Governance and Efficiency in African Power Utilities the Paradox of Widespread but Ineffective Secto - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Governance and Efficiency in African Power Utilities the Paradox of Widespread but Ineffective Secto

Description:

Waqar Haider, Sr. Energy Specialist, The World Bank. Workshop on 'Energy ... The OPEC Fund for International Development. Transcorp Hilton Hotel, Abuja, Nigeria ... – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 26
Provided by: worl199
Category:

less

Transcript and Presenter's Notes

Title: Governance and Efficiency in African Power Utilities the Paradox of Widespread but Ineffective Secto


1
Governance and Efficiency in African Power
Utilities the Paradox of Widespread but
Ineffective Sector ReformsWaqar Haider, Sr.
Energy Specialist, The World Bank
  • Workshop on Energy Poverty in AfricaOrganized
    byThe OPEC Fund for International
    DevelopmentTranscorp Hilton Hotel, Abuja,
    Nigeria June 9-10, 2008

2
Outline
  • Africas power sector a global outlier
  • Chronic problems anatomy of a crisis
  • Unraveling the four paradoxes
  • Analysis of widespread but ineffective sector
    reforms
  • The way forward

3
Africas power sector A global outlier
4
Meagre infrastructure
Generation capacity (MW per million popn.)
Electricity coverage ( of households)
5
High prices, low consumption
Average revenue (US per kWh)
Power consumption (kWh pc pa)
6
Poor reliability
  • Business sector
  • Face 56 days of outages per year
  • Lost sales revenues
  • 5-6 formal sector
  • 20 informal sector
  • Equipment damage cost 1 sales revenue
  • Most large firms run generators 0.40/kwh
  • Social services
  • Lack of illumination/refrigeration in clinics
  • Absence of lighting affects home study

7
Chronic problems Anatomy of a crisis
8
Causes and catalysts
  • Long term causes
  • Lack of planning
  • Inadequate investment
  • Poor maintenance
  • Short term catalysts
  • High economic growth
  • Rising oil prices (thermal countries)
  • Drought conditions (hydro countries)
  • Destruction of infrastructure by conflict

9
Country taxonomy
10
Widespread load shedding
11
Emergency power leases
12
Unravelling the paradoxes
13
Abundant energy yet little power
  • SSA has substantial energy resources
  • Hydro, oil, gas, coal, geothermal
  • Economic geography problematic
  • Separates supply from demand
  • Huge costs relative to host economies
  • Solution Develop regional power trade

14
High prices but higher costs
  • Average effective tariffs are high but only cover
    capital costs in some cases
  • Average revenues typically cover only average
    operating cost due to low collections
  • Capital subsidies have been substantial but with
    highly regressive incidence
  • Average incremental costs significantly below
    average total costs historically
  • Solutions Work simultaneously to lower costs,
    raise tariffs, and improve equity

15
High expenditure, little finance
  • Power sector spending is significant, but most
    goes on operating costs
  • External financing from traditional sources
    minimal, but new sources
  • Needs assessment suggests doubling of spending,
    tripling of investment
  • Solutions increase external finance, improve
    utility finance, accelerate strategic projects to
    reduce operating costs

16
Analysis of widespread but ineffective sector
reforms
17
Incidence of reform
18
Evolution of PSP
19
SOE governance
20
Efficiency indicators
21
Hidden costs of inefficiency
22
Widespread reform, limited results
  • Substantial experimentation with reform but
    partial and often inappropriate
  • PSP difficult without cost recovery
  • Competition difficult with tiny systems
  • Planning and SOE governance overlooked
  • Sector institutions highly inefficient creating a
    major economic burden
  • Solution Adapt reforms to local context

23
The Way Forward
24
Recommendations (1)
  • Develop a new generation of large-scale,
    transformative generation projects
  • Concerted effort behind key projects -- WB as
    enabler
  • Blend private sector capital and donor support
  • Less risk averse approach to hydro
  • Develop regional power pools
  • Get key inter-connectors in place
  • Develop institutional frameworks (regulations,
    agreements)
  • Surmount political concerns on security of supply
  • Strengthen critical planning capabilities
  • From firefighting to foresight
  • Sector structure mixed economy of incumbent
    utilities and private sector participation

25
Recommendations (2)
  • Utility efficiency and operational improvement
    programs
  • Loss reduction programs (non-technical revenue
    collection)
  • Load management / DSM
  • Low-cost technology standards
  • Financial viability raise tariffs while
    investing to reduce costs
  • Better governance critical
  • Major efforts on capacity building
  • Political and financial commitment required
  • Access expansion imperative redirect capital
    subsidies towards rollout
  • Requires increased donor commitment to multi-year
    programs
  • Target public institutions, lighting for maximum
    development impact
  • Develop institutional models for rural areas
  • Harness technology advances
  • And do it all at once