NANC Report Numbering Administration Oversight Working Group

Description:

Karen Mulberry, WorldCom. Jim Castagna, Verizon. 11/19/2002. NAOWG NANC Report. 2. Summary. Report and Recommendation on PAS Forecasting Requirements ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 10
Provided by: KarenMu6
Learn more at: https://nanc-chair.org
Category:

less

Transcript and Presenter's Notes

Title: NANC Report Numbering Administration Oversight Working Group


1
NANC Report Numbering Administration Oversight
Working Group
  • November 19, 2002
  • Co-Chairs
  • Karen Mulberry, WorldCom
  • Jim Castagna, Verizon

2
Summary
  • Report and Recommendation on PAS Forecasting
    Requirements
  • 2002 NANPA Performance Survey, Cover Letter and
    Timeline
  • Status of 2002 NANPA PIP Items
  • Outstanding PA Change Order Review
  • Meeting Schedule
  • Attachments - Tracking Documents
  • PA Change Orders
  • Table of NANPA Complaints
  • Project Status Table

3
Report and RecommendationPAS Forecasting
Requirements
  • Investigated and analyzed PAS requirements
  • Determined whether requirements or guidelines
    intended to require PAS to create an environment
    where block applicants would be
  • Denied resources if the quantity of blocks
    requested in a particular month exceeded the
    quantity of blocks forecasted and,
  • Required to submit a replacement forecasted
    before applying for additional blocks.
  • Concluded that the PAS design conflicts with
    stated requirements.
  • Recommendation
  • That PAS be modified to allow applicants to be
    assigned thousands blocks if there is a
    sufficient supply of blocks in the pool.
    Concluded that applicants are not required to
    update their forecast even if they are requesting
    more blocks than was forecasted for a particular
    month.

4
2002 NANPA Performance Survey Cover Letter and
Timeline
  • Modified 2001 Survey, added questions related to
    the NANPA Code Administration System (CAS)
  • Solicited comments from NANPA and revised the
    survey accordingly.
  • Final Survey presented for NANCs endorsement
  • (See attachment)
  • Survey Timeline
  • 11-20 NANC review and approval
  • 11-22 Survey distribution by the NANPA, and
    Industry Associations etc.
  • 12-31 Completed survey due date
  • 3-03 WG to present final report to NANC

5
Status NANPA 2001-2002Performance Improvement
Plan
  • PIP 1 - Code Administration System (CAS)
  • Working on CAS changes
  • Insert negative numbers (code returns) when
    preparing the code application Months-To-Exhaust
    (MTE) worksheet
  • Specify more than on NPA when applying for a code
    in an overlay environment
  • Designing email campaign targeted at Part 1
    Applicants who still do not use CAS to increase
    CAS usage beyond the current level of 30.
  • Studying ways to contact SPs to initiate data
    (CAS, LERG and NRUF) discrepancies project, 792
    OCN mismatches - considered most critical
    discrepancies.
  • Still developing a plan for reconciling CAS
    capabilities with original Lockheed Martin
    proposal.
  • PIP 2 - NANPA Web Site
  • Added new navigational assistance page
  • Still working on search engine.
  • PIP 3 - Code Administration
  • A new Performance Metric (PM) added to measure
    code rejects
  • WG reached agreement that the mechanization of
    the application process for CIC, 500, 900 and 555
    resources should be tabled at this time. There is
    a lot of interaction between the NANPA and
    applicants using paper, which if eliminated,
    would greatly inhibit NANPAs ability to perform
    the checks and balances required.

6
Status NANPA 2001-2002Performance Improvement
Plan
  • PIP 4 - Relief Planning
  • Checklist developed for standard package of
    information to be used at all initial relief
    planning meetings to ensure uniformity
  • Standardized Planning Letter (PL) proposed and is
    under development based upon input by the
    industry, the NAOWG and NANPA.
  • PIP 5 - NRUF
  • NANPA agreed to send monthly updated NRUF
    information to states desiring new reports when a
    SP provides new NRUF data. In some instances in
    the past, SPs had been approached by PUCs who had
    old reports that did not reflect the latest SP
    information
  • PIP 6 - Measurements
  • Three new Performance Metrics (PM) were added to
    the NRUF metric report to track NANPAs
    performance. Most notable is providing timely
    notification to SPs that need to provide
    additional NRUF data
  • PIP 7 - General
  • NANPA has performed and participated in several
    activities in support of this PIP which tracks
    NANPAs ability to take leadership roles on
    numbering issues that affect administration and
    distribute and explain FCC directives regarding
    numbering administration.

7
Outstanding PA Change Order Review
  • Received direction from the FCC to begin
    reviewing PA Change Orders and preparing
    recommendations
  • Completed initial review of all outstanding
    Change Orders
  • Working to developed recommendation template
  • As needed, composing questions for
    clarification based on WGs review of each
    change order
  • Working to finalize recommendations

8
Upcoming Meeting Schedule
Contact either of the Co-Chairs for complete
meeting or conference call details WG meeting
records and documents posted on the NANC Chair
web site
9
Attachments - Tracking Documents
  • Analysis and Report on Pooling Administration
    (PAS) Forecasting Requirements
  • 2002 NANPA Performance Feedback Survey
  • PA Change Order Tracking Report
  • Table of Complaints filed via the NANPA web site
    -
  • WG assessing need for process/procedures
    changes
  • Project Table - tracking WG Activities/Timelines