Transcript and Presenter's Notes

Title: Airline Reservation System


1
Airline Reservation System
  • MSE Project Phase III Presentation
  • -- Kaavya Kuppa
  • Committee Members
  • Dr.Daniel Andresen
  • Dr.Torben Amtoft
  • Dr. Mitchell L. Neilsen

2
Agenda for Phase III Presentation
  • Project Overview
  • Review of Work for Phase I and Phase II
  • Action items from phase II
  • Assessment Evaluation
  • Project Evaluation
  • Lessons Learned
  • Demo

3
Project Overview
  • The main objective of my MSE project was to
    design, code and test an Airline Reservation
    System website, which allows the users to
    purchase airline tickets and book motels and
    packages available to them.
  • This project is mainly developed for common
    people.
  • General features provided by the website are
    register, Search and browsing, flight, package
    and hotel booking etc.

4
Review of work for phases I and II
  • Phase I
  • Phase I of the vision document mainly was the
    requirements specification phase where I have
    designed the vision document for the Airline
    Reservation System.
  • All the use cases planned in the vision document
    for the user have been implemented

5
Review of work for phases I and II continued..
  • Phase II
  • The phase II of the project mainly consisted of
    revising the documents from Phase I
  • First working prototype was developed in this
    phase
  • Creation of Test Plan

6
Action Items from Phase II
  • The major action item from Phase II was the class
    diagram. I have corrected the class diagram and
    the correct diagram has been depicted in the
    Component Design document.

7
Action Items from Phase II
8
Assessment Evaluation
  • The Assessment Evaluation document is one of the
    Major deliverables of Phase III.
  • Two types of testing done on the Airline
    Reservation System application
  • - Manual Testing
  • - JMeter Performance Testing

9
Assessment Evaluation continued..
  • The manual testing was mainly performed to ensure
    correctness of the various parts of coding
  • Table Customer pages test summary

TEST CASE DESCRIPTION RESULTS/COMMENTS
TC 1 User Login Passed
TC 2 User Registration Passed
TC 3 Search and Book Flights Passed
TC 4 Search and Book Packages Passed
TC 5 Search and Book Hotels Passed
10
Assessment Evaluation continued..
  • The sample test case for manual testing of
    customer pages is

TEST UNIT TEST CASE RESULT
Flight booking Wrong format of information entered into the data fields of the flight booking page The system generates an error message to the user indicating that the wrong format of data is entered and to re-enter the data.
Flight Booking Wrong date format, in the date of journey data field, wrong flight number in the Flight Number fields etc, (similarly for all the other data fields of the Flight Search page) The systems generates a message to the user saying that he has entered an invalid date format and incase of wrong flight number, indicates that his entry is invalid.
Flight Booking Correct format of data is entered into the data fields in the flight booking page. The system allows the users to book the flight by providing details required and directs them to the booking confirmation page.
11
Assessment Evaluation continued..
  • The performance testing is mainly done to load
    test the web application.
  • The load is determined here in terms of the
    number of concurrent users of the website.
  • Determine the response time for the web page.
  • (Response time is the time taken by the server to
    bring up a requested page in the browser,
    beginning from the time it has been requested)

12
Assessment Evaluation continued..
  • The performance testing of the Airline
    Reservation System website was mainly done on
    three pages
  • Home.aspx page
  • Booking.aspx page
  • FlightSearch.aspx page

13
Assessment Evaluation continued..
  • The tool used for performance testing is JMeter.
  • Input to the JMeter tool consist of
  • Number of Threads/ Users
  • Ramp-up period time in seconds to load the
    total number of users chosen
  • Loop Count - number of times the test is to be
    repeated

14
Assessment Evaluation continued..
  • In my case I have tested the application for the
    following data
  • No. of users 100 No. of
    requests concurrently 1000
  • Ramp-up period 10
  • Loop count 10

Thread Count Ramp-Up Period Loop Count
100 10 10
15
Assessment Evaluation continued..
  • The throughput obtained for the three pages are

WEB PAGE THROUGHPUT
Home page 100/sec
Login page 91.0/sec
Flight Search and Booking page 62.3/sec
16
Assessment Evaluation continued..
  • I also tested for heavy load on the application,
    where the database had about 5000 elements in the
    table.
  • Initially the response time for the page, when it
    had a less number of elements in the table was
    around 15 ms
  • But upon adding 5000 values to the table randomly
    and then repeating the same number of tests with
    J Meter the average response time for the
    Customer Details page shot up to 3699 ms.
  • The throughput for the page was also very less
    around 12.3 requests / sec

17
Assessment Evaluation continued..
18
Assessment Evaluation continued..
  • The environment used to performance test the
    application is as follows
  • Operating System Windows XP Professional
  • Memory 0.99 GB RAM
  • 80 GB Hard Disk
  • Intel Pentium M Processor 1.7 GHz

19
Project Evaluation
  • The actual duration of the project is
  • Phase I 61 hours
  • Phase II 152 hours
  • Phase III 225 hours
  • Total of 438 hours

20
Project Evaluation Continued..
  • Of the total hours spent on the project nearly
    190 hours was dedicated to coding. Nearly 43.3
    of the whole time was dedicated to coding the
    project.
  • Nearly 80 hours , that is nearly 20 of the time
    was spent on the documentation for the project.

21
Project Evaluation continued..
  • The total lines of code for the project is 4912
    LOC.
  • Out of that

22
Lessons Learnt
  • I have had the chance to develop the project in a
    new technology.
  • I have come into touch with various tools like J
    Meter, SLOC count for counting the number of
    lines of code
  • I have developed a whole project, going through
    all the phases of the project.
  • To be ready for the unexpected

23
Demo
  • DEMO

24
Questions ?