Title: Bradford Bypass Extension, Bradford Township, McKean County, District 2
16. Accommodate All Modes of Travel
- Phase 1 of the Bradford Bypass Project
- Project goal was to provide continuous through
movement of traffic on US219 by spanning Owens
Way with a bridge - Located at the end of a limited access Bradford
Bypass
Bradford Bypass Extension, Bradford Township,
McKean County, District 2
26. Accommodate All Modes of Travel
- District worked closely with McKean County
Planning Organization and Northcentral Planning
Organization - Design was revised to include a box culvert to
provide safe passage for pedestrians/bicyclists
under US 219 - The passage will become part of a future Rails to
Trail project
Bradford Bypass Extension, Bradford Township,
McKean County, District 2
36. Accommodate All Modes of Travel
- Key piece of a 70 million downtown
revitalization project - Transit Center is a mixed use and
joint-development project involving the City,
River Valley Transit, business organizations,
developers - Hub for city buses and houses the Community
Theatre League and Chamber of Commerce - Approximately 2,000 passengers go through transit
center daily
Williamsport Transit Center , District 3
46. Accommodate All Modes of Travel
- New bus shelters- functional and designed to fit
downtown context - College Town committee formed to gather input
for improved service to Pennsylvania College of
Technology and Lycoming College
Williamsport, District 3
56. Accommodate All Modes of Travel
- Bridge over Amtrak was structurally deficient
- Route 72 is a major gateway into historic city
of Lancaster and a multi-modal corridor - High bicycle and pedestrian area
- Community desired a gateway design into
Historic Downtown Lancaster
SR 72 Fruitville Pike Bridge, Lancaster County,
District 8
66. Accommodate All Modes of Travel
- Bicycle facilities designed in collaboration with
Lancaster bicycle clubs, Amtrak, Red Rose
Transit, and County - Bicycle facility lane markings and "share the
road" signs were installed.
SR 72 Fruitville Pike Bridge, Lancaster County,
District 8
76. Accommodate All Modes of Travel
- New Girard Ave / I-95 interchange needed to
address congestion, repair existing
infrastructure, and reconnect neighborhood to
Delaware River - Incorporated bike lanes, sidewalks, and multi-use
path connection to East Coast Greenway - Access to and accommodation of Girard Ave trolley
was critical
Girard Avenue Interchange, Philadelphia, District
6
86. Accommodate All Modes of Travel
- Existing spaghetti design connects Route 356
from Westmoreland to Butler and Armstrong
Counties across the Allegheny River - 13 intersections and 3 weave conditions within a
confined area - Project aims to reduce weave areas, eliminate
skewed intersections, and reduce travel times
Freeport Bridge, Freeport, Districts 10 12
96. Accommodate All Modes of Travel
- Bridge is gateway to Freeport and important
potential area for multiple trails to connect - Final design incorporates multi-use path and
allows for future trail connection
Freeport Bridge, Freeport, Districts 10 12
106. Accommodate All Modes of Travel
- 12M Renovation and conversion of old Mon Con
railroad bridge to a 2-lane vehicular bridge
(June 2000) - 10M Conversion and rehabilitation of parallel
Hot Metal Steel Bridge for pedestrians and
bicyclists (November 2007) - Both offer direct connection between 2 of the
citys most significant redevelopment areas
Technology Corridor and the South Side Works. - Both bridges are perfect examples of the
retention of historic structures for uses
different from their original intent.
Monongahela Connecting Railroad Bridge and Hot
Metal Steel Bridge, Pittsburgh, District 11
116. Accommodate All Modes of Travel
- Projects were led by the Urban Redevelopment
Authority in collaboration with the County,
various trail and historic preservation groups,
and PennDOT District 11 - Hot Metal Bridge provides a missing link of the
Three Rivers Heritage Trail and the Great
Allegheny Passage, a hiking/biking trail
beginning - at Point State Park and extending to Cumberland,
MD
Monongahela Connecting Railroad Bridge and Hot
Metal Steel Bridge, Pittsburgh, District 11
126. Accommodate All Modes of Travel
- Transportation Enhancement Project of 5-mile
section in Washington County - Part of a 29 mile-rails to trails project from
Collier Township, PA to Colliers, WV - Partnership with Washington County
- PennDOT involved in funding and oversight
- Completed in June 2007
- Construction cost 725,000 (approx.)
Panhandle Trail, Washington County, District 12
136. Accommodate All Modes of Travel
- Part of 5.2 mile long trail through Jeffereson,
Rices Landing and Cumberland Townships - Greene Trail Phase 1b project covers 1.7 miles
from Rices Landing to Crucible - Construction began in August 2006 and completed
in December 2006 - Total construction cost of 475,000, funded
through transportation enhancement grants
Greene Trail, Greene County, District 12