CGN Technische Thema Avond Veranderingen 2004 - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

CGN Technische Thema Avond Veranderingen 2004

Description:

CGN Technische Thema Avond Veranderingen 2004 – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 17
Provided by: brianyothe
Category:

less

Transcript and Presenter's Notes

Title: CGN Technische Thema Avond Veranderingen 2004


1
CGNTechnische Thema Avond Veranderingen 2004
  • 20-November-2003Hilversum

2
Agenda
  • Entry/exit
  • 70-130 scoring
  • Feedback form
  • Sound leveling and control
  • General QA

3
Entry and exit(illustration)
Unit B(next on)
Unit A(end of performance)
Intervaltijd (Unit B) begint !
Intervaltijd (Unit A) beëindigd !
4
Entry exit
  • Units now signaled to enter competition floor
    (left side only) before interval time begins.
  • Unit can set left side of floor before interval
    time begins
  • When signaled interval time begins (previous unit
    through the exit curtain), the middle line can be
    crossed to complete setup
  • Interval time ends when you have cleared the left
    side of the floor (ready for next unit to enter).
  • The period to clear right side of floor and go
    through exit curtain is not timed.

5
Questions
6
70-130 - New Score distribution
  • I.A. (Equip and Movt) in Cadet, Prep, A Class
  • Emphasize training and achievement
  • Vocabulary max 7.0 points - 14 (i.p.v. 20)
    of score
  • Excellence max 13.0 points - 26 (i.p.v. 20)
    of score

7
Criteria Reference the BOX system
Box 5
Box 4
Box 3
Box 2
Box 1
8
Arriving at a score(Cadet/Prep/A illustration)
Analysis
Box 5
Box 4
old new Voc 6574 46-52 Exc 65-74 76-88
Impression
Box 3
Box 2
Box 1
9
Scoring comparison
10
70-130
11
Questions
12
Jury Feedback Form
  • Aim is to increase the quality of judging in CGN
  • Official communication to the T.C. NOT to the
    judge (not an extended critique)
  • Voluntary - can be used for
  • Issues/concerns about accountability or tape
    dialogue
  • Feedback about good judging insight / valuable
    information

13
Questions
14
Sound / volume control
  • Contest Director responsible for monitoring sound
    level during performances (using meter)
  • Sound check used to understand the level in the
    hall no interaction during performance time
  • Unit may have multiple versions of soundtrack
    prepared and choose most suitable during sound
    check only.

15
Questions
16
Any other questions?????
Write a Comment
User Comments (0)
About PowerShow.com