Work with all stakeholders early in the PBL formulation process to develop system support strategy - PowerPoint PPT Presentation

About This Presentation
Title:

Work with all stakeholders early in the PBL formulation process to develop system support strategy

Description:

Engineering. Other. PBL Proposal Should Target. Performance Improvements. and Not Cost More Than ... Naval Inventory Control Point. Not more than 50 percent of ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 9
Provided by: navs6
Learn more at: https://www.sae.org
Category:

less

Transcript and Presenter's Notes

Title: Work with all stakeholders early in the PBL formulation process to develop system support strategy


1
Acquisition ProcessIntegrated Process Team
  • Work with all stakeholders early in the PBL
    formulation process to develop system support
    strategy
  • Develop SOW and determine contractual metrics
  • Ensure that Core issues are being addressed
  • Is the system Core?
  • Is there Navy/DoD core logistics capability?
  • What is depot impact?
  • What is Core strategy?
  • Address Core compliance strategy in the JA
  • Construct the Business Case Analysis
  • Initiate Congressional Notification as early as
    possible

2
Business Case Analysis
  • Proposal
  • Material Procure Repair
  • Inventory Control
  • Management OH
  • Warehousing
  • PHST
  • Asset Visibility
  • Engineering
  • Other

Business Case Analysis
PBL Proposal Should Target Performance
Improvements and Not Cost More Than Tradition
Support
3
Statutory RequirementsThe 50/50 Rule
10USC 2466
  • Not more than 50 percent of the funds made
    available in a
  • fiscal year to a military department or a Defense
    Agency
  • for depot-level maintenance and repair workload
    may be
  • used to contract for the performance by
    non-Federal
  • Government personnel of such workload for the
    military
  • department or the Defense Agency. Any such funds
    that
  • are not used for such a contract shall be used
    for the
  • performance of depot-level maintenance and repair
  • workload by employees of the Department of
    Defense

Applied at the Service (DON) level
4
Statutory RequirementsCLC Rule
10USC 2464
  • Core Logistics Capabilities shall include those
    capabilities that are
  • necessary to maintain and repair the weapon
    systems and other
  • military equipment (including mission-essential
    weapon systems or
  • material not later than four years after
    achieving initial operational
  • capability, but excluding systems and equipment
    under special
  • access programs, nuclear aircraft carriers, and
    commercial items)
  • that are identified by the Secretary, in
    consultation with the
  • Chairman of the Joint Chiefs of Staff, as
    necessary to enable the
  • armed forces to fulfill the strategic and
    contingency plans prepared
  • by the Chairman of the Joint Chiefs of Staff.

If system is Core, DoD must have Core logistics
capability
5
Statutory RequirementsCore Determination
  • NAVSEA core determination is made at the platform
    (ship) level
  • NAVAIR normally takes core determination down to
    the individual repairable component (DLR) level
    however precedence has been set for a
    platform-level CORE determination on some PBLs
  • NAVSEA and NAVAIR interpret Core logistics
    capability differently

6
Statutory Requirements Other Restrictions
  • Congress must be notified when
  • Under 10 USC 2461 for any work being changed from
    performance by DoD civilian employees to the
    private sector
  • Under 10 USC 2464 the first time an item is
    determined commercial for the purposes of
    applying the section 2464 commercial item
    exception
  • Under 10 USC 2469 can not move more than 3M
    workload/year from a DoD depot unless merit-based
    selection procedures/competitive procedures are
    used

7
Awarded PBLs
M
Obligations
The Wave of the Future
8
Awarded PBLs
Auxiliary Power Unit
Title 10 Compliant
  • Supports C-2, F/A-18, S-3 and P-3.
  • Public / Private Partnership
  • Honeywell... Program Management
  • NADEP Cherry Point... Sub-contractor
    performing touch labor
  • 10-Yr Performance Based, Firm Fixed Price
    (5 year base 5 one-year options)
  • 25 - 45 Reliability Improvement
  • Delivery Guarantees... 2 Days (IPG 1)
  • Obsolescence Management
  • Surge Capability...120 of Annual FHs
  • Product Support Engineering

Plus
On-Line Shipping Inv Mgmt
Write a Comment