1Meeting the Challenges of Getting Alaskas
Natural Gas to Market
- Drue Pearce
- Federal Coordinator
- Office of the Federal Coordinator for
- Alaska Natural Gas Transportation Projects
- Law Seminars International Energy in Alaska
- December 9, 2008
2Pipeline Projects
- Past
- TAPS
- ANGTA
- Present
- ANGPA
2
3TAPS
3
4ANGTA
4
5ANGPA
5
6What is the Role of the OFC?
- Coordination
- Compliance and Oversight
- Information Dissemination
6
7What are the Challenges?
- Technical
- Economic
- Political
- Process
7
8Technical
- Construction in Permafrost
- Arctic Construction
- High Pressure/Large Diameter Pipelines
- Seismic
- Climate Change
8
9Technical Construction in Permafrost
9
10Technical Arctic Construction
10
11Technical High Pressure/Large Diameter48inch,
X80, 2500/2600PSIG
11
12Technical Seismic
12
13(No Transcript)
14(No Transcript)
15(No Transcript)
16(No Transcript)
17(No Transcript)
18(No Transcript)
19(No Transcript)
20(No Transcript)
21(No Transcript)
22(No Transcript)
23(No Transcript)
24(No Transcript)
25(No Transcript)
26(No Transcript)
27(No Transcript)
28(No Transcript)
29Economic
- Financing a 26 Billion Enterprise
- Infrastructure
- Steel
- Training/Retaining Qualified Labor
- Natural Gas Prices
29
30Economic Financing a 26 Billion Enterprise
30
31Economic Infrastructure
- Upgrade Bridges, Highways, Airports, Material
Sites and Maintenance Camps - Improve Safety and Drivability
- Improve Maintainability
31
32Economic Infrastructure Needs
- Approximately 2 Billion in Projects
- 52 Highway Projects
- 6 Airports
- 14 Bridges
- 15 Facilities
32
33Economic Steel
- Estimated 1.1 million tons in U.S.
- Estimated 1.4 million tons in Canada
- Total Estimate 2.5 million tons
33
34Economic Training/Retaining Qualified Labor
34
35Economic Natural Gas Prices
35
36Political
- Producers vs Pipeline Companies
- Key Players
- Canada
36
37Political Producers vs Pipeline Companies
37
38Political Key Players
- State and Provincial Governments
- Municipal Governments
- Stakeholders
38
39Political Canada
- National Energy Board
- Northern Pipeline Agency
39
40(No Transcript)
41Political Canada
- National Energy Board
- Northern Pipeline Agency
- ANGTA Treaty
- Harmonizing Standards
41
42Permitting Process
- Environmental Reviews
- Consultations
42
43Federal Agencies
- Office of Federal Coordinator
- Council on Environmental Quality
- Federal Energy Regulatory Commission
- Department of Interior
- Bureau of Land Management
- Bureau of Indian Affairs
- U.S. Fish and Wildlife Service
- Minerals Management Service
- National Park Service
- U.S. Geological Service
- Department of Energy
- Department of Transportation
- FHWA
- PHMSA
- FAA
- Department of Treasury
- Department of State
- Department of Defense
- U.S. Army Corps of Engineers
- Department of Commerce
- NOAA
- NMFS
- Department of Homeland Security
- CBP
- TSA
- U.S. Coast Guard
- Department of Labor
- Environmental Protection Agency
- Department of Agriculture
- Advisory Council on Historic Preservation
- Department of Justice
- Federal Communications Commission
43
44Permitting Process Environmental Reviews
- Federal, including NEPA
- State of Alaska
- Canadian, NPA or NEB
44
45FERC Pre-Filing Environmental Review Process
Applicant Process
FERC Process
Assesses market need and considers project
feasibility
Receives Applicants request to conduct its
review of the project within FERCs NEPA
Pre-Filing Process
Requests use of FERCs Pre-Filing Process
Studies potential site locations
Formally Approves Pre-Filing Process and issues
PF Docket No. to Applicant
Identifies Stakeholders
Holds open house to discuss project
Participates in Applicants open house
Issues Notice of Intent for Preparation of an EIS
opening the scoping period to seek public
comments.
Public Input Opportunities
Conducts route studies and field surveys.
Develops application.
Holds public scoping meeting(s) and site visits
in the project area. Consults with interested
stakeholders.
Issues Notice of Application
Files formal application with the FERC
Analyzes data and prepares Draft EIS
Issues Draft EIS and opens comment period
Public Input Opportunities
Holds public comment meetings on the Draft EIS in
the project area
Responds to comments and revises the Draft EIS
Issues Final EIS
Commission Issues Order
Parties can request FERC to rehear decision
Public Input Opportunities
Submits outstanding information to satisfy
conditions of Commission Order
Issues Notice to Proceed with construction.
46Thirteen FERC Resource Reports
- General Project Description
- Water Use and Quality
- Fish, Wildlife and Vegetation
- Cultural Resources
- Socioeconomics
- Geological Resources
- Soils
- Land Use, Recreation and Aesthetics
- Air and Noise Quality
- Alternatives
- Reliability and Safety
- PCB Contamination
- Engineering and Design Material
For more information on each report, you can find
the FERC regulations at http//edocket.access.gpo.
gov/cfr_2005/aprqtr/pdf/18cfr380.12.pdf
46
47Permitting Process Consultations
- National Energy Policy Act
- National Historic Preservation Act
47
48- Office of the Federal Coordinator
- Alaska Natural Gas Transportation Projects
- 1101 Pennsylvania Avenue, NW, 7th Floor
- Washington, D.C. 20004
- (202) 756-4955
- Info_at_arcticgas.gov
- http//www.arcticgas.gov
48