Lunar soil experiment: DA and related PowerPoint PPT Presentation

presentation player overlay
1 / 3
About This Presentation
Transcript and Presenter's Notes

Title: Lunar soil experiment: DA and related


1
Lunar soil experiment D/A and related
  • Andreas Heinz

2
MA
ADC
SCALER
Gate
?E
PA
TFA
CFD
50 O Star
DELAY
OR
GG
FIFA
TFA
CFD
Gate
E
SCALER
PA
ADC
MA
Trigger 1. 1 Hz clock 2. ?E/E OR
Time stamp
SCALER
CLOCK
100 MHz or 100 kHz
SCALER
SCI
PM
TFA
CFD
RATEMETER
3
Summary
  • We start with the scintillator only and look at
    the analog rate meter first and take data with a
    1 Hz clock as trigger.
  • The scintillator rate is measured with a scaler.
  • Once the rate is low enough we switch to the ?E-E
    telescope and an or of the two signals is the
    trigger.
  • All events will be time-stamped (probably an
    overkill at this point).
Write a Comment
User Comments (0)
About PowerShow.com