Full chain tests at DAB Andrei Nomerotski, 11/18/2002 PowerPoint PPT Presentation

presentation player overlay
1 / 4
About This Presentation
Transcript and Presenter's Notes

Title: Full chain tests at DAB Andrei Nomerotski, 11/18/2002


1
Full chain tests at DAB Andrei
Nomerotski, 11/18/2002
  • Configuration Hybrid Jumper Cable Junction
    Card Twisted Pair Cable Adapter Card
    Interface Board SASEQ
  • Status full chain working! Things we spent some
    time on
  • Polarity of 3.3 V at AC
  • IB software setup now same as Control Room
  • IB firmware protection mods ignore AVDD2
    ignore current limits
  • Shorted source terminations on AC to boost
    single-ended controls
  • MOD0 MOD1 were swapped
  • Issues to study
  • Signal propagation through twisted pair cable
    jumper cable
  • Signal levels to/from SVX4/AC/IB adequate?
  • Can clock bypass AC ?
  • Any changes to AC design ?
  • Check max/min length of 80/50 conductor cables
  • all issues with power (see 11/04/02 talk by AN)

2
Full chain test
  • Hybrid Jumper Cable Junction Card Twisted
    Pair Cable Adapter Card Interface Board
    SASEQ

3
Full chain test
  • Interface Board readout same as in Control Room

4
1 stand at Sidet
  • SVX4 4-chipper PurpleCard SEQ(SEQC) VRB(VRBC)
    - SBC
Write a Comment
User Comments (0)
About PowerShow.com