Title: WirelessMAN UK Position BWA 11GHz
1WirelessMAN UK Position BWA gt11GHz
Andy Gowans on behalf of Stephen Talbot Principal
Engineer Broadband Fixed Wireless Access 28 40
GHz UK Radiocommunications Agency
2Broadband FWA gt 11GHz
- 26 GHz
- Not available - Used for Mobile Infrastructure
- Point to Point links only
- 28 GHz (UKs 26 GHz Band)
- 2nd Award just closed (Oct 14th, 2002)
- Spectrum block, area assigned
- 16 of the 42 Licenses Awarded
- 32 GHz (31.8 - 33.4 GHz)
- Top third for P-P links, assigned by RA
- Decision pending on remaining two thirds
3Broadband FWA gt 11GHz
- 38 GHz
- Point to Point links, RA assigned
- Any service delivery, backhaul or access
- Some used for BWA delivery
- Assigned on a per link basis by RA
- 58 GHz
- 57.1 - 58.9 GHz
- Point to Point links, licence exempt
- Licence exemption order 12th February 2003
4Spectrum Detail 28 GHz
- 28 GHz (UK/CEPT)
- 28.0525 - 28.4445 29.0606 - 29.4525 GHz
- Drawn from CEPT decision ECC/DEC(00)09
- Aligned through CEPT, 17 States YES
- UK 3 licences in 14 Regions (2 x 112 MHz each)
- 28 GHz (US)
- 27.5-28.35 GHz paired with
- 29.1-29.25 GHz, 31.075-31.225 GHz
- US and UK/CEPT allocations do not align
- Teledesic band overlaps UK/CEPT plan
5Spectrum Detail 28 GHz
- Architecture
- Technology neutral
- FDD or TDD
- Point to Point, P-MP and Mesh
- Service delivery
- Originally only Access, no 3rd party backhaul
- Licence changes recently, to allow backhaul
- Spectrum Trading
- 28 GHz licensees maybe one of first
- First stages of trading 2004, much work to
complete
6(No Transcript)
7Licence Detail 28 GHz
Auction Reserve Prices 2,000,000 Region
D Isle of Wight, Hampshire, Berks and Oxon - 3
available Region E Essex, Herts and Bucks - 3
available Region F Suffolk, Norfolk, Beds, Cambs
and Northants - 3 available Region G Derbyshire,
Lincolnshire (part), Leics, Notts, and Rutland -
3 available Region H Kent, Surrey, East and West
Sussex - 3 available Region I Yorkshire and
North and North-East Lincolnshire - 1
available 1,000,000 Region J Cumbria,
Lancashire and NE England - 2 available Region
K Wiltshire and Gloucestershire and SW England -
3 available Region L Scotland - 2
available Region M Wales - 3
available 100,000 Region N Northern
Ireland - 1 available
828 GHz Consultation on Next Steps
- Remaining licence packages (26 of 42)
- Smaller areas, on UK Counties, Operator defines
area and Individual planning and licensing of
base stations? - Industry Views so far
- Retain technology neutrality
- Retain, inter-operator co-operation
- Reserve prices?
- consultation closes 21st March
- Next award towards Q3 of 2003
9Spectrum Detail 28 GHz
10Spectrum Detail 42 GHz
- 42 GHz (40.5 - 43.5 GHz)
- Originally Broadcasting - MVDS
- Originally Extension for Cable operators
- Originally One way, analogue limited digital
- Changes In Focus
- Data Access - Two-Way
- Internet, Data, Video on Demand?
- All 3GHz up for grabs
- Award plans being formed over next 18 months
11Spectrum Detail 42 GHz
- Considerations for award
- CEPT ECC/DEC(99)15 - MWS Defined
- CEPT ECC/REC(01)04 - Allocation Style
- CEPT ECC/DEC(02)04 - FSS Terminals
- EU Licensing Directive Fair and Open
- Technology Neutral
- Larger market for Vendors and Operators
- RA committed to all factors
12UK Position on 40.5 - 43.5 GHz The History
- 2002
- Discussions with industry initiated by the RA,
regarding the use of 40.5 - 43.5 GHz
13UK Discussions - 42 GHz
- Industry invited to Give view
- Potential Operators
- Vendors
- Content Providers
- Current 28 GHz licensees
- Questions Asked
- What is your interests in BFWA at 42 GHz?
- Equipment costs and availability?
- Licensing arrangements?
- License conditions?
14Industry Told Us
- Licenses
- Should be for 15 - 20 years
- Renewable and payable by instalments
- Be a mix of National and Regional
- No restrictions on traffic carried (backhaul)
- Pioneer licenses?
- Technology
- All types allowed
- None to be proscribed
15Industry Told Us
- Spectrum
- Packages 250MHz minimum (500MHz ideal)
- Some support for contiguous blocks (TDD vendors)
- No coverage obligationsÂ…but
- Safeguards against Spectrum Hoarding
- Services
- Bundled services, to maximise revenue
16Industry Told Us
- Market
- SMEs and Medium size businesses, first
- Then, in time, residential but this is key
- Time-scales
- Some (not all) felt too early for award
- Market not ready for more spectrum
- Consultation should be published in 2003
- Agency then to publish time-table
- Market then ready, around 2005
17IEEE 802 view ?
- NO IEEE 802 VIEW RECEIVED.
- ALTHOUGH CONSULTATION CLOSED
- AGENCY WOULD LOOK AT ANY INPUT
- TO THE PROCESS.
18Spectrum Issues at 42 GHz
- Global Considerations
- CEPT/European position clear for band
- World Radio Conference 2003 (June)
- US proposal for 40 - 42 GHz Global Satellite
HDFSSONLY? HDFSS High Density Fixed Satellite
Service - Radio Astronomy Service
- UK has strong interest
- Two UK RAS sites require protection
- Two ITU-Recommendations (UK inputs) considered by
RAS ITU-R Study Groups
19Spectrum Allocations - UK
- Professor Cave Independent Spectrum Review 2002
- Auctions encouraged
- Spectrum Trading
- No roll out obligations, No service restrictions
- Technology Neutral
- Competition Issues - Monitored
- RA agreed with majority of recommendations
20Further questions on 28/42GHz in the UK
to stephen.talbot_at_ra.gsi.gov.uk http//www.radio
.gov.uk/ Thank you for your time Docs from
http//www.ero.dk Sections Decisions
Recommendations