Greening Operational Aspects of the Pentagon - PowerPoint PPT Presentation

1 / 26
About This Presentation
Title:

Greening Operational Aspects of the Pentagon

Description:

Greening Operational Aspects of the Pentagon – PowerPoint PPT presentation

Number of Views:102
Avg rating:3.0/5.0
Slides: 27
Provided by: jimc179
Category:

less

Transcript and Presenter's Notes

Title: Greening Operational Aspects of the Pentagon


1
Greening Operational Aspects of the Pentagon
  • Bob Cox
  • Department of Defense

2
Pentagon at a Glance
  • 6,500,000 gross square feet of space
  • 17 1/2 miles of corridors
  • 7,754 windows (7.1 acres)
  • 30 miles of Access Roads
  • 77,025,000 cubic feet in size
  • 85,000 Light fixtures (250 replacements per day)
  • 4,900 plumbing fixtures
  • Parking for 9,500 vehicles
  • Foot print of 34 acres

3
Introduction
  • DOD contacts EPA for guidance on implementing
    Interim FAR
  • EPA asks DOD to participate in Pilot Projects
  • Work group decides to use consumer approach to
    implementing pilot
  • Federal Government uses its considerable buying
    power to influence industry

4
EPP Parking Lot Pilot Project
  • Researched the Market
  • Identified Environmental Attributes
  • baseline
  • Evaluated EPP Plans in Proposals
  • Provided Contractor a Price Differential
  • continual improvement

5
Washington D.C. Area Parking Lot (before)
6
Repairing the Parking Lot Sealing Cracks with
Recycled Content Sealer
10 crumb rubber
7
Repairing the Parking Lot Milling and
Delivering Asphalt to Recycling Plant
8
Repairing the Parking Lot Delivering and Pouring
New Asphalt
recycled content asphalt base course 25
surface course 20
9
Interior Renovations EPP Pilot Project
  • Researched the Market
  • Cited Environmental Attributes in Contract
  • baseline
  • Will Include EPP Factors in Performance
    Evaluations
  • continual improvement

10
Products Included in Interior Renovation Work
Suspended ceiling tile - 60 recycled
Energy efficient lighting
11
Products Included in Interior Renovation Work
Steel - 28 recycled
Mineral Wool Insulation
12
Products Included in Interior Renovation Work
Gypsum wall board - 100 recycled paper 15
total weight
Low VOC Paints and Sealants
13
Other Products included in Interior Renovation
Pilot
  • Wood from sustainable managed forests
  • Low water use plumbing fixtures
  • Ceramic Tile - 20 recycled
  • Concrete Masonry Units - 50 recycled
  • Construction Debris Recycling
  • Packaging, labeling and instructions made from
    recycled material
  • For more information see
  • http//www.epa.gov/opptintr/epp/

14
Quantities
  • 47,215 linear feet of wood millwork from
    sustainably managed forests. Laid end-to-end, the
    millwork would be 9 miles long.
  • 449 doors from sustainably managed forests.
  • 420,000 square feet of gypsum wallboard (dry
    wall) containing 100 recycled paper on face and
    15 recycled material by weight. Enough material
    to cover more than 9 football fields.
  • 273,222 square feet of recycled acoustical
    ceiling tiles. Enough material to cover more than
    6 football fields.
  • 3,279,000 square feet of low VOC or recycled
    paint. This is equal to nearly 11,000 gallons of
    paint.
  • 59,003 square feet of recycled carpet tile.
  • 53,500 linear feet of 28 recycled steel wall
    studs. Laid end-to-end, this is over 10 miles of
    studs.
  • 496,000 pounds of construction debris has been
    recycled instead of being sent to the landfill.

15
Other Notable Projects
  • Water conservation projects
  • A-76 Cost Comparison Study for OM of HRP
  • New Custodial Contract
  • Solar Hot water
  • Recycling Program
  • No VOC Paint
  • Landscape contract
  • Photovoltaic Cell Farm
  • Fueling station for CNG, Ethanol and Biobased
    Diesel Fuel
  • New OM Contracts
  • New Design-Build Task Order Contract

16
Energy Projects
17
New Custodial Contract
  • Requires environmental stewardship plan which
    includes
  • Affirmative Procurement program for EPP and use
    of products specified in CPG
  • Waste minimization and recycling program

18
New Custodial Contract
  • Requires the use of
  • Bathroom tissue. The bathroom tissue shall
    contain at least 100 recovered materials and 50
    post-consumer content.
  •  Toilet Seat Covers. Toilet seat covers shall
    contain at least 100 recovered materials and 50
    post-consumer content.
  •  Paper Towels. The paper towels shall contain at
    least 100 recovered materials and 40
    post-consumer content.
  •  General Purpose Industrial Wipes. The general
    purpose industrial wipes shall contain at least
    100 recovered materials and 40 post-consumer
    content.

19
New Custodial Contract
  • Plastic trash bags. Plastic trash bags shall
    contain at least 25 post-consumer content.
  •  Waste Collection Carts and Containers. Carts
    and containers used for the collection and/or
    storage of waste material shall be of
    noncombustible or flame resistant construction,
    shall be constructed of environmentally-preferable
    materials, shall roll quietly throughout
    occupied areas of the buildings, and shall not be
    taken inside the office space.

20
New Custodial Contract
  • Requires the Contractor to assist in Government
    recycling program
  • Provides an incentive for active stewardship
    program (Award Fee)

21
A-76 Cost Comparison and OM Performance Contracts
  • Requirement to initiate recycling program that
    diverts 50 of waste stream from landfills.
  • Integration of EPP products into all materials
    used in contract

22
A-76 Cost Comparison and OM Performance Contracts
  • Meet or exceed goals outlined in E.O. 13123 and
    13101
  • Affirmative Procurement Program (EPP/Energy Star)
  • Use of CPG
  • 30 Greenhouse Gas Reduction
  • Selection of Equipment through LCCA
  • Energy Conservation
  • Water conservation

23
New Design-Build Task Order Contract
  • Integrated Sustainable Design
  • Meet or Exceed EO 13101 13123
  • Energy Budgets
  • LCCA
  • Construction Energy Plan
  • Construction Debris recycling 50
  • Use of EPP
  • Building Commissioning

24
New Design-Build Task Order Contract
  • Specific EPP Goals
  • - No materials manufactured with ozone-depleting
    compounds.
  • - No materials manufactured with, or that contain
    Polyvinyl Chloride (PVC) or other chlorine -based
    compounds.
  • - No materials that contain Volatile Organic
    Compounds (VOC).
  • - Use building materials and products that reduce
    greenhouse gas emissions by specifying
    recycled-content, bio-based, and/or industrial
    by-products vs. virgin materials.
  • - Use only dimensional wood and wood products
    certified as originating in certified
    well-managed forests, as identified by the Forest
    Stewardship Council (FSC).
  • - Use only materials that conserve resources to
    the largest extent practical and within the
    parameters of E.O. 13123.

25
Recycling Program
  • Education of building occupants through Earth Day
    and Recycling Week promotions
  • Use of Custodial contract to assist in recycling
    program
  • Development of Desk Guide for Building Managers
  • Development of Metrics to trend data and improve
    program execution

26
Interested in More Information?
  • Bob Cox
  • rcox_at_ref.whs.mil
  • 703-693-3765
  • Or
  • Bob Billak
  • Rbillak_at_ref.whs.mil
  • 703-697-4478
Write a Comment
User Comments (0)
About PowerShow.com