NDSTaR 2005 Prototype Mars Planetary Suit - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

NDSTaR 2005 Prototype Mars Planetary Suit

Description:

Suit Construction Progress To Date. Sizing & Geometry May/early June ... Connections to Snoopy Cap. Controls (Vol.,On/Off,channel) Power. Antenna Location ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 23
Provided by: Spst
Category:

less

Transcript and Presenter's Notes

Title: NDSTaR 2005 Prototype Mars Planetary Suit


1
NDSTaR 2005 Prototype Mars Planetary Suit
  • Pablo de León
  • Jennie Untener
  • Mark Williamson

2
Suit Construction Progress To Date
3
Sizing Geometry May/early June
4
Helmet Plug Mold ConstructionJune/early July
5
Hard Upper Torso (HUT) Plug Construction - July
6
HUT Plug Finishing Moldlate July/Early August
7
Prototype Mars Planetary Suit
8
Participating Schools
9
  • 1. Researching Mars climate/geology/etc in the
    equatorial region.
  • 2. Identification of known sites of scientific
    interest with the
  • potential for early human landing access.
  • 3. Comparing/contrasting these Martian sites with
    potential sites
  • around DSU, paying close attention to
    methodology and
  • documentation of selection process, with
    the identifications of
  • possible sites by the end of October
    2005.
  • 4. Becoming familiar with scientific and
    construction-type activities
  • we would like to demonstrate with the
    suit....(DSU may be able
  • to furnish the tools for the
    demonstration.)

10
  • 5. Possibility of demonstrating use of suit
    during simulated surface
  • emergency scenarios.
  • 6. Researching and emulating NASA suit test
    methodologies,
  • perhaps in conjunction with Space Studies
    Department alumni.
  • 7. Identification of all material and resource
    requirements in
  • preparation and execution of the test.
  • 8. DSU will look into the possibility of
    acquiring simulated Martian
  • dust, to test both components
    individually and the entire suit. 
  • 9. DSU will make substantial contributions in
    crafting the sections
  • of the final report dealing with Martian
    environment and suit
  • evaluation.

11
North Dakota State College of Science
  • NDSCS will be doing the machining and prototyping
    of the suits metal parts as
  • Enclosure ring
  • Gloves disconnection rings
  • Boots disconnection rings
  • Shoulder bearings rings

12
North Dakota State Univesity
  • Work is already in progress with team of
    students, lead by Dr. Dan Ewert at NDSU.
  • NDSU will provide the monitoring systems for the
    following heart rate, respiratory rate, body
    temperature, external temperature and humidity.
  • NDSU will also provide the carbon dioxide and
    oxygen sensors for the suit.

13
  • Turtle Mountain is invited to participate in the
    project to develop the wireless system for
    positioning determination, voice and video
    transmission.

14
Incentives of Joining the Team
  • A chance to work and build connections with other
    students and colleges/universities across the
    state.
  • A final product you can say you had a part in
    making.
  • Access to professionals in the field of space
    suit design NASA, Hamilton Sundstrand, etc..
  • Local and regional publicity for your team and
    school.
  • The Dakota Student, The Grand Forks Herald, North
    Dakota Public Radio, UNDs Studio One
  • Minneapolis Star and Tribune
  • 10 days test campaign in April/May 2006, where
    each team will be able to send a couple of
    representatives.

15
Questions?
16
  • TECHNICAL OVERVIEW

17
  • Areas of Participation for TMCC
  • VOICE COMMUNICATIONS
  • VIDEO TRANSMISSION
  • GLOBAL POSITIONING SYSTEM

18
  • Voice Communication
  • Augmented FRB (Channels 1 to 4)
  • Off-the-shelves transceiver
  • Modifications include
  • Connections to Snoopy Cap
  • Controls (Vol.,On/Off,channel)
  • Power
  • Antenna Location

19
  • Video Transmission
  • CCD Color video camera mounted on helmet
  • ATV transmitter
  • Antenna
  • Light (selection,location ,on/off switch).
  • Power
  • ON/OFF Switch
  • Receiving system (tuner,
  • UHF antenna, VCR, monitor)

20
  • GPS, Location and Mapping
  • Transmission
  • Integration of a GPS receiver, Position Encoder
    (Tinytrak 3), 2 Meters transceiver, antenna and
    power interface.

21
  • GPS, Location and Mapping
  • Reception
  • Integration of directional antenna, 2 meter
    receiver, TNC (Terminal Node Controller),
    computer and mapping software using ARPS or
    similar.

22
  • QUESTIONS?
Write a Comment
User Comments (0)
About PowerShow.com