On-Line cleaning system for chiller condenser tubes ... Eliminates the risk of tube damage. The BallTech System. Westmead hospital - Sydney ... – PowerPoint PPT presentation

Number of Views:110
Avg rating:3.0/5.0
Slides: 18
Provided by: michael1372
Category:

less

Transcript and Presenter's Notes

Title: The BallTech System


1
The BallTech System
  • On-Line cleaning system for chiller condenser
    tubes

2
  • The efficiency of water cooled condensers
    deteriorates over time due to fouling of the
    tubes.
  • Fouling is recognised as an unavoidable
    performance impediment by chiller manufacturers
    and is allowed as part of their design spec.
    described as fouling factor.
  • This deterioration in condenser efficiency
    adversely affects the chiller C.O.P. (Co-efficient
    of performance)
  • A chillers output per unit of energy consumed by
    its compressor is described as the chiller C.O.P.
  • A deterioration of the chiller C.O.P results in
    an unnecessary increase in energy consumption.

3
Effect of Scale on Energy Consumption of Chillers
Source Philip KotzClean System Approach to Air
ConditioningHeating Piping Air Conditioning
Journal
4
  • Microbiological film, which is prevalent in all
    chillers, impedes heat transfer at a greater rate
    than scale.
  • Scientific evidence has shown that
    microbiological film deposited on a condensers
    tubes surface has five times the heat transfer
    reduction effect of a layer of scale at the same
    thickness.

5
Source N. Zelvar, WG. Charackils FL.
RoeCooling Tower Institute Houston Texas USACTI
Paper No. TP239A
6
  • condensers are affected by biofilm growth and
    other hard sediments like scale.
  • Chemical treatment can only control the fouling
    but cannot eliminate it.
  • Regular mechanical cleaning is required to
    maintain condenser efficiency within acceptable
    limits.

7
The Alfred Hospital Chiiller 4Microscopic view
of condenser tubes without the BallTech System
8
The Alfred Hospital Chiller 3 With BallTech
system
9
Online cleaning has the greatest potential
advantage for a plant owner
  • Reduces energy consumption
  • Reduces water consumption
  • Reduces chemical consumption
  • Reduces maintenance costs
  • Eliminates the risk of tube damage

10
The BallTech System
11
(No Transcript)
12
Westmead hospital - Sydney
13
Melbourne Airport
14
The Alfred Hospital Chiller 3
15
Measuring and Verification
  • Chiller output is calculated after measuring the
    chilled water flow rate and the difference in the
    chilled water temperature across the evaporator.
  • Measuring the chiller C.O.P under the same steady
    state conditions before and after mechanical
    cleaning or BallTech installation will illustrate
    the chiller improvement and highlight the impact
    of fouling on operational efficiency.
  • The results demonstrate the energy savings
    achieved by maintaining perpetually clean
    condenser tubes.

16
385 Burke St. Melbourne
17
Pay back period
  • Return on investment will be a function of
  • System cost
  • Energy cost usage and peak demand
  • Annual chiller operating hours.
  • Annual average chiller load.
  • In addition - water, chemical and maintenance
    savings will be observed after the first year.
  • The typical payback period for an office building
    is between 2 and 3 years.