USDPRK NEXT STEPS WORKSHOP January 27, 2003 Washington DC - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

USDPRK NEXT STEPS WORKSHOP January 27, 2003 Washington DC

Description:

Senior Engineer, Oak Ridge National Laboratory, Dept. of Energy, January 27, 2003. ... Probably not a nuclear free North Korea? Is facility dismantlement a goal? ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 7
Provided by: Gift3
Category:

less

Transcript and Presenter's Notes

Title: USDPRK NEXT STEPS WORKSHOP January 27, 2003 Washington DC


1
US-DPRK NEXT STEPS WORKSHOP January 27, 2003
Washington DC
  • Dismantlement and Cessation of DPRK Nuclear
    Capacities
  • Living with Uncertainty
  •  
  • Elwood Gift
  • Senior Engineer, Oak Ridge National Laboratory,
    Dept. of Energy, January 27, 2003.

2
LIVING WITH UNCERTAINTY
  • After we have a North Korean Declaration on their
    uranium enrichment program

3
Should we be content?
  • What does the Declaration consist of?
  • Enrichment facilities only?
  • Mining, conversion, and uranium storage
    facilities included?
  • Centrifuge and component facilities included?
  • Nuclear material produced?
  • Do we have access?
  • Inventory in Declaration?
  • Can its completeness be verified?
  • Production records?
  • Records of imports and their disposition?

4
Can the Declaration be confirmed?
  • What are the inspectors rights of access?
  • How often?
  • With or without prior notice?
  • How many persons?
  • How intrusive can they be?
  • Sampling and analysis rights?
  • Is the Declaration complete enough for meaningful
    production analysis?

5
What are the goals?
  • A nuclear weapons free North Korea?
  • A nuclear (uranium) production free North Korea?
  • Probably not a nuclear free North Korea?
  • Is facility dismantlement a goal?
  • How much confidence do we need?

6
Can we find an undeclared gas centrifuge
enrichment facility?
  • What is its production capacity?
  • Possibly 25 kg HEU/year
  • What are the observables?
  • Power requirement lt 200 Kw
  • Natural uranium requirement About 5500
    KgU/year, about 4 30B UF6 cylinders per year
  • Size of building lt a Safeway grocery store
  • Is it underground? Probably
  • Emissions Virtually none
Write a Comment
User Comments (0)
About PowerShow.com