Primary headline goes here Secondary headline - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

Primary headline goes here Secondary headline

Description:

Provide a high-level overview of the documentation changes impacting the LOH or ... http://interconnection.bellsouth.com/guides/usoc/html/gleod010/index.htm ... – PowerPoint PPT presentation

Number of Views:110
Avg rating:3.0/5.0
Slides: 19
Provided by: lice181
Category:

less

Transcript and Presenter's Notes

Title: Primary headline goes here Secondary headline


1
BellSouth 20.0 LOH Overview
2
PURPOSE
  • Provide a high-level overview of the
    documentation changes impacting the LOH or LEO IG
    V2 for the 20.0 production release.
  • This presentation includes summaries of all
    release related item not just those with impacts
    to the LOH or LEO IG V2 documents.
  • Note This presentation is not inclusive of the
    changes made in the LOH. The LSR originator
    should consult the LOH ordering guides when
    submitting LSR requests

3
Features and CRs
  • The following list of features have LOH impact
    and will be discussed in this presentation
  • F-25288 (1260)
  • F-37109 (1907)
  • F-38901 (2183)

4
Features and CRs cont.
  • The following list of features do not have LOH
    impact but will be summarized in this
    presentation
  • F-21863 (n/a)
  • F-35758 (n/a)
  • F-37665 (1980)
  • F-38007 (1928)
  • F-38138 (2025)
  • F-38684 (n/a)

5
F-25288 (CR 1260)
  • Current Process
  • On a request for REQTYP A, ACT D, the system
    requires the user provide NC Code(s), but does
    not validate them against the circuit ID to be
    disconnected.
  • If an incorrect NC code is populated for the
    circuit being disconnected, the order receives a
    SOER error due to mismatch in the BCS on the
    order and BCS from the CSR.
  • Expected Process
  • Upon implementation of this feature, on a request
    for REQTYP A, ACT D, the system will validate the
    NC Code(s) provided against the circuit ID to be
    disconnected.
  • This will allow the request to flow through with
    the correct BCS from the CSR.

6
F-25288 (CR 1260) cont.
  • What is affected with this change
  • LOH changes to ELMS6 and TCIF9
  • Made Rule changes to the NC, NCI, and SECNCI
    fields on the LSR Data Dictionary

7
F-37109 (CR 1907)
  • Current Process
  • CLEC to CLEC Conversions for REQTYP A UNE Loops
    is a manual process only since there is no
    current functionality for REQ A, ACT W.
  • Expected Process
  • Upon implementation of this feature, requests for
    CLEC to CLEC Conversions for REQTYP A can be
    submitted electronically with the ACT of W and
    the order be generated electronically
  • What is affected with this change
  • LOH changes to ELMS6 only
  • Made rule changes to the LSR, EU and LS Data
    Dictionaries,
  • Added R/C/O tables for ACT W for applicable
    REQTYP A products.
  • Removed existing R/C/O tables from CLEC to CLEC
    Conversion product documentation

8
F-38901 (CR 2183)
  • Current Process
  • All Listing Instruction Code (LIC) data, and
    some FIDS, existing in BOCRIS have not been
    categorized for the CSR WBS (CSR Wholesale
    Business System). These codes/fids are not
    supported electronically, and therefore, CSR WBS
    is generating incorrect listing data for this
    subset of un-categorized LICs and FIDs.
  • Expected Process
  • This feature will identify the Listing
    Instruction Codes (LICs), and some FIDs, that
    have not been categorized for the CSR WBS, and
    that can not be supported electronically.
    Functionality will prohibit the entire listing
    that contains these LICs or FIDs from being
    returned on the Parsed CSR fielded section of the
    response message.
  • What is affected with this change
  • LOH changes to ELMS6 and TCIF9
  • Notes made in LOH Pre-Ordering on PCSRR
    Transaction

9
F-21863 (CR n/a)
  • Current Process
  • The USOC UEAL2 is generated on SL1 UNBUNDLED LOOP
    orders, at the CKL-2 location.
  • Expected Process
  • Upon implementation of this feature the system
    will generate the new UEASL USOC instead of the
    UEAL2 USOC at CKL-2 of all SL1 UNBUNDLED LOOP
    orders.  
  • What is affected with this change
  • No LOH changes required for this
    feature.

10
F-35758 (CR n/a)
  • Current Process
  • Today when a LSR is submitted in TN KY and the
    USOC ARZPK appears or is being generated by the
    system, the LSR will fall to center for SAE 009
    Error. A rep must manually add the PKG FID (/PKG
    AP-WITH-CPCH) behind the line class of service
    and all USOCS associated with Complete Choice.
    Currently, there is a date/time stamp field on
    the LENS LSR Summary. However, it only shows the
    date the LSR was submitted-not the time.
  • Today when a LSR is submitted in MS and the USOC
    ARPEC appears or is being generated by the
    system, the LSR will fall to the center for SAE
    009 Error. A rep must manually add the PKG FID
    (/PKG ACP ECONO-CC) behind the line class of
    service and all USOCS associated with Complete
    Choice.
  • When a UPP USOC currently exists on the CSR and
    an LSR is submitted to add (inward activity) the
    system will populate the UPP USOC for the same
    line creating an error on the service order.

11
F-35758 (CR n/a) cont.
  • Expected Process
  • When a LSR is submitted in TN KY and the USOC
    ARZPK appears or is being generated by the
    system, the system will float the PKG FID (/PKG
    AP-WITH-CPCH) behind the line class of service
    and all USOCS associated with Complete Choice.
  • When a LSR is submitted in MS and USOC ARPEC
    appears or is being generated by the system, the
    system will float the PKG FID (/PKG ACP ECONO-CC)
    behind the line class of service and all USOCS
    associated with Complete Choice.
  • When a UPP USOC currently exists on the CSR and
    an LSR is submitted to add a new UPP USOC to
    the same line, the system will O action code
    the existing USOC and I action code the
    requested USOC.

12
F-35758 (CR n/a) cont.
  • What is affected with this change
  • No LOH changes required for this feature.

13
F-37665 (CR 1980)
  • Current Process
  • The Central Office Address and Central Office
    Switch Type are not returned with the address
    data that is returned, when an address is
    validated by TN or Address.
  • The customer must execute two separate queries to
    obtain both the validated address and to view the
    Central Office address information.
  • Expected Process
  • When an address is validated by TN or Address,
    the Central Office Address and Central Office
    Switch Type will be returned with the address
    data that is returned, when an address is
    validated by TN or Address.
  • The View CO Switch Address query will present
    the CO switch type when executed.
  • What is affected with this change
  • No LOH changes required for this feature.

14
F-38007 (CR 1928)
  • Current Process
  • The customer does not have the ability to
    populate data in the access field in LENS.
  • Expected Process
  • The customer will have the ability to populate
    the access field in LENS with data for REQTYP E
    (non-complex) and M (non-complex)
  • What is affected with this change
  • No LOH changes required for this feature.

15
F-38138 (CR 2025)
  • Current Process
  • When an LNP LSR has been submitted, has not
    completed its initial processing, and the CLEC
    runs a status summary query, the system is
    returning an improper status message to the CLEC
    in response to a status summary.
  • Expected Process
  • When an LNP LSR has been submitted, has not
    completed its initial processing, and the CLEC
    runs a status summary query, the message "PON NOT
    FOUND" will be replaced with a message similar to
    "THE REQUESTED PON IS STILL BEING PROCESSED.
    PLEASE TRY AGAIN LATER
  • What is affected with this change
  • No LOH changes required for this feature.

16
F-38684 (CR n/a)
  • Current Process
  • Currently, Pre-Order queries and responses are
    available for both TCIF 9 and ELMS 6.
  • Expected Process
  • Pre-Order queries and responses will be
    developed for ELMS 10.
  • What is affected with this change
  • No LOH changes required at this time. System
    changes are being made in advance of Release 22
    (ELMS10). Actual LOH changes will be made with
    Release 22.

17
  • For more information on 20.0 LOH documentation
    changes please refer to the Summary of Changes
    section of the LOH at
  • ELMS6
  • http//interconnection.bellsouth.com/guides/leo/bb
    rlo_releases/20_0/docs/200-1.pdf
  • TCIF9
  • http//interconnection.bellsouth.com/guides/leo/bb
    rlo_releases/20_0/docs/T-200-1.pdf

18
  • For more information on 20.0 LEO IG V2
    documentation changes please refer to the LEO IG
    V2 at
  • http//interconnection.bellsouth.com/guides/usoc/h
    tml/gleod010/index.htm
Write a Comment
User Comments (0)
About PowerShow.com