DUNDEE CENTRAL WATERFRONT PROJECT PowerPoint PPT Presentation

presentation player overlay
1 / 8
About This Presentation
Transcript and Presenter's Notes

Title: DUNDEE CENTRAL WATERFRONT PROJECT


1
(No Transcript)
2
Critical stages in the roadworks programme have
been tested on the traffic model and adjustments
made to the design. These samples show the pm
peak which is the critical period for South
Marketgait. Be patient when viewing the slide
show. The traffic model takes a few seconds to
load each time.
3
Traffic Model Test
  • Existing Situation

4
(No Transcript)
5
Traffic Model Test
  • Phase 3

6
(No Transcript)
7
Traffic Model Test
  • Final Layout

8
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com