg residents have access to
    broadband connections
  • In progressive stages, components of the network
    and customer base was turned over to private
    companies

61
BEV Cont
  • BEV works closely with the Town of Blacksburg,
    local civic groups, business and individuals to
    ensure that internet tools are used
  • BEV is also getting involved in e-commerce
    activities and other uses of broadband services

62
BEV Cont
  • Lessons Learned
  • Application worked very well in Blacksburg
  • Large major university presence
  • Large body of personal computer users
  • Subsidy type funding provided by school
  • Would the model work in a different community??

63
La Grange GA Model
  • LaGrange is located 70 miles southwest of Atlanta
    on the Alabama border

64
An old textile based community with a 30 year
decline in textile employment
  • Overall AD project was part of a revised economic
    development program to diversify the
    manufacturing economy

65
La Grange Cont
  • The city council and the citys economic
    development project manager became the Sparkplug
    for the project
  • The Chamber of Commerce played an integral part
    in the overall process

66
La Grange Cont
  • In early 1990s the city established a telecom
    committee
  • In 1992, the city hired an engineering firm to
    examine existing telecom infrastructure and
    outline future needs
  • In 1993, the city entered into negotiations with
    local telco to address citys future needs and
    expectations

67
La Grange Cont
  • Local telco could not initially respond to citys
    needs based on ROI
  • The city is a provider of water/sewer/gas/electric
    ity similar to Dalton Utilities
  • In 1993-5, the city placed a 4 mile fiber ring
    around the city and leased it back to the telco
  • In 1995-6, the telco installed a digital switch
  • In 1997, the city filed as a competitive local
    exchange carrier (CLEC) for businesses and
    institutions

68
La Grange Cont
  • In 1998, city established public/private venture
    with the local cable company to provide broadband
    access
  • The city financed a HFC cable and leased back to
    the cable company
  • The city has spent over 11M up to this point

69
La Grange Cont
  • In March 2000, the city announced broadband
    Internet access through the establishment of the
    LaGrange Interactive TV service (LITV)
  • The LITV is a web-based TV access to the internet
  • This permitted E-mail and web surfing through a
    wireless keyboard

70
La Grange Cont
  • By August 2000, 1500 units were installed in
    residential homes
  • By September 2001 - 4,377 units were installed
    in residential homes
  • The city created a web portal loaded with
    specialized content on how to use the web TV
    appliance
  • Cable TV provides training program on how to use
    of the LITV system

71
La Grange Cont
  • Additional content is routinely added by the
    community to the web site
  • The city invested over 420k in the web TV
    appliances and installation costs
  • The city installed all systems
  • The cable company then reimbursed the city for
    installation costs

72
La Grange Cont
  • Results
  • City residents are learning computer skills from
    home
  • Web content compliments school curriculum
  • A job listing service has been established on the
    web-site
  • City-wide communication has increased
  • Local E-commerce applications were developed

73
La Grange Cont
  • 35 new industries have now located in the
    community
  • Textile industry decline has continued

74
La Grange Cont
  • Key Elements
  • Numerous lease back arrangements were established
    with telco and cable
  • Essential alliance partnerships were established
    with telco and cable
  • System expansions were based on solid business
    decisions
  • City did not attempt to compete with telco or
    cable

75
La Grange Cont
  • City was fiscally conservative throughout the
    entire process
  • Cable company provided discounted services to
    city as part of leased arrangements
  • Internet service in the city is currently free of
    charge through 2003

76
La Grange Cont
  • Through the entire process, the city has changed
    its economic development image
  • The LITV program has increased product marketing
    throughout the city
  • Basic educational skills have been improved by
    the use of the LITV

77
How do you Interact with the Current Service
Provider?
  • First approach existing telco/cable provider to
    solicit support
  • If existing provider is unable to provide
    affordable high speed access into community, you
    may need to consider DA
  • Upon completion of DA process, present results to
    existing providers

78
Do You Need a Business Plan?
  • YES
  • You cannot sell your concept without a business
    plan (or Have we got a bridge for sale!!)
  • You need a plan to obtain funding from any source

79
How is the Plan Actually Used?
  • Proves the fiscal viability of the DA project
  • Selling point within the community
  • All financial partners will ask you
    right-up-front for your business plan.
  • You need it to solicit support from potential
    service providers and essential alliance partners
  • Needed in RFP bidding process
  • Garner political support if needed

80
Demand Disaggregation
  • There are situations where demand can be siphoned
    off via a public or private sector based network
    eliminating major components of the overall
    demand base in a community

81
Demand Disaggregation
  • Education networks involving state or regional
    educational entities (OH VA PA GA AL NY TN etc.)
  • Health sector using private networks to connect
    facilities (GA AL PA OH NC SC)
  • Government networks connecting state facilities
    and local facilities (GA NC TN etc)
  • Businesses using private networks WalMart, GM
    Ford, Chrysler, and other local based businesses

82
Demand Disaggregation
  • E-rate funding
  • Satellite access

83
How to Finance DA Projects
  • Local dollars
  • State dollars
  • Federal dollars
  • Private venture capital dollars
  • Foundation dollars
  • Contributed services

84
Who Leads The Charge
  • Dynamic community oriented individual is a must
    (Sparkplug)
  • Local government
  • Utility district
  • Higher education facility or health organization
  • Local planning commission (council of govt)
  • Chamber of Commerce or local business leader
  • Non profit
  • Other?

85
Timeline for the Broadband / DA Project
  • How long does it really take?
  • The telecommunication industry is still in
    turmoil
  • Strategic alliances are critical from the very
    beginning of the process
  • Strength of the Sparkplug to coordinate and keep
    the process focused
  • This is not a 12 month process

86
Organization of Committees
  • Not all DA projects will require all committees
  • Background of participants will dictate need for
    specific committees

87
Potential Committees
  • Oversight Committee
  • Technology/Infrastructure Committee
  • Legal Committee
  • Sector Committee
  • User Committees
  • Political Committee

88
Committee Members
  • Volunteer vs Recruited
  • Relevant background
  • Diverse group from community
  • Do you want service providers?
  • Is there a need for a consultant role?
  • Do you want press participation?
  • Do you want a non-disclosure agreements?

89
Role of Consultant
  • Do you need a consultant?
  • For Technology issues
  • For Legal issues
  • For development of strategic/business plan
  • For funding issues
  • For overall coordination of process

90
Will Demand Justify the Investment?
  • There may not be enough demand to justify the
    expense of deployment by existing service
    providers
  • Seek competitive alternative service providers
  • There may not be enough demand for any service
    provider to deploy infrastructure without
    financial assurances

91
If That Happens
  • This is where you have to become very proactive
  • Work with state PSC
  • Become active in 271 applications
  • Participate in potential over-earning reviews
  • Monitor previously filed technology deployment
    schedules
  • Work the political process
  • Float a local bond issue as leverage

92
The Technology
  • Do not limit your thinking to one technology
    solution (Dont throw out the baby with the bath
    water!).
  • Fiber or other traditional land lines
  • Wireless radio
  • Wireless microwave
  • Satellite
  • Cable
  • Or a combination thereof!

93
Public Infrastructure Ownership
  • Means to an end OR see you in court!
  • MS Create Foundation / not-for-profit
  • VA City owned
  • NC Combination
  • Iowa State network

94
Is This a worthwhile Effort?
  • The take rate for high-speed telecommunication
    services is still about 20 25 nationally
  • Is it a demand issue or a supply issue?
  • Can you afford to wait from an economic
    development point of view?
  • The DA planning process is similar to community
    development processes that resulted in the roads,
    water and sewer systems that underpin our
    community economic development today
  • You need to have a community on-ramp to the
    information highway!