Reflective%20Evaluation%20Objectives%20and%20Results%20of%20the%20Project - PowerPoint PPT Presentation

About This Presentation
Title:

Reflective%20Evaluation%20Objectives%20and%20Results%20of%20the%20Project

Description:

Gerald Heidegger, Irina Michel, Wiebke Petersen. Objective a Agreements ... University Bremen as well as the coordinator Irina Michel/University Flensburg ... – PowerPoint PPT presentation

Number of Views:67
Avg rating:3.0/5.0
Slides: 14
Provided by: DozBi
Category:

less

Transcript and Presenter's Notes

Title: Reflective%20Evaluation%20Objectives%20and%20Results%20of%20the%20Project


1
Reflective EvaluationObjectives and Results of
the Project
  • First meeting in Monte Gordo, Portugal
  • biat / University of Flensburg
  • Gerald Heidegger, Irina Michel, Wiebke Petersen

2
Objective a Agreements
  • Finding a Basic Agreement on
  • ? Plan for Quality Assurance of the Project
  • ? Concept of Self-Evaluation
  • ? Concept of Empowerment-Evaluation
  • ? etc.
  • Results ? Most of it in Our Heads
  • Until Quality Assurance Plan Month 2/ End of
    November 2005
  • ( full proposal project aim C1/ 3 a)

3
Objective b Analysis
  • To analyse the most important (cultural and
    system-related) requirements for self-evaluation
    in CVT
  • ? Surveys with practitioners and those
    responsible,
  • experts (also social partners) as well
    as
  • participants (case studies)
  • Results National Reports
  • ? Cultural and specific system-related
  • requirements for self-evaluation
  • Until Month 6/ March 2006
  • ? Summarized report in English and
    German
  • Until Month 8/ May 2006
  • ( full proposal project aim C1/ 3 b
    Outcome C2 b)

4
Objective c Restructuring
  • Restructuring and adapting the instrument OSED
    (Quality through Self-Evaluation and Development)
    according to cultural and system-related
    requirements in institutions that have been
    chosen for the gathering of experience in field
    access
  • Result ? New national instruments for
    self- evaluation with specific cultural
    aspects (draft)
  • Until Month 9/ June 2006
  • ( full proposal/ project aim C1/ 3 c Outcome
    C2/ missing )

5
Objective d Online Platform
  • Development of the online-cooperation-platform
    through our e-learning specialized partner Graham
    Attwell
  • ? Direct exchange of suggestions for
    restructuring and adapting the instrument
    ( realizing a new quality of
    cooperative learning from each other on
    European level)
  • Results ? Online - Cooperation Platform
  • Until Month 1- 6/ October 2006 March 2006
  • (English)
  • ? Continuous further development
  • Until Month 12 14/ September 2006 November
    2006
  • ( full proposal/ project aim C1/ 3 d Outcome
    C2/ d )

6
Objective e European Self-Evaluation Instrument
(draft)
  • To develop a European instrument for
    self-evaluation in the sector Continuing
    Vocational Further Development
  • ? It is build on basic agreements and is
    connected through ongoing cooperation with
    consideration to specific cultural and
    system-related characteristics
  • Results ? Draft of summarized instrument with a
    European dimension according to cultural
    and specific system- related peculiarities
  • Until Month 12/ September 2006 ( English and
    German)
  • ( full proposal/ project aim C1/ 3 e Outcome
    C2/ e )

7
Objective f Moderation
  • To moderate this process through the specialized
    partner in e-learning Graham Attwell/ Pontydysgu,
    partner 2 Lars Heinemann/ University Bremen as
    well as the coordinator Irina Michel/University
    Flensburg
  • ? Help to come to an agreement and to combine
    the different suggestions so that the cooperation
    of partners will become a virtual Community of
    Practice
  • Results ? Community of Practice in our minds
    and actions
  • Until ongoing
  • ( full proposal/ project aim C1/ 3 f Outcome
    C2/ f )

8
Objectives g Evaluation
  • To evaluate the instrument according to the
    cultural and specific system-related requirements
  • Results ? National Reports
  • ? Evaluation results of the
    employment of the instrument
  • Until Month 13-16/ October 2006 January 2007
  • ? Summarized report
  • (English and German)
  • Until Month 18/ March 2007
  • ( full proposal/ project aim C1/ 3 g Outcome
    C2/ g )

9
Objective h Optimizing
  • Optimizing the instrument according to the
    evaluation results in its overall cooperative as
    well as cultural and system-related
    characteristics through the online-platform
  • Results
  • ? Temporary final version of the instrument for
    all partners
  • Until Month 20/ May 2007
  • ? Temporary final version of the instrument
    with an explicit European
    dimension
  • Until Month 22/ July (English and German)
  • ( full proposal/ project aim C1/ 3 h Outcome
    C2/ h)

10
Objective i Pool of Materials
  • To provide interested persons in the field with
    an additional pool for materials including
    general aspects of quality assurance and
    evaluation (Month 6 18/ March 2006 April
    2007)
  • ? These moderators are able to work in their
    institutions as change agents and also are able
    to progress further self-evaluation even after
    the finishing of the project
  • Results ? Presentation of Pool for Materials
  • Until April 2007
  • (original versions of the material mainly in
    German, English, French)
  • (full proposal/ project aim C1/ 3 i Outcome
    C2/ i)

11
Objective j Final Report
  • The final results will be completed in
    cooperation with all partners and every partner
    team will be responsible for specific (agreed
    upon) thematic issues
  • Results ? Final Report
  • Until Month 24/ September 2007 (German and
    English)
  • (full proposal/ project aim C1/ 3 j Outcome
    C2/ j)

12
Objective k Quality Management
  • For the quality management the process evaluation
    of the projects progress will be monitored
  • Results ? Report about process evaluation
  • From/ Until ongoing/ Month 1-24 (English)
  • (full proposal/ project aim C1/ 3 k Outcome
    C2/ k)

13
Objective l Valorisation
  • From the beginning of the project and even after
    the finishing of the project a continuing
    dissemination of the project results and interim
    results will be carried through according to the
    valorisation plan
  • Results ? Distribution of Flyer
  • Time Month 6, 21
  • ? National reports about valorisaton
    activities of partners
  • Time Month 8, 16, 22 (English)
  • (full proposal/ project aim C1/ 3 l Outcome
    C2/ l m)
Write a Comment
User Comments (0)
About PowerShow.com